Laserfiche WebLink
JSA 22: OPERATION AND MAINTENANCE (REMEDIATION SYSTEMS) <br /> <br />March 30, 2010 • <br />Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, <br />permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and <br />documented at the beginning of each workday. Weather conditions (heat, cold, rain, lightning) must also be considered. <br />0 Job Steps <br />Mobilize with proper <br />equipment/supplies, <br />0 Personal Protective Equipment <br />Gather necessary PPE. Reflective vest <br />for traffic, steel toed and shank shoes, <br />hardhat, safety glasses with side shields, <br />ear plugs/muffs, and leather gloves for <br />the non-chemical aspects of work as <br />necessary; Wear an air purifying <br />respirator with combination organic <br />vapor/P-100 cartridges, and other PPE <br />as needed. (Use a North respirator or its <br />equivalent. Best brand nitrile gloves or <br />their equivalent. Foam earplugs with an <br />NRR of 33. Tyvek, poly coated chemical <br />resistant suit or its equivalent). <br />0 Potential Hazard <br />Vehicle accident. <br />Lifting hazards. <br />Delay or improper <br />performance of work due to <br />improper equipment onsite. <br />0 Critical Actions/Precautions <br />Follow safe driving procedures. <br />Employ safe lifting procedures. <br />Make sure sub-contractors are aware of their responsibilities for labor, <br />equipment and supplies. <br />Review HASP and permit conditions. <br />Start project with Daily Health and Safety Briefing. <br />Develop a traffic guidance and control plan with the client and/or local <br />agencies as applicable. Plan may include use of delineators, barrier <br />tape, jersey barriers, snow fence, etc. (Include in site-specific HASP). <br />It is the responsibility of the SHSO to annotate the Site Plan with <br />the Traffic Guidance and Control configuration if a formally <br />developed Traffic Guidance and Control Plan is not available. <br />Set up necessary traffic <br />control. <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety <br />glasses with side shields, and leather <br />gloves as necessary. <br />Struck by vehicle during <br />placement. <br />Vehicle accident as a result <br />of improper traffic guidance <br />and control equipment <br />placement. <br />Use buddy system for placing traffic guidance and control equipment. <br />Reference traffic guidance and control plan section of HASP (may <br />include specific requirements based on permits). (See site-specific <br />HASP). <br />It is the responsibility of the SHSO to annotate the Site Plan with <br />the Traffic Guidance and Control configuration if a formally <br />developed Traffic Guidance and Control Plan is not available. <br />Perform material condition <br />inspection of system, system <br />compound, well vaults, all <br />related equipment, etc. <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety <br />glasses with side shields, and leather <br />gloves as necessary. <br />Struck by vehicle. <br />Trip hazards. <br />Accident when maneuvering <br />around equipment. <br />Chemical exposure. <br />Electrical hazard. <br />Use buddy system while inspecting equipment, system, material, etc. <br />Visually inspect all material associated with the site. <br />Unload and set up <br />equipment. <br />Wear reflective vest for traffic, steel toed <br />and shank shoes, hardhat, safety <br />glasses with side shields, and leather <br />gloves as necessary. <br />Struck by vehicle. <br />Trip hazards. <br />Accident when maneuvering <br />equipment. <br />Place equipment away from pump islands or other high traffic areas. <br />Visually inspect equipment (fire extinguisher on board/available on site, <br />no damaged hoses or electrical lines, pressurized hoses secured with <br />whip-checks or adequate substitute, all vapor and/or water hoses firmly <br />connected, equipment grounded). <br />Paper copies are uncontrolled and are valid only at the time of printing. The electronic version may be downloadedfrom SGI's intranet. <br />Page 1 of 4 <br /> The Source Group, Inc.