Laserfiche WebLink
Mr. Sidhu -2- May 1, 2002 <br />O A complete cost breakdown and a copy of subcontractor bids (no lump sums). Identify <br />all major tasks of the proposed work along with the following minimum cost breakdown <br />items for each task: <br />List of all staff/worker classifications and hourly rates of each to be utilized. <br />The number of hours to be utilized by each staff/worker <br />Subcontractor costs (actual bid) <br />Equipment costs <br />Itemized listing of estimated ancillary/incidental costs <br />El Complete copies of all bids and other correspondence received in response to the RFB. <br />All cost proposals should include the completed cost proposal breakdown, with task subtotals <br />and a grand total cost for the entire scope of work. <br />If you have any questions, don't hesitate to call me. I can be reached at (916) 341-5796. <br />Sincerely, <br />Mark Owens, Water Resources Control Engineer <br />Technical Review Unit <br />Underground Storage Tank Cleanup Fund <br />Enclosure <br />cc: San Joaquin County Environmental Health Division <br />Calliarnia Environmental Protection Agency <br />%0 Recycled Paper