Laserfiche WebLink
Harney Lane D.S. Page 2 of 4 <br /> 39-AA-03 <br /> 17708 - Drainage and Erosion Control <br /> Drainage for the lift under construction was not adequate. Water <br /> was ponded at several places on the lift (Slides 18, 43, 45, 49) . <br /> In an attempt to correct this problem, operators had excavated a <br /> temporary drainage ditch in previously covered waste. However, <br /> water was ponded in the ditch and had come into contact with <br /> exposed waste (Slides 30, 32, 33, 34, 35, 36, 37, 38) . <br /> 17709 - Contact with Water �­ <br /> Q5 <br /> I observed waste in contact with water where a drainage ditch had <br /> been excavated in previously covered waste (Slides 30, 31, 32, <br /> 33, 34, 35) . <br /> 17710 - Grading of Fill Surfaces <br /> Ponding was observed in numerous locations during the inspection <br /> indicating that fill surfaces had not been graded to promote <br /> runoff (Slides 39, 40, 41, 42, 43, 44, 46, 47, 48, 49, 50) . <br /> Note: <br /> Operators are in the process of adding additional lifts to the <br /> site in order to achieve a 3% slope on fill surfaces as directed <br /> by the Central Valley RWQCB to meet Subchapter 15 requirements. <br /> Operators hope to have a 1% slope on the site by the beginning of <br /> the 1987 rainy season. The required 3% slope is scheduled to be <br /> met in three years. <br /> INDETERMINATES <br /> Complinace with the following CAC Sections was given an <br /> indeterminate status pending further investigation. The site <br /> was found in complinace with all other applicable standards. <br /> 17667 - Water Supply <br /> Drinking water is provided by an on-site well and is tested <br /> quarterly. However, the Central Valley RWQCB was determined that <br /> the tests conducted are inconclusive in determining the water <br /> safety for drinking. Mark Urquhart, Project Engineer, stated <br /> that more complete tests would be run in the near future and that <br /> results would be sent to Board staff. A decision on site <br /> compliance with CAC Section 17667 is deferred pending the results <br /> of these tests. <br />