My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Photo K Photo L <br /> 10. WIRING INSIDE THE ELECTRONICS COMPARTMENT. (SEE PHOTOS H, M & N) <br /> ❑ Secure the prewired Interface Module to the inside, between the two cross rails in the <br /> electronics compartment using the 8-32 screw, nut and washer supplied, see photo H. <br /> ❑ The wiring kit contains one jumper assembly. To install the jumper assembly, connect the <br /> stripped wires, one to terminal 1 of the solenoid disconnect relay, see photo H, and the other to <br /> terminal 6 of the same terminal block. <br /> ❑ Identify the P1200 location on the valve converter board and remove the connector from the <br /> socket on the board. Insert this connector into the mating socket on the jumper assembly. <br /> Insert the matching plug on the cable into the J1200 location on the board, see photos M & N. <br /> �w r <br /> r a - <br /> .!r P1200 <br /> P1200 P1204 A&B <br /> Photo M (300) Photo N (500) <br /> ❑ Using the cable harness attached to the module, identify and segregate the "A" side and <br /> "B" side connectors. The valve board connections are arranged by product, so it is important <br /> to be sure the "A's" and "B's" are connected to the appropriate sockets on the board. Connect <br /> the `signal' inputs Al, 2, 3 and B1, 2, 3 male/female connectors on the cable to the appropriate <br /> locations on the valve converter board. Be sure to keep the "A's" and "B's" together as there <br /> are "A's" and "B's" on both sides of the valve converter board. Note only connect the module <br /> to active gasoline products — do not connect to diesel or other unused valve connection <br /> op ints• <br /> 8-10 <br /> CARR Approved IGM 8-Gilbarco Enure 300 B 5D0 Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.