My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Disconnect any cables coming thru the upper <br /> conduit plate located in the cd module the <br /> plate. Remove the upper & lower conduit <br /> plates by removing (2) screws from each plate. ... . <br /> See Picture 014. — <br /> a ear <br /> Picture 017 <br /> o. Locate the Healy subassembly below the lower <br /> air gap plate and secure it to the plate with (4) <br /> screws. You will have to feed the wires from <br /> Picture 014 the conduit thru the openings of the lower air <br /> gap plate & cd module. See Pictures 018, <br /> m.Remove the correct knockout from both 019, 020. <br /> conduit mounting plates using a hammer & flat <br /> head punch. See Picture 17 for correct hole <br /> location to knock out. <br /> � y <br /> Picture 018 <br /> Picture 015 <br /> n. Remove the Auxiliary junction box from the <br /> Healy subassembly by removing the nut from <br /> the stud on the back of the box. Unhook the <br /> conduit & union assembly from the box by <br /> loosening the large nut on the union. See <br /> Pictures 016, 017. Picture 019 <br /> Picture 016 <br /> Picture 020 <br /> 8-2G <br /> CARB Approved IBM 8-Gilharco Enure 300 B 500 Series-Executive Orders VR-281 and VR-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.