My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 12:56:54 PM
Creation date
4/14/2021 12:42:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
autie A. Cotulla, REHS, Program Manager <br />rivironmental Health Division <br />Donna Gardner <br />Page 2 <br />The selection of the remedial alternative will be only upon review and consideration of comments received <br />during the public comment period. The public comment period for the draft FRP will extend thirty (30) days <br />from receipt of the proposal. <br />Also due by March 21, 1991, is the first quarterly monitoring report pursuant to Section 2652(d) of the <br />underground storage tank regulations (California Administrative Code, Title 23, Subchapter 16). The <br />monitoring report shall be submitted to PHS/EHD and Central Valley Regional Water Quality Control Board <br />(CVRWQCB) (monitoring) until the investigation and cleanup of the site is deemed adequate. The report <br />is to show: <br />-status of investigation and cleanup activities including the results of al all <br />investigations completed to date; <br />-proposed continuing or next phase of investigation; <br />-method of cleanup proposed or implemented, schedules for the completion of the <br />investigation of the site and remediation; <br />-monitoring well data including groundwater elevation, pH, conductivity, gradient; <br />-analytical results of groundwater or soil sampling; and <br />-a site map showing the "zero line" of contamination, if known, and changes in the <br />above measurements over the last quarter. <br />The Thornton Municipal Well #2 should also be analyzed during these sampling events. <br />If you have any questions, contact Eleanor Ratliff, REHS, of my staff at (209)468-3454. <br />Jogi Khanna, M, ., M.P.H. <br />Health Offic <br />C: CVRWQCB <br />c: WaterWork Corporation
The URL can be used to link to this page
Your browser does not support the video tag.