My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014093
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
2706
>
2600 - Land Use Program
>
PA-2100062
>
SU0014093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 4:23:22 PM
Creation date
5/25/2021 7:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014093
PE
2611 - SUBDIVISION - MAJOR (SU)
STREET_NUMBER
2706
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205
APN
17912013, 11, 14
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2706 S POCK LN STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR -99 Frontage Road. The posted speed limit is 25 mph on both portions of <br />Loomis Road, and parking is permitted where there is adequate shoulder width. <br />Loomis Road provides direct access to both 2706 Pock Lane and the northern <br />portion of 3009 Pock Lane. <br />State Route 99 (SR -99) is a six lane, north -south freeway east of the project site. <br />SR -99 is a key regional highway that extends from Sacramento in the north to the <br />Grapevine south of Bakersfield, connecting major cities in the Central Valley. In <br />the project vicinity, the posted speed limit is 65 miles per hour (mph). <br />Dr. Martin Luther King Jr. Boulevard/Charter Way is a principal east -west <br />arterial north of the project site, connecting SR -99 and Interstate 5. Within the <br />project vicinity, this roadway is generally four lanes wide, with a posted speed <br />limit of 45 mph. <br />Mariposa Road is a two- to four -lane, generally northwest -southeast arterial north <br />and east of the project site. In the project vicinity, the San Joaquin County <br />General Plan designates Mariposa Road as a principal arterial between Dr. Martin <br />Luther King Jr. Boulevard and SR -99, and a minor arterial east of SR -99. The <br />posted speed limit on Mariposa Road is 45 mph northwest of 8th <br />Street/Farmington Road and 50 mph southeast of 8th Street/Farmington Road. <br />8th Street is a two lane, east -west major collector north of the project site. It <br />extends from Airport Way to the west to Mariposa Road to the east, where it <br />changes designation to Farmington Road. The posted speed limit on 8th Street is <br />35 mph, and on -street parking is permitted along much of its length. <br />Farmington Road is a generally two-lane, east -west arterial northeast of the <br />project site. It extends east of Mariposa Road and is designated as SR -4 east of <br />Golden Gate Avenue. There is no speed limit posted on Farmington Road. <br />B Street is two lane, north -south major collector west of the project site. It <br />extends from Dr. Martin Luther King Jr. Boulevard in the north to just south of <br />Arch Airport Road. The posted speed limit is 35 mph north of 4th Street and south <br />of Ralph Avenue (within the City of Stockton), and 25 mph between 4th Street <br />and Ralph Avenue (within unincorporated San Joaquin County), and on -street <br />parking is permitted along much of its length. <br />Carpenter Road is a two-lane, east -west minor collector south of the project site. <br />It extends from Airport Way in the west to SR -99 Frontage Road. The posted <br />speed limit is 25 mph. In the immediate project vicinity, there is insufficient <br />shoulder width to permit parking. <br />Togninali Lane is a two-lane, east -west minor collector south of the project site. <br />It connects Pock Lane to SR -99 Frontage Road. The posted speed limit is 25 mph, <br />and parking is generally permitted. <br />Pock Lane Public Review Draft IS/MND 3-62 May 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.