2012 TIDEWATER STOCKTON WORK PLAN FOR SEPARATE PHASE HYDROCARBON REMOVAL <br />AT THE WATERFRONT TOWERS PARKING LOT <br />____________________________________________________________________________ <br />8 <br />4.0 Operation and Maintenance <br />The remediation system will be operated on seven days a week until cleanup goals are <br />achieved or until such a time as the remediation effort is shown to no longer be technically or <br />economically feasible. Throughout the life of the system, its operation will be monitored by an <br />experienced technician and overseen by a California Professional Engineer. A minimum of one <br />site visit per month will be conducted during active operation to maintain system optimization. <br />4.1 Data Collection <br />At least once a month (and weekly during first two months of system operation) various data will <br />be collected to evaluate the system’s efficiency and effectiveness; the date of inspection, <br />compressor blower hourmeter reading, utility meter reading, air flow, pressure, percentage <br />uptime, cycle time, product tank reading, passive skimmer recovery volumes, depth to water of <br />nearby adjacent wells, skimmer placement depth, and details of any maintenance activities <br />performed will be recorded. In addition, an interface probe will be used within the product tank to <br />gauge whether a water leg is present beneath the recovered product. If water is present, the <br />active skimmer will be inspected and the skimmer placement depth will be adjusted. Quarterly, <br />the skimmer in well MW-50 will be removed to gauge depth to water, depth to product, and to <br />perform maintenance and inspection. The quantity of product collected in the product tank will <br />be read by an ultrasonic level reader installed inside the product recovery tank. Routine manual <br />product level observations will be used to verify correct operation of the ultrasonic level reader. <br />These data will be documented on field data sheets. <br />In addition to above mentioned data collection, depth to water, depth to product, product <br />thickness, and volume of product recovered from each of the wells will also be collected and <br />noted on the field notes. The aforementioned data components collectively provide insight as to <br />the operational efficiency of the product recovery remediation system and assists in optimization <br />of the system on a continuous basis. <br />4.2 Operation and Maintenance Schedule <br />The operation and maintenance activities shall comply with the following schedule: <br />Operation and Maintenance Activity Timeline (pending regulatory approval) <br />System start-up In coordination with Construction Activity 9 <br />(see Section 5.0) <br />Continuous operation In coordination with Construction Activity 9 <br />(see Section 5.0) <br />Site visits to obtain operational measurements <br />and perform maintenance activities <br />Weekly first two months and thereafter at least <br />once a month <br />Product removal from the product recovery <br />tank <br />Monthly, or as needed