My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance(W Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> Construction Quality Assurance Staff. Reporting responsibilities may be adjusted by <br /> the Owner, as needed. <br /> 9.3 Document Format <br /> This CQA Plan is divided into the following five sections: <br /> ♦ Section 1 is the introduction and presents the document format and <br /> definitions and terms used throughout the document. <br /> ♦ Section 2 presents general requirements of the CQA program and <br /> organization. <br /> ♦ Sections 3 and 4 present special requirements for specific work items of <br /> the construction, including procedures such as materials verification,test <br /> standards, testing frequencies,conformance and construction testing, and <br /> construction monitoring for each work item. <br /> ♦ Section 5 presents methods of documentation and record keeping. <br /> All parties involved in the construction will be thoroughly familiar with this document, <br /> the project construction drawings, and the technical specifications. <br /> 9.4 Reference Documents <br /> The following reference documents provide background information and support this <br /> CQA Plan for construction: <br /> ♦ American Society for Testing and Materials (ASTM) Annual Book of <br /> ASTM Standards. Section 4 Construction, Volume 04.02 Concrete and <br /> Aggregates. <br /> ♦ American Society for Testing and Materials (ASTM) Annual Book of <br /> ASTM Standards. Section 4 Construction, Volume 04.08 Soil and Rock(I), and <br /> Volume 04.09 Soil and Rock(II) <br /> ♦ American Society for Testing and Materials (ASTM) Annual Book of <br /> ASTM Standards. Section 8 Plastics, Volumes 08.01 Plastics (I), 08.02 <br /> Plastics (II), and 08.03 Plastics (III). <br /> ♦ American Association of State Highway and Transportation Officials <br /> (AASHTO), Specifications and Volume II Tests. <br /> Vector Engineering, Inc. 9143E Spring Hill Drive•Grass Valley, CA 9(530)272-2448 <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.