Laserfiche WebLink
San Joaquin County Environmental Checklist <br /> Less than <br /> Significant <br /> Potentially with Less than <br /> Significant Mitigation Significant No <br /> Impact Incorporated Impact Impact <br /> XVI. UTILITIES AND SERVICE SYSTEMS. Would <br /> the project: <br /> a. Exceed wastewater treatment requirements of the ❑ ❑ ■ ❑ <br /> applicable Regional Water Quality Control Board? <br /> b. Require or result in the construction of new water ❑ 0 ■ 0 <br /> or wastewater treatment facilities or expansion of <br /> existing facilities,the construction of which could <br /> cause significant environmental effects? <br /> C. Require or result in the construction of new ❑ ❑ ■ ❑ <br /> stormwater drainage facilities or expansion of <br /> existing facilities,the construction of which could <br /> cause significant environmental effects? <br /> d. Have sufficient water supplies available to serve ❑ 0 ❑ ■ <br /> the project from existing entitlements and <br /> resources,or would new or expanded entitlements <br /> be needed? <br /> e. Result in a determination by the wastewater ❑ 0 ❑ ■ <br /> treatment provider that serves or may serve the <br /> project that it has adequate capacity to serve the <br /> project's projected demand in addition to the <br /> provider's existing commitments? <br /> f. Be served by a landfill with sufficient permitted ❑ ❑ ■ ❑ <br /> capacity to accommodate the project's solid waste <br /> disposal needs? <br /> g. Comply with federal,state,and local statutes and ❑ 0 ■ ❑ <br /> regulations related to solid waste? <br /> Setting <br /> The existing utility infrastructure at the landfill facility consists of a water <br /> distribution system fed by onsite wells,a domestic septic system,a stormwater <br /> drainage system,and solid waste collection. <br /> Notice of Preparation for the June 2006 <br /> North County Recycling Center and Sanitary Landfill 2_72 <br /> Permit Revision AS 06307.06 <br />