Laserfiche WebLink
CONTENTS <br />CONTENTS <br />1 INTRODUCTION <br /> <br />1.1 Plan Purpose and Use <br /> <br />1.2 Personnel Responsibilities <br />1.2.1 Corporate Safety Manager <br />1.2.2 Site Responsible Personnel <br />1.2.3 Subcontractor Personnel <br />2 POTENTIAL HAZARDS <br /> <br />2.1 Hazard Summary <br /> <br />2.2 Chemical and Dust Hazards <br />2.3 Monitoring <br />2.3.1 Physical Hazards <br />2.3.2 Chemical Hazards <br />3 HAZARD REDUCTION <br /> <br />3.1 General Safety Requirements <br />3.1.1 Safety Inspections <br />3.1.2 General Procedures during Excavation <br /> <br />3.2 Personal Protective Equipment <br /> <br />3.3 Work Zones - Engineering Controls <br /> <br />3.4 Flammable Atmospheres <br /> <br />3.5 Heat Stress Management <br />3.6 Decontamination <br /> <br />3.7 Substance Abuse Policy <br />ATTACHMENT A PERSONAL ACKNOWLEDGMENT <br />ATTACHMENT B CHEMICAL HAZARD INFORMATION <br />ATTACHMENT C MATERIALS SAFETY DATA SHEETS for SITE CONTAMINANTS <br />ATTACHMENT D MAP & DIRECTIONS TO HOSPITAL/ CLINIC <br />ATTACHMENT E JOB SAFETY ANALYSES <br />BP Arco # HASP Created by: Scott Bittinger Revised by: Evan Lee Fau <br />Template Version: 02.02 Created on: 10/02/2017 Revision date:10/30/2017