My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
200
>
2900 - Site Mitigation Program
>
PR0529125
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:55:58 PM
Creation date
5/27/2021 1:52:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529125
PE
2950
FACILITY_ID
FA0019439
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
200
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
200 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan, Subsurface Investigation <br />Potential New Court Site, Stockton, California <br />7.6 Response Actions—Catastrophic Events <br />In the event of a catastrophic incident: <br />Stop all work activities and evacuate all project personnel from the work location. Evacuate <br />personnel in a direction opposite the critically affected area. Have personnel assemble in a pre- <br />designated location outside of the job site. <br />Take a head count of the assembled employees. Administer first aid to any injured individuals. <br />Contact the SSO immediately, if the SSO is not currently present at the work location. <br />The SSO will designate (1) a universal signal for emergency evacuation (e.g., use of a horn) and (2) the <br />evacuation assembly location. The SSO will communicate these designations to all field personnel <br />during the initial site-specific training. The SSO will determine any changes in these designations <br />mandated by changing site conditions, and will communicate these changes to workers during the daily <br />tailgate safety briefing. Table 3 lists emergency contact information. <br />Project 104290.19.01 26 January 2009
The URL can be used to link to this page
Your browser does not support the video tag.