Laserfiche WebLink
0 Job Steps <br />are closed, filled in and/or <br />capped. <br />Clean site/demobilize <br />JSA 05: CUTTING CONCRETE AND PAVEMENT <br /> <br />March 30, 2010 <br />Field staff must review job-specific work plan and coordinate with project manager to verify that a// up-front logistics are completed prior to starting work including, but not limited to, <br />permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and <br />documented at the be innin of each workda . Weather conditions heat, cold, rain, li•htnin. must also be considered. • <br />0 Personal Protective Equipment <br />Wear reflective vest for traffic, steel <br />toed and shank shoes, hardhat, safety <br />glasses with side shields, and leather <br />gloves as necessary. <br />0 Potential Hazard 0 Critical Actions <br />into or driving over the well. <br />Leave site clean of refuse and debris. <br />Notify station personnel of departure. <br />Use proper lifting techniques. <br />Traffic hazards. <br />Lifting hazards. <br />Paper copies are uncontrolled and are valid only at the time of printing. The electronic version may be downloaded from SG1's intranet. <br />Page 2 of 2 <br /> The Source Group, Inc.