Laserfiche WebLink
JSA 15: GROUNDWATER EXTRACTION AND/OR SVE SYSTEM INSTALLATION <br /> <br />March 30, 2010 <br />Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, <br />permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and <br />documented at the be•innin. <br />0 Job Steps <br />of each work da . Weather conditions heat, <br />0 Personal Protective Equipment <br />cold, rain, li•htnin• must also be <br />0 Potential Hazard <br />considered. <br />0 Critical Actions <br />Connect GWE and/or <br />SVE hose and piping and <br />associated valves, <br />sampling ports, and <br />gauges. <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety glasses <br />with side shields, and leather gloves as <br />necessary. <br />Eye or other injury from use of <br />hand tools. <br />Body position / lifting hazard. <br />Use proper lifting techniques. <br />Install electrical control <br />panel, equipment wiring <br />and conduit, and system <br />controls. <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety glasses <br />with side shields, and leather gloves as <br />necessary. <br />Electrical shock/electrocution. <br />Fire from faulty wiring. <br />Back strain when lifting panel <br />into place. <br />Eye or other injury from hand <br />tools. <br />Use lock-out/tag-out procedures to isolate main power supply. <br />Do not perform electrical work in rain. <br />Keep work surfaces dry, especially standing locations. <br />Use proper lifting techniques. <br />Wear standard PPE. <br />Install fencing or other <br />system enclosure, <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety glasses <br />with side shields, and leather gloves as <br />necessary. <br />Back strain. <br />Eye or other injury from power <br />tools. <br />Trip hazards. <br />Use proper lifting techniques and assistance. <br />Keep fencing and other materials neatly stacked until ready for <br />installation. <br />Place required labeling <br />and signage. <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety glasses <br />with side shields, and leather gloves as <br />necessary. <br />Emergencies from fire, or <br />rupture of piping or other <br />containment structures. <br />Indicate emergency contact and phone #. <br />Clearly label emergency shut-off. <br />Properly label any hazardous materials (e.g. H202, petroleum <br />collection containers, etc.,, <br />Supervisor/HSC must <br />confirm all boreholes are <br />closed, filled in and/or <br />capped. <br />Possible injuries and damage to <br />property due to stepping into or <br />driving over the well. <br />Visually inspect each and every borehole. <br />Clean site/demobilize Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety glasses <br />with side shields, and leather gloves as <br />necessary. <br />Traffic hazards. <br />Lifting hazards. <br />Leave site clean of refuse and debris. <br />Notify station personnel of departure. <br />Use proper lifting techniques. <br />Paper copies are uncontrolled and are valid only at the time of printing. The electronic version may be downloaded from SGI's intranet. <br />Page 4 of 4 <br /> The Source Group, Inc.