Laserfiche WebLink
TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance Significance <br /> Before Mitigation After Mitigation <br /> Potential Impact Measures Mitigation Measures Measures <br /> b) Conflict with Applicable Plans, Policies and LS None required. - <br /> Regulations Avoiding or Mitigating Environmental <br /> Effects <br /> 3.12 MINERAL RESOURCES <br /> a,b) Loss of Mineral Resource Availability NI None required. - <br /> 3.13 NOISE <br /> a)Exposure to Noise Exceeding Local Standards PS NOISE-1: Project contractors shall use newer equipment LS <br /> with improved muffling and ensure that all equipment <br /> items have intact and operational the manufacturers' <br /> recommended noise abatement measures, such as <br /> mufflers,engine enclosures,and engine vibration isolators. <br /> All construction equipment shall be inspected at periodic <br /> intervals to ensure proper maintenance and presence of <br /> noise control devices (e.g., mufflers, shrouding, etc.). In <br /> accordance with the California Air Resources Board's <br /> Regulation for In-Use Off-Road Diesel-Fueled Fleets,idling <br /> of construction equipment for more than five minutes shall <br /> be prohibited unless an activity is specifically exempted by <br /> the Regulation. <br /> b) Groundborne Vibrations LS None required. - <br /> c)Exposure to Airport/Airstrip Noise LS None required. - <br /> 3.14 POPULATION AND HOUSING <br /> a)Population Growth Inducement LS None required. - <br /> b,c) Displacement of Housing and People NI None required. - <br /> Pock Lane Public Review Draft IS/MND 1-17 May 2022 <br /> LEGEND: NI = No Impact; LS=Less Than Significant; PS=Potentially Significant <br />