Laserfiche WebLink
TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance Significance <br /> Before Mitigation After Mitigation <br /> Potential Impact Measures Mitigation Measures Measures <br /> requirements, resident notification of access closure, and <br /> daily access restoration.The contractor shall specify dates <br /> and times of road closures or restrictions,if any,and shall <br /> ensure that adequate access will be provided for <br /> emergency vehicles. The Traffic Control Plan shall be <br /> reviewed and approved by the County Department of <br /> Public Works and shall be coordinated with the County <br /> Sheriff's Department and the Montezuma Fire District if <br /> construction will require road closures or lane restrictions. <br /> g)Wildland Fire Hazards NI None required. - <br /> 3.10 HYDROLOGY AND WATER QUALITY <br /> a)Violation of Water Quality Standards LS None required. - <br /> b) Groundwater Supplies and Recharge LS None required. - <br /> c-i,ii) Drainage Patterns LS None required. - <br /> c-iii) Runoff LS None required. - <br /> c-iv) Flood Flows LS None required. - <br /> d) Release of Pollutants in Flood Zone NI None required. - <br /> e) Conflict with Water Quality or Sustainable NI None required. - <br /> Groundwater Plans <br /> 3.11 LAND USE AND PLANNING <br /> a)Division of Established Communities NI None required. - <br /> Pock Lane Public Review Draft IS/MND 1-16 May 2022 <br /> LEGEND: NI = No Impact; LS=Less Than Significant; PS=Potentially Significant <br />