0 E <br /> cy) 0 <br /> 0 <br /> 0 0 �pFESS10N <br /> 1. ENTIRE INSTALLATION SHALL COMPLY WITH ALL LOCAL AND STATE CODES AND OTHER AUTHORITIES HAVING JURISDICTION. DUCTWORK NOTES: w x W �``0��� M ROs eFy <br /> ACR AIR CURTAIN IEER INTEGRATED ENERGY EFFICIENCY RATIO DESCRIPTION SYMBOL 0 0 - ��� y��c� <br /> 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT RIGGING, HOISTING, CUTTING AND PATCHING AS A RESULT OF HIS 1. MATERIALS FOR METAL DUCTS SHALL COMPLY WITH CMC SECTION 602.5. AHU AIR HANDLING UNIT IW INDIRECT WASTE LO Ln � J M 38871 <br /> WORK. AFF ABOVE FINISHED FLOOR <br /> 2. METAL DUCTS SHALL BE SUPPORTED PER THE MINIMUM REQUIREMENTS OF CMC 2019. THE USE OF SEISMIC 0 0 0') <br /> AFG ABOVE FINISHED GRADE LAT LEAVING AIR TEMPERATURE NECK SIZES IN DUCT SPLIT r r ' s� <br /> 3. CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS AND SHALL ARRANGE ALL REQUIRED INSPECTIONS. RESTRAINTS PER SMACNA IS ALSO ACCEPTABLE. A.P.D. AIR PRESSURE DROP LBS POUNDS 12"NK O Z Lo qp CHANE" <br /> ASSY ASSEMBLY Ln leo <br /> SFO <br /> 3. ALL FACTORY MADE AIR DUCT SHALL BE CLASS 1 OR 0 LISTED DUCT. DUCTWORK W/INTERNAL LINING 0 0 - - O F CAS <br /> 4. PROPER FIRE PROTECTION MEASURES, SATISFACTORY TO THE LOCAL FIRE DEPARTMENT SHALL BE TAKEN WHEN WELDING OR ATC AUTOMATIC TEMPERATURE CONTROLS MAX MAXIMUM Q O 0 0 O <br /> CUTTING WITH TORCHES OR ELECTRIC ARC. MBH THOUSANDS BTU PER HOUR O O 0 0 0 <br /> 4. ALL FACTORY MADE AIR DUCT SHALL BE SUPPORTED PER THE MINIMUM REQUIREMENTS OF CMC 2019 OR AS <br /> BFF BELOW FINISHED FLOOR MC MECHANICAL CONTRACTOR FLEXIBLE CONNECTION <br /> 5. VERIFY ALL EQUIPMENT VOLTAGES WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT. SPECIFIED BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. BFG BELOW FINISHED GRADE MCA MINIMUM CIRCUIT AMPS 011E� - T <br /> 5. APPROVED DUCT LINING MATERIALS SHALL HAVE A MOLD, HUMIDITY AND EROSION RESISTANT SURFACE THAT BG BOTTOM GRILLE MD, M MOTORIZED DAMPER DUCT MOUNTED COIL Lo a- + + 3:M <br /> 6. PROVIDE FLEXIBLE CONNECTIONS ON ALL ROTATING EQUIPMENT, UNLESS INDICATED OTHERWISE. BLDG BUILDING MEZZ MEZZANINE ® >- Z w <br /> MEETS THE REQUIREMENTS OF CC CHAPTER 17, PART II. Ln <br /> BOD BOTTOM OF DUCT MFR MANUFACTURER 0 Z <br /> ELBOW WITH DOUBLE THICKNESS <br /> 7. CONTRACTOR SHALL PROVIDE ALL NECESSARY MISCELLANEOUS STEEL FOR THE SUPPORT OF ALL EQUIPMENT, PIPING, CONDUIT, BR BOTTOM REGISTER MH MOUNTING HEIGHT 0 Z <br /> AND DUCTWORK. 6. DUCTS AND PLENUM MATERIAL SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND SMOKE TURNING VANES Ln <br /> DEVELOPMENT RATING OF NOT MORE THAN 50. BTU BRITISH THERMAL UNIT MIN MINIMUM . c� U ti <br /> BS BIRD SCREEN MOD MOTORIZED OPERATED DAMPER 45° BOOT TAKE-OFF W/VOLUME W y o 0 <br /> 8. CONTRACTOR SHALL PROVIDE ALL REQUIRED ADJUSTING AND BALANCING TO MEET SYSTEM OPERATION REQUIREMENT. 7. INSULATION MATERIALS APPLIED TO THE EXTERIOR OF DUCTS WITHIN THE BUILDING SHALL HAVE A FLAME MS MOP SINK DAMPER ��rQ,�� Z W z Z <br /> CD CEILING DIFFUSER MTD MOUNTED BELLMOUTH TAKE OFF W1 VOLUME U W o - � <br /> 9. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES AND THE EXISTING FIELD CONDITIONS. SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPMENT RATING OF NOT MORE THAN 50 WHEN CFM CUBIC FEET PER MINUTE MUA MAKE UP AIR UNIT _ <br /> TESTED AS A COMPOSITE INSTALLATION. CLG CEILING DAMPER = •. O c9 <br /> 10. ALL AIR MOVING DEVICES, INCLUDING BUT NOT LIMITED TO,AIR HANDLING UNITS AND ROOFTOP AIR CONDITIONING UNITS MUST CL CENTER LINE NC NORMALLY CLOSED AIR FLOW THRU LOUVERED DOOR o x vi <br /> COMPLY WITH AMCA STANDARD 210 AND ASHRAE. COMP COMPRESSOR NIC NOT IN CONTRACT = i5 <br /> CONTR CONTRACTOR NK NECK le <br /> D <br /> 11. ALL MECHANICAL CONTROLS THERMOSTATS, ETC. SHALL BE FURNISHED AND INSTALLED AS PER BARRIER-FREE SUB-CODE OF THE AIR FLOW THRU DOOR UNDERCUT <br /> J <br /> ( ) SEISMIC NOTES: COND CONDENSATE NO NORMALLY OPEN <br /> LOCAL GOVERNING CODE. COND'R CONDENSER NTS NOT TO SCALE m <br /> CR CEILING REGISTER THERMOSTAT O CO-0 <br /> 1. RECTANGULAR DUCTWORK WITH A CROSS-SECTIONAL AREA OF 6 SQ. FT. AND LARGER, AND SUSPENDED MORE OA OUTSIDE AIR � ca <br /> 12. UNLESS OTHER WISE NOTED ON THE DRAWINGS,ALL MECHANICAL EQUIPMENT SHALL BE MOUNTED ON VIBRATION ISOLATORS TO CTE CONNECT TO EXISTING (15- 3:PREVENT THE TRANSMISSION OF SOUND TO THE BUILDING STRUCTURE.VIBRATION ISOLATORS SHALL BE IN ACCORDANCE WITH THAN 12' FROM POINT OF CONNECTION TO STRUCTURE TO TOP OF DUCT SHALL BE BRACED IN TWO OAI OUTSIDE AIR INTAKE <br /> CU CONDENSING UNIT DRY BULB SENSOR O � �N � <br /> THE SPECIFICATIONS AND ON ACTUAL WEIGHT DISTRIBUTION OF THE EQUIPMENT FURNISHED. DEFLECTIONS SHALL BE AS NOTED DIRECTIONS (90° OPPOSING) USING ROD OR STRAP OF SAME LOAD CHARACTERISTICS AS PRIMARY CW COLD WATER OC ON CENTER _ Q <br /> ON THE EQUIPMENT SHOP DRAWING SUBMITTALS. SUSPENSION ROD OR STRAP. OED OPEN ENDED DUCT = = o <br /> DB DRY BULB OPNG OPENING RELATIVE HUMIDITY SENSOR <br /> 13. ALL REMOVED EQUIPMENT, MATERIAL AND DEBRIS SHALL BE LEGALLY DISPOSED OF BY THIS CONTRACTOR. 2. DUCTWORK 28" IN DIAMETER AND LARGER, AND SUSPENDED MORE THAN 12" FROM POINT OF CONNECTION TO DEF DISHWASHER EXHAUST FAN OP WT OPERATING WEIGHT = v CD <br /> C" <br /> STRUCTURE TO TOP OF DUCT SHALL BE BRACED IN TWO CHARACTERISTICS AS PRIMARY SUSPENSION ROD OF DN DOWN DUCT SMOKE DETECTOR sD o <br /> STRAP. <br /> 14. FURNISH LOCAL DISCONNECT SWITCHES FOR ALL ELECTRICALLY DRIVEN HVAC EQUIPMENT. DISCONNECT SWITCH SHALL BE IN DOM DOMESTIC WATER PC PLUMBING CONTRACTOR O <br /> ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS.WEATHERPROOF AS REQUIRED. DWG(S) DRAWINGPSI POUNDS PER SQUARE INCHS) PVC POLYVINYL CHLORIDE SMOKE DETECTOR 03. DUCTWORK SHALL HAVE TRANSVERSE BRACING AT MAXIMUM 30'-0" ON CENTER AND WITHIN 48" OF CHANGE IN DW DISHWASHER <br /> 15. CONTRACTOR SHALL ENSURE THAT ALL MECHANICAL DEVICES WILL BE INSTALLED IN A LOCATION WHICH AFFORDS ACCESSIBILITY DIRECTION AND LONGITUDINAL BRACING AT MAXIMUM 60'-0" ON CENTER. DWH DOMESTIC WATER HEATER <br /> FOR MAINTENANCE AND REPAIR. COORDINATE INSTALLATION AMONG ALL TRADES TO AVOID INTERFERENCE,AND LOCATE R EXISTING EQUIPMENT TO BE REMOVED DEWPOINT SENSOR DP <br /> EQUIPMENT TO PROVIDE CLEARANCE OR EXCEED THOSE RECOMMENDED BY THE MANUFACTURER. PRIOR TO PROJECT 4.CEILING DIFFUSERS AND GRILLES SHALL BE SECURED TO A STRUCTURAL ELEMENT USING A 12 GAUGE CEILING EAT ENTERING AIR TEMPERATURE RA RETURN AIR <br /> COMPLETION, REPRESENTATIVES OF OWNER AND ENGINEER WILL REVIEW EACH INSTALLATION AND WILL DIRECT CHANGES RAV RELIEF AIR VENT <br /> SUSPENSION WIRE. EA EXHAUST AIR RC REFRIGERATION CONTRACTOR MOTORIZED DAMPER MD <br /> WHENEVER ACCESS OR SERVICE ABILITY IS, IN THEIR OPINION, UNACCEPTABLE. EB ELECTRIC BASEBOARD RG RETURN GRILLE <br /> EC ELECTRICAL CONTRACTOR RH RELATIVE HUMIDITY VOLUME DAMPER VD <br /> 16. INSTALL ALL DIELECTRIC UNIONS IN A MANNER WHICH MAKE THEM READILY ACCESSIBLE FOR FUTURE REPAIR OR REPLACEMENT. EDB ENTERING DRY BULB <br /> EER ENERGY EFFICIENCY RATIO RL EXISTING EQUIPMENT TO BE RELOCATED <br /> 17. CONTROL WIRING IN OCCUPIED SPACE SHALL BE INSTALLED IN CONCEALED SPACE,WALL OR CHASE. EF EXHAUST FAN <br /> RLA RUNNING LOAD AMPS CARBON DIOXIDE SENSOR cot <br /> POLLUTION CONTROL AND OUTDOOR AIR QUALITY EF EXHAUST GRILLE RPM REVOLUTIONS PER MINUTE <br /> 18. ALL INSULATION PROVIDED FOR THE PROJECT MUST MEET A MAXIMUM FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED OF 50 EH ELECTRIC HEATER RR RETURN REGISTER CARBON MONOXIDE SENSOR co <br /> OR LESS,AS TESTED IN ACCORDANCE WITH ASTM, NFPA& U.L. GUIDELINES. 1. DURING CONSTRUCTION, ENDS OF DUCT OPENINGS ARE TO BE SEALED, AND MECHANICAL EQUIPMENT IS TO EMS ENERGY MANAGEMENT SYSTEM S SANITARY <br /> BE COVERED. CGC 5.504.3. EQUIP EQUIPMENT <br /> 19. ALL EQUIPMENT FOR THIS PROJECT SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY. ESP EXTERNAL STATIC PRESSURE SA SUPPLY AIR NITROGEN DIOXIDE SENSOR Noe <br /> 2. PROVIDE AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT PROVIDES AT LEAST A MINIMUM ETR EXISTING TO REMAIN SCV SELF CONTAINED CONTROL VALVE EXISTING TO BE REMOVED <br /> 20. REFRIGERATION INSTALLER SHALL BE RESPONSIBLE TO PROVIDE SPACE SENSOR&SUPPLY DUCT SENSOR. REFER TO ENERGY EFFICIENCY REPORTING VALUE (MERV) OF 8. MERV 8 FILTERS SHALL BE INSTALLED PRIOR TO OCCUPANCY. EUH ELECTRIC UNIT HEATER SDD SMOKE DAMPER W/ACCESS DOOR o <br /> MANAGEMENT DWGS. FOR MORE DETAILS. ALL SENSORS SHALL BE MANUFACTURED BY CPC). SD DUCT SMOKE DETECTOR <br /> ( ) CGC SECTION 5.504.5.3. EWB ENTERING WET BULB CONNECTION TO EXISTING � N <br /> SD-X STORM DRAIN LO <br /> 21. HVAC UNIT MANUFACTURER TO PROVIDE 120V SMOKE DETECTORS WITH AUXILIARY CONTACTS AS SHOWN. UPON ACTIVATION,THE EWC ELECTRIC WATER COOLER SFD SMOKE& FIRE DAMPER W/ACCESS DOOR m <br /> 3. WHERE OUTDOOR AREAS ARE PROVIDED FOR SMOKING, SUCH AREAS ARE PROHIBITED WITHIN 25' OF EWH ELECTRIC WATER HEATER SF-X SUPPLY FAN SUPPLY DUCT RISER ® UP ® DN Q <br /> SMOKE DETECTORS SHALL SHUT DOWN THE AIR DISTRIBUTION SYSTEM TO WHICH IT IS CONNECTED AND ACTIVATE A VISIBLE AND <br /> AUDIBLE SUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED LOCATION VIA THE SPRINKLER/FIRE ALARM PANEL. SMOKE BUILDING ENTRIES, WINDOWS AND OUTDOOR AIR INTAKES. SIGNAGE SHALL BE POSTED TO INFORM EX EXISTING SQ.FT. SQUARE FEET U <br /> DETECTORS SHALL ALSO BE FURNISHED WITH WALL MOUNTED REMOTE TEST. REMOTE SD TEST SUPERVISORY SIGNAL SHALL BE OCCUPANTS OF THE PROHIBITIONS. CGC SECTION 5.504.7. °F DEGREE FAHRENHEIT SP STAND PIPE RETURN/EXHAUST RISER UP DN 0 z <br /> LED TYPE WITH AUDIBLE BEEPING ALERT. F&T FLOAT&THERMOSTATIC TRAP SPR SPRINKLER I-__ <br /> 4. INSTALLATIONS OF HVAC SYSTEMS WILL NOT CONTAIN CFC'S OR HALONS, PER CGC 5.508.1. REFER TO FC FLEXIBLE CONNECTION SR SUPPLY REGISTER ROUND DUCT (2) UP 0 DN <br /> 22. REFER TO EQUIPMENT SCHEDULES FOR DETAILED REQUIREMENTS. OUTDOOR AIR SCHEDULE FOR VENTILATION INFORMATION. FCO FLOOR CLEAN OUT SS STAINLESS STEEL 0 <br /> FD FIRE DAMPER W/ACCESS DOOR ST STORM 0 z_ <br /> FLEXIBLE DUCT, FLEXIBLE CONNECTOR FC I-__ <br /> 23. THE FINISH AND COLOR OF THE AIR DEVICES,AND ALL OTHER EXPOSED HVAC EQUIPMENT SHALL BE COORDINATED WITH THE PRIOR TO FINAL INSPECTION THE LICENSED CONTRACTOR OR ENGINEER IN RESPONSIBLE CHARGE OF THE FD-X FLOOR DRAIN U) U z <br /> ARCHITECT AND WITH AN OWNER'S REPRESENTATIVE. OVERALL CONSTRUCTION MUST PROVIDE TO THE BUILDING DEPARTMENT OFFICIAL WRITTEN VERIFICATION FFD FUNNEL FLOOR DRAIN TD TRENCH DRAIN z O <br /> TEF TOILET EXHAUST FAN <br /> THAT ALL APPLICABLE PROVISIONS FROM THE GREEN BUILDING STANDARDS CODE HAVE BEEN IMPLEMENTED FLA FULL LOAD AMPS cn ZD <br /> 24. PROVIDE PHASE LOSS PROTECTION FOR ALL POLY-PHASE MOTOR DEVICES. AS PART OF THE CONSTRUCTION. CGC 102.3. FP FROST PROOF TG TRANSFER GRILLE U 0 <br /> FPM FEET PER MINUTE TP TRAP PRIMER w w <br /> 25. THE FINAL LOCATION OF AIR DEVICES MUST BE COORDINATED WITH THE REFLECTED CEILING PLAN WHERE PRESENT AND ALL FPWH FROST PROOF WALL HYDRANT TT THERMOSTATIC TRAP LU <br /> PRIOR TO MECHANICAL PERMIT FINAL, A SMOKE DETECTOR SHUT-OFF TEST WILL BE REQUIRED. <br /> OTHER MECHANICAL, ELECTRICAL, FIRE PROTECTION,ARCHITECTURAL,AND STRUCTURAL SYSTEMS. FS-X FLOOR SINK TW TEMPERED WATER U 0 <br /> TWV THREE WAY VALVE Q <br /> 26. DUCT SIZES MUST BE VERIFIED FOR CLEARANCES AT THE JOB SITE PRIOR TO FABRICATION. DIMENSIONS MAY BE CHANGED TO G GAS TYP TYPICAL MECHANICAL SYMBOLS LEGEND Q <br /> ACCOMMODATE CONSTRUCTION AS LONG AS EFFECTIVE CROSS-SECTIONAL AREA IS MAINTAINED. DUCT TRANSITIONS SHALL BE GC GENERAL CONTRACTOR 0 J <br /> CONSTRUCTED WITH A SLOPE OF 1"TO 4".ALL DEVIATIONS FROM ORIGINAL CONTRACT DRAWINGS SHALL BE REVIEWED BY GEF GENERAL EXHAUST FAN U/C UNDER COUNTER NTS Q z <br /> ENGINEER DURING THE SHOP DRAWING PROCESS. GI GREASE INTERCEPTOR UH UNIT HEATER O ZD <br /> GPF GALLONS PER FIXTURE UV UNIT VENTILATOR 0 <br /> LU <br /> 27. PROVIDE ELBOWS OR TEES WITH TURNING VANES FOR ALL CHANGES OF DUCT DIRECTION. PROVIDE SPLITTER DAMPERS WITH GPM GALLONS PER MINUTE � <br /> LOCKING QUADRANTS IN ALL TEES. V VENT Q m <br /> H HOOD VD VOLUME DAMPER w O <br /> 28. FLEXIBLE DUCT DIAMETER SHALL MATCH THE NECK SIZE OF THE DIFFUSER TO WHICH IT CONNECTS, UNLESS NOTED OTHERWISE. HB HOSE BIBB VIC VIBRATION ISOLATION CONNECTION � <br /> TOTAL LENGTH OF FLEXIBLE DUCT RUN SHALL NOT EXCEED 5'-0". EXTEND SHEETMETAL DUCT WITHIN 5'-0"OF THE AIR DEVICE FOR HC HVAC CONTRACTOR VTR VENT THRU ROOF O <br /> COMPLIANCE. FLEXIBLE DUCTWORK IS NOT PERMITTED FOR USE IN ANY PARTS OF THE RETURN OR EXHAUST AIR SYSTEMS. HCO HORIZONTAL CLEANOUT 0 J <br /> FLEXIBLE DUCTWORK SHALL NOT PASS THROUGH FIRE RATED CONSTRUCTION. HP HORSEPOWER W WASTE U) <br /> HR HOSE REEL WB WET BULB z w <br /> 29. PROVIDE FIRE DAMPERS WITH RATED ACCESS DOORS AT ALL DUCT PENETRATIONS THROUGH FIRE RATED WALLS, SMOKE AND FIRE HS HAND SINK W.C. WATER COLUMN O elf <br /> STOPPING, SHAFTS, FLOORS, RATED CEILINGS AND PARTITIONS AS REQUIRED TO MAINTAIN ARCHITECTURAL FIRE RATINGS. REFER HW HOT WATER WCO WALL CLEAN OUT Q X <br /> TO THE ARCHITECTURAL PLANS AND SPECIFICATIONS FOR LOCATIONS AND FIRE RATING REQUIREMENTS. HWR HOT WATER RECIRCULATION WF WATER FILTER � w <br /> HV HEATING AND VENTILATING WMS WIRE MESH SCREEN O cn <br /> 30. ALL ACCESS DOORS REQUIRED IN GENERAL CONSTRUCTION ARE TO BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. HVAC HEATING,VENTILATING&AIR WP WEATHER PROOF z N <br /> IT IS THE RESPONSIBILITY OF THE HVAC CONTRACTOR TO IDENTIFY SIZE,TYPE AND LOCATION OF SUCH DOORS FOR PROPER CONDITIONING <br /> z z <br /> ACCESS TO ALL CONCEALED HVAC EQUIPMENT,VALVES AND OTHER RELATED EQUIPMENT.THE HVAC CONTRACTOR SHALL w <br /> IDENTIFY THESE REQUIREMENTS ON A COORDINATED SHOP DRAWING PRIOR TO SYSTEM FABRICATION AND INSTALLATION. <br /> NOTE: NOT ALL ABBREVIATIONS LISTED ABOVE ARE NECESSARILY USED ON THIS PROJECT. z U <br /> 31. ALL WALL AND ROOF OPENINGS 12"X 12"OR LARGER ARE TO BE EQUIPPED WITH BURGLAR BARS USING 5/8"DIAMETER RODS OU DRAWING 0 <br /> RUNNING 6"ON CENTER IN BOTH DIRECTIONS,AND WELDED AT ALL INTERSECTING POINTS. SECURE THE PERIMETER FRAME DRAWING TITLE cn w <br /> ASSEMBLY TO THE WALL OR ROOF FRAMED ASSEMBLY. MECHANICAL ABBREVIATIONS NUMBER w z w <br /> Q) <br /> 32. ALL CEILING MOUNTED EQUIPMENT MUST BE SUPPORTED DIRECTLY FROM BUILDING STRUCTURE WITH COMBINATION SPRING ANDNTS M-1.0 MECHANICAL OVERVIEW ZD <br /> NEOPRENE-IN-SHEAR HANGERS AND ROD. PROVIDE SUPPLEMENTARY STEEL AS REQUIRED TO ADEQUATELY SUPPORT THE LOAD. lmk-zm 00 <br /> M-2.0 MECHANICAL FLOOR PLAN o w <br /> 33. HVAC CONTRACTOR SHALL FIELD VERIFY, DOCUMENT AND REPORT ALL EXISTING ROOF TOP UNITS,ANY DAMAGED OR NOT w W <br /> PROPERLY WORKING EXISTING RTU PARTS, CONTROLS AND THERMOSTATS. REPLACE THOSE PARTS WITH NEW. cnZD <br /> M-3.0 MECHANICAL SCHEDULESmom = p <br /> 34. EXHAUST FLUES SHALL TERMINATE WITH A RAIN CAP AND SHALL UTILIZE A FLASHING CONE PENETRATION. OFFSET THE FLUE LU N <br /> BELOW ROOF, SO THE FLASHING CAN BE INSTALLED ON A FLAT PORTION OF ROOF AND SUFFICIENTLY AWAY FROM THE EDGE. M-4.0 MECHANICAL DETAILS z O <br /> CODE COMPLIANCE Q = <br /> 35. GUARANTEE ALL HVAC WORK AND EQUIPMENT FOR A PERIOD OF ONE YEAR FROM DATE OF STORE OPENING. DURING THE ONE i <br /> ZD <br /> YEAR PERIOD, SERVICE SHALL BE PROVIDED TWENTY-FOUR HOURS PER DAY, SEVEN DAYS PER WEEK AND SHALL INCLUDE ALL M-5.0 MECHANICAL TITLE 24- 1 LU <br /> 2019 CALIFORNIA BUILDING CODE WITH 2020 LOCAL AMENDMENT LU Q <br /> SERVICE CALLS, PARTS, LABOR AND MAINTENANCE AT NO ADDITIONAL COST TO THE OWNER OR TENANT.ALL FILTERS SHALL BE Uj 2019 CALIFORNIA ELECTRICAL CODE WITH 2020 LOCAL AMENDMENT � <br /> CHANGED ONCE PER MONTH. IN ADDITION,ALL COMPRESSORS SHALL CARRY A FIVE YEAR WARRANTY FROM THE MANUFACTURER. 2019 CALIFORNIA MECHANICAL CODE WITH 2020 LOCAL AMENDMENT M-6.0 MECHANICAL TITLE 24-2 <br /> 2019 CALIFORNIA ENERGY CODE WITH 2020 LOCAL AMENDMENT Q <br /> 36. HVAC CONTRACTOR SHALL PROVIDE A MECHANIC TO BE PRESENT AT THE STORE FOR GRAND OPENING. 2019 CALIFORNIA PLUMBING CODE WITH 2020 LOCAL AMENDMENT = <br /> 2019 CALIFORNIA FIRE CODE WITH 2020 LOCAL AMENDMENT T_ <br /> 37. THESE DRAWINGS ARE INTENDED TO BE USED AS A GRAPHICAL REPRESENTATION OF THE ACTUAL SYSTEMS AND COMPONENTS TO 2019 CALIFORNIA GREEN BUILDING STANDARDS WITH 2020 LOCAL AMENDMENT CD <br /> BE INSTALLED. DO NOT SCALE FROM THESE DRAWINGS. <br /> 38. THE CONTRACTOR SHALL COOPERATE WITH OTHER TRADES. FURNISH WORKMANSHIP THE HIGHEST GRADE, RESPONSIBLE CODES AND REGULATIONS INFORMATION D RAW I N G INDEX <br /> FOR ALL LAYOUT, POSITIONING AND FIELD MEASUREMENTS FOR A NEAT,ACCURATE ANDD COMPLETE HVAC INSTALLATION. <br /> ATION. <br /> 39. MECHANICAL EQUIPMENT,APPLIANCES AND SUPPORTS THAT ARE EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TO NTS NTS <br /> RESIST THE WIND PRESSURES ON THE EQUIPMENT AND THE SUPPORTS AS DETERMINED IN ACCORDANCE WITH THE CALIFORNIA <br /> BUILDING CODE, BUILDING. ROOF MOUNTED MECHANICAL UNITS AND SUPPORTS SHALL BE SECURED TO THE STRUCTURE.THE USE <br /> OF WOOD"SLEEPERS"SHALL NOT BE PERMITTED. <br /> 40. LOCATE ALL PIPES- FIRE SPRINKLER, GAS-HUG JOIST-AS HIGH AS POSSIBLE. <br /> 41. DURING CONSTRUCTION CONTRACTOR SHALL COVER ALL OPENINGS AND MECHANICAL EQUIPMENT. <br /> 42. TEMPORARY VENTILATION REQUIREMENTS WILL BE PROVIDED BY THE M.C. DURING CONSTRUCTION.TEMP VENTILATION WOULD BE REVISIONS <br /> LARGE PORTABLE FANS PULLING OUTSIDE AIR ACROSS THE SPACE WHEN THE BUILDING IS ENCLOSED DURING CONSTRUCTION. <br /> 1 OCCUPANCY TYPE MERCANTILE <br /> SUMMER OUTDOOR DESIGN DESIGN CITY: STOCKTON, CA <br /> CONDITIONS <br /> 2 DRY BULB: 97 °F-(99.6% COOLING DRY BULB,ASHRAE) <br /> MECHANICALGENERAL NOTES WET BULB: 68.0°F-(99.6% MEAN WET BULB,ASHRAE) <br /> NTS <br /> 3 SUMMER INDOOR DRY BULB: 75°F m <br /> DESIGN CONDITIONS RELATIVE HUMIDITY: 50% MAX. ly- <br /> 0 <br /> 0 <br /> WINTER OUTDOOR DESIGN w w <br /> DESIGN CITY: STOCKTON, CA U) <br /> CONDITIONS <n <br /> 4 <br /> DRY BULB: 32°F-(99.6% HEATING DRY BULB,ASHRAE) w o <br /> Q <br /> o <br /> 5 <br /> WINTER INDOOR DRY BULB: 70°F <br /> DESIGN CONDITIONS RELATIVE HUMIDITY: 50% MAX. N M v Ln ti w rn o <br /> MECHANICAL <br /> OVERVIEW <br /> PROJECT DESIGN INFORMATION <br /> NTS <br /> FOR PERMIT DATE: 11/06/2020 <br /> JOB NO. 20263 <br /> mmi no <br /> SHEET NO. <br />