My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
200
>
2900 - Site Mitigation Program
>
PR0529125
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:55:58 PM
Creation date
5/27/2021 1:52:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529125
PE
2950
FACILITY_ID
FA0019439
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
200
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
200 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan, Subsurface Investigation <br />Potential New Court Site, Stockton, California <br />TABLE 1 <br />ACTION LEVELS — DIRECT PUSH TECHNIQUE DRILLING <br />Parameter <br />Zone Location <br />and Monitoring <br />Interval <br />Response Level <br />(Above Background) Response Activity <br />VOCs <br />(total by PIP) <br />Breathing Zone, <br />every 30 minutes <br />during drilling <br />activities <br /><10 units Continue work in required PPE and continue <br />monitoring. <br />10-25 units (sustained <br />for more than 5 <br />minutes) <br />Continue work in required PPE, continue <br />monitoring, and use benzene detector tubes. <br />25-100 units (sustained <br />for more than 5 <br />minutes) <br />Contact the SSO, implement mitigation <br />measures, upgrade PPE to Level C (organic <br />vapor cartridge). <br />> 100 units (sustained <br />for more than 5 <br />minutes) <br />Cease work, exit, and contact the Safety <br />Professional and Project Manager. <br />Benzene <br />(bY <br />Colorimetric <br />Tube) <br />Breathing zone, <br />where indicated <br />by VOC readings <br />No color change Continue work activities. <br />Any color change to 10 <br />PPm <br />Contact the SSO, implement mitigation <br />measures, upgrade PPE to Level C (organic <br />vapor cartridge). <br />> 10 ppm Cease work, exit the area, and contact the SSO <br />and Project Manager. <br />Note: <br />All VOC monitoring will be conducted using PID only. <br />Project 104290.19.01 27 January 2009
The URL can be used to link to this page
Your browser does not support the video tag.