Air Sparging Pilot Test Related Activities Report and Remedial Action Work Plan <br />Former Countryside Market, Stockton, California April 30, 2015 <br />6.2.2 Air Sparge Remediation Equipment <br />A 5-horsepower air compressor will be connected via manifold control valves, flow meters, <br />pressure regulators, and conveyance piping to air sparge well heads. All construction-related work <br />will be completed according to acceptable practices and local building codes. <br />General specifications for the proposed system are as follows: <br />Fenced remediation compounds located on site with hazard placards and emergency <br />information in accordance with state and federal regulations; <br />Two existing and eight new AS wells; <br />Pressure rated hose, galvanized and/or PVC AS conveyance piping; <br />5-horsepower, 90 scfm, 150 psi air compressor equipped with an oil/water coalescing filter <br />regulated to provide 5 to 15 scfm air flows to each respective injection well; <br />Sparge control timers/panels; <br />Steel manifold, individual flow meters, pressure gauges, and pressure regulators for <br />individual well control; <br />Weather enclosure for equipment; and <br />Electrical service to operate the remediation equipment. <br />6.3 Soil Vapor Extraction Well Installation <br />The proposed SVE well network will consist of four SVE wells (including existing extraction well <br />VW-1). Wells will be placed parallel between AS wells along east to west transects that will extend <br />diagonally across the Site, generally perpendicular to the flow direction of groundwater. The wells <br />will be located approximately 30 feet apart assuming a conservative 15-foot ROI laterally. The <br />proposed SVE well locations are shown on Figure 5A. <br />Prior to drilling, the locations of all proposed SVE wells will be cleared by USA, then hand cleared <br />to five feet bgs using a hand auger or post hole digger. All down-hole drilling equipment will be <br />steam-cleaned to prevent cross-contamination from previous sampling events. <br />SVE wells will be constructed using 2-inch Schedule-80 PVC blank and screened (0.020-inch slot) <br />casing. The well screen interval for each of the SVE wells will be determined in the field; however, <br />SGI anticipates that one SVE well will be screened from approximately 30 to 60 feet bgs (Figure <br />5C), similar to existing well VW-1 and two SVE wells will be screened from approximately 60 to 80 <br />feet bgs (Figure 5D). The extraction wells will be installed using hollow stem auger equipment. <br />Annular space from two feet above the screened intervals will consist of four feet of bentonite <br />pellets and grout to approximately 1.5 feet bgs. Surface completion for the wells will consist of a <br />flush-mounted, traffic-rated remediation well vault set in concrete. <br />6-3 The Source Group, Inc.