My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
200
>
2900 - Site Mitigation Program
>
PR0529125
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:55:58 PM
Creation date
5/27/2021 1:52:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529125
PE
2950
FACILITY_ID
FA0019439
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
200
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
200 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan, Subsurface Investigation <br />Potential New Court Site, Stockton, California <br /> <br />6.5 Decontamination Activities <br />All requirements for performing personal and equipment decontamination may be found in Earth Tech <br />Environmental Practice Standard SH&E 604, Decontamination (see Attachment B). <br /> <br />7.0 EMERGENCY ACTION PLAN <br /> <br />7.1 General <br />Although the potential for an emergency to occur is remote, contingency planning has been accomplished <br />should such critical situations arise. Types of emergencies, which could occur include: <br />Medical Emergency (all injuries, including chemical exposure); and <br />Safety Equipment Problem. <br /> <br />7.2 Responsibilities <br />7.2.1 Health and Safety Professional <br />The SH&EP will designate an emergency medical treatment facility in proximity to each work site, as <br />well as a listing of emergency contact information regarding community response resources, Earth Tech <br />contacts, etc. <br />7.2.2 Field Manager/Site Safety Officer <br />The FM/SSO will be the primary contact and coordinator of all emergency activities. The FM/SSO will <br />be responsible for: <br />Evaluating the severity of the emergency; <br />Implementing the appropriate response action; and <br />Summoning community response resources (e.g., ambulance). <br />Project 104290.19.01 22 January 2009
The URL can be used to link to this page
Your browser does not support the video tag.