Laserfiche WebLink
s the <br /> Q: Technical Specifications, Section 11000,Part 2.02.8.7. l loeuma response set- <br /> achine <br /> Interface (Bl1 fl) require an on-site PC to modify the logic or <br /> points? <br /> A: No, the Owner does not intend to'modify or re-program the control logic initially provided <br /> by the flare control supplier. <br /> Q• <br /> Technical Specifications, Section 11000, part 2.02.B.7. What are the specific data . <br /> acquisition requirements of the SCADA Program? <br /> A: The Owner desires to be able to store, access, avers retrieve over u rtoteer- telecor i mmu ications <br /> link) a minimum of seven days of facility data, a g q <br /> including: <br /> • Landfill gas flow <br /> • Flare combustion temperature <br /> • Condensate tank level and injection flow rate <br /> the <br /> Q. Technical Specifications, Section 11000,Part 3.03. If the flare does not pass cost for subsequent repeat testing? <br /> tial <br /> compliance test provided by the Owner, who bears the co <br /> A. The Contractor and/or the flare supplier. <br /> General <br /> B: Technical Specifications, Section 01010,Part 1.15. Is the Contractor required to obtain <br /> an Authority to Construct(ATC)permit from the San Joaquin Valley Unified Air Pollution <br /> Control District(SJWAPCD), in addition to building permits and business licenses? <br /> A: No. The Owner has submitted an application for the ATC based on the project plans, and <br /> application review and permit issuance are in progress. The Contractor's <br /> lareere sub from <br /> may be subject to review and approval by the SJ <br /> pp VLTAPCD, if significantly <br /> that shown on the project plans(Technical Specifications Section 11000,Part 2.02.A). <br />