Laserfiche WebLink
GREASE INTERCEPTOR CALCULATIONS <br />FIXTURE TYPE DFU'S QUANTITY TOTAL <br />FLOOR DRAIN 2 6 12 <br />FLOOR SINKS 4 7 28 <br />MOP SINKS 3 1 3 <br />'TOTAL DRAINAGE FIXTURE UNITS 43 <br />GREASE INTERCEPTOR MINIMUM REQUIRED VOLUME (GYALLONS) 1,250 <br />GREASE INTERCEPTOR SHALL. BE 1,500 GALLONS PER PILOT / FLYING XS DIRECTIVE <br />1 . BASED ON TABLE 10-3 OFTHE 2013 CALIFORNIA PLUMBING CODE <br />MATERIAL SCHEDULE <br />SYSTEM MATERIAL <br />SAN) TARY WASTE & VENT (ABOVE GRADE) HUBLESS CASTIRON (PVC DWV OPTIONAI <br />SANITARY WASTE & VENT (BELOW GRADE) SERVICE WEIGHTCAST IRON (PVC DWV OPTIONAL.) <br />POTABLE WATER (ABOVE GRADE) TYPE L I-IARD-DRAWN COPPER <br />POTABLE WATER <, 2-1/2" (BELOW GRADE) TYPE L HARD�DRAWN COPPER (BRAZEDJOINTS) <br />POTABLE WATER ;� 3" (BELOW GRADE) DUCTILE IRON <br />NATURAL GAS (ABOVE GRADE/ON ROOF) SCHEDULE 40 BLACK STEEL,, PAIN I -ED OSHA YELLOW <br />NATURAL GAS (BELOW GRADE) APPROVED 'PE" PIPE FOR GAS <br />COMPRESSED AIR (ABOVE & BELOW GRADE) SCHEDULE 40 BLACK STEEL, AS FM A120 <br />CONDENSATE TYPE L HARD -DRAWN COPPER (P\NV DWV OPTIONAL) <br />CARBONATED LIQUID WASTE PIPING CPVC, DO NOT USE COPPER OR CAST IRON. <br />WATER HEATER SCHEDULE <br />MARK WH -1 WH ­2 <br />. ........ . <br />NATURAL. GAS INPUT (13TWHR) 399,000 399,000 <br />ELECTRICAL 120V 110 / 60Hz 120V / 10 / 60Hz <br />RECOVERY @ 100'F RISE 464 GPI1 464 GPH <br />MANUFACTURER HTP HTP <br />MODEL. PHP -399-119 PHIP-399-119 <br />S FO RAG E CAPAC I TY 119 GAL� 119 GAL� <br />WEIGHT (DRY) 575 LBS. 575 LBS, <br />1. PROVIDE #7450P-212 CONDENSATE NEUTRALIZER ON EACH HEATER, <br />2. PROVIDE 4" TERMINATION VENT KITFOR INLET#V3000 AND OUTLET#V3000, <br />3, WATER HEATERS FURNISHED BY OWNER. NO SUBSTITUTIONS ALLOWED. <br />INSTALLATION AND FINAL CONNECTION BY PC. <br />TESTING PROCEDURES. <br />TEST INS FALLED WATER PIPING AT 100 PSI FOR A PERIOD OF 8 HOURS, <br />I OBSERVING FOR ANY VISIBLE LEAKS,TEST PIPING AGAIN WITH <br />FIXTURES INSTALLED, <br />CHLORINATE ALL. WATER PIPING , FOR A PERIOD OF 8 FIRS, BY CHARGING <br />WITH A HYPOCHLORINATE SOLUTIONTO ACHIEVE A 5 PPM STRENGTH <br />AT THE FIXTURE FURTHES F FROM THE POINTOF APPLICATION, UPON <br />2 COMPLETION OF THE CHLORINATION, FLUSH AL.L. PIPING UNTIL NO <br />CHLORINE CAN BE DETECTED BY TASTE, CLEAN ALL STRAINERS AND <br />SET WATER FLOWS FROM FIXTURES IN ACCORDANCE WITH <br />MANUFACTURER AND LOCAL REQUIREMENTS. <br />3 TEST INSTALLED GAS PIPING AT- 60 PSI FOR A PERIOD OF 2 FIRS, USING <br />SOAP AND WATER OBSERVING FOR ANY VISIBLE LEAKS ATALLJOINTS. <br />TES FINSTALLED WASTE AND VENT PIPING FOR A PERIOD OF 8 HRS, BY <br />4 CAPPING OR PLUGGING ALLJOINTS -TO A LEVEL OF THE HIGHEST <br />FIXTURE OR FITTING. FILLTHE SYSTEM WITH WATER AND OBSERVE <br />FOR ANY LEAKS. <br />SUPPLIER'S MATERIAL PACKAGE <br />PILOT/ FLYING J PARTICIPATES IN A NATIONAL ACCOUNTS PROGRAM WITH <br />HAINES, JONES, AND CADBURY OF BENTONVILLE, ARIZONA. CONTACT- -THE <br />ACCOUNT REPRESENTATIVE FOR PRICING AND EQUIPMENTINCLUDED INTHE <br />PACKAGE, <br />PHONE NUMBER- (800) 459-7099 <br />EMAIL: PILOT@HJCINC,COM <br />NO OTHER MANUFACTURERS OR SUPPLIERS WILL BE ACCEPTED. <br />EQUIPMENTPACKAGE� <br />ALL PLUMBING FIXTURES, CHINA, FAUCETS, SUPPLIES, AND PUMPS ON THE <br />PLANS AND SPEC I FICAT IONS. <br />IN FLOOR PACKAGE: <br />';�:Tl F�[,.o�D—RT)-F�Ai—N'3—,'Fl.,()OR SINKS, AND CLEANOUT AS SPECIFIED ON THE PLANS <br />AND SPECIFICATIONS. <br />EN FIRE SHEET HAS BEEN UPDATED -TO MATCH <br />CURRENT PILOT/ FLYING J -TRAVEL CENTER DESIGN <br />CRITERIA AND ARCHITECTURAL BASE <br />PLUMBING FIXTURE SCHEDULE <br />GENERAL PLUMBING NO FES <br />1 DRAWINGS AIRE DIAGRAMMATIC ONLY AND REPRIESENTTHE GENERAL SCOPE OFTHE <br />WORK, PRIOR -TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVETHE EXISTING <br />CONDITIONS OFTHE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS <br />FOR ADDITIONAL REQUIREMENTS THAT MAYNOT BE SPECIFICALLY CALLED OUT INTHIS <br />PORTION OF TH E CONS TRUCTION DOC UM ENTS. NOTIFY ARCHITECT OF ANY CONFLICTS OR <br />DISCREPANCIES PRIOR TO, SUBMISSION OF BID. <br />2, INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE <br />REQUIREMENTS OF AUTHORITIES HAVING JURISDIC FION AND ALSO MEE1' ALL <br />REQUIREMENTSOFTHE LANDLORD, OBTAIN A COPY OFTHE LANDLORD'S REQUIREMENTS <br />AND REVIEW PRIOR"TO SUBMITTING BID, <br />3� PROVIDE A CONSTRUCTION RECORD SETOF "AS -BUILT" DOCUMENTS TO THE ARCHITECT' <br />REFLEC TING ANY VARIANCES OF INSTALLED PIPING LOCA-1-10NS OR EQUIPMEN ['CONTRARY <br />TO THE CONSTRUC TION DOCUMENTS, REFERTO SPECIFICATIONS. <br />4, PROVIDE TO THE ARCHITECT A COPY OF INSPECTION REPORT'S AND APPROVAL <br />CERTIFICATES FROM LOCAL AND STATE INSPECTIONS, REFER 1-0 SPECIFICATIONS, <br />5, PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS, <br />6. COMPLY WITH HEALTH DEPARTMENT REGULATIONS, PROVIDE CLEARANCE FOR CLEANING <br />BEHIND AND UNDER EXPOSED PIPING AS REQUIRED BY HEALTH DEPARTMENT, CONFORM <br />TO HEALTH DEPARTMENT REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS, <br />7, PROVIDE ITEMS AND WORK AS REQUIRE[) FOR A COMPLETE AND WORKING PLUMBING <br />INS FALLATION FOR EACH PIECE OF KITCHEN EQUIPMENT, PROVIDE ROUGH -INS AND <br />CONNECT' TO THE KITCHEN EQUIPMENT WITH TRAPS, SUPPLIES, SHUTOFF VALVES, PIPES -TO <br />THE WALL, ESCUTCI­­IEONS, ETC AS SHOWN, SPECIFIED AND REQUIRED, <br />8 VERIFY LOCATION AND DEPTH OF UTILITIES AT POINTS OF CONNECTION BEFORE START OF <br />PIPING INSTALLATION, <br />9, DO NOT SCALE FLOOR F'LANS FOR EXACTHORIZONTAL LOCA"rION OF PIPE ROUTING. <br />10� REFER TO ARCHITECTURAL PLANS FOR EXACTLOCATION AND MOUNTING HEIGH fS OF <br />PLUMBING FIXTURES, <br />11, COORDINATE ALL WASTE, VENF, WATER, GAS, CONDENSATE,AND STORM PIPING -TO AVOID <br />CONFLICT WITH OTHER­FRADES AND CONTRACTORS. DO NOT INSTAL,[., PIPING OVER <br />ELECTRICAL PANELS. COORDINATE PIPING INSTALLATION WITH STRUCTURAL GRADE BEAMS, <br />FOOTINGS, COLUMN PIERS, ETC, SLEEVE F1 IPI NGTH ROL)GH GRADE BEAMS, FOOTING, ETC, <br />WHERE REQUIRED AND AS NOTED ON PLANS. COORDINATE SLEEVE INSTALLATIONS WITH <br />THE ARCHITECT, STRUCTURAL ENGINEER, STRUCTURAL CONTRACTOR AND GENERAL <br />CONTRACTOR BEFORE CONCREFE IS INSTALLED. <br />12. COORDINATE ALL ROOF PENETRATIONS WITH OTHER TRADES, MAINTAIN 10'MINIMUM <br />CLEARANCE FROM ALL AIR INTAKES, MAINTAIN 2'-0" OF CLEARANCE FROM ALL OTHER <br />EQUIPMENT. <br />13. COORDINAT-E FLOOR DRAIN LOCATIONS WITH THE ARCHITECTURAL PLANS, INSTALL RIM OF <br />FLOOR DRAINS AND FLOOR SINKS BELOW FINISHED FLOOR LEVEL, <br />14� INS FALL CONCEALED PIPING -FIGHT TO THE STRUCTURE AND AS HIGH AS POSSIBLE, INSTALL <br />EXPOSED PIPINGTIGH-r To THE STRUCTURE, WALL OR CEILING AND AS HIGH AS POSSIBLE, <br />COORDINATE WITH OTHER TRADES DD AVOID CONFLICTS, <br />15� PAINT ALL EXPOSED GAS AND WATER PIPING USING RUST INHIBITOR PAINT, PAINTAND <br />COLOR SHALL BE COORDINATED WITH THE ARCHITECT AND / OR OWNER, <br />16, INSULATE ALL DOMESTIC WATER AND STORM DRAIN PIPING PER SECTION 15250 OF <br />SPEC I FICATIONS. <br />1T SEAL ALL PEN ETRATIONSTH ROUGH FLOORS, WALLS, CEILINGS AND ROOFS. REPAIR <br />SURFACES TO MATCH ADJACEN FAREAS. <br />1& INSTALL NO PLUMBING ROOF PENETRATIONS JHROUGH GREASE FILTER PANS ON THE <br />ROOF, REFER TO MECHANICAL DRAWINGS PRIOR TO STAR­FOF INS TALLATION. <br />19 PROVIDE WALL- BACKING OR SPECIFIED CARRIERS FORTHE PROPER SUPPORT OF <br />INSTALLED WAL.L. HUNG FIXTURES AND EQUIPMENT, <br />20, CLEAN INSTALLED PLUMBING FIXTURES AND EQUIPMENT, <br />21, SEAL AROUND INSTALLED FIXTURES AND KITCHEN EQUIPMENTWFT'H CAULK, <br />22, WHERE "FLEX" TUBING IS CALLED FOR, PROVIDE A FOUR FOOT COILED LENGTH OF TYPE <br />"K" SOFT COPPER -TUBING FROM WATER SHUT -OF -F VALVE TOTHE EQUIPMENT CONNECTION <br />OF SAME SIZE AS CONNEc rFON TO KITCI,-IEN EQUIPMEN f WITH 114" BEING MINIMUM SIZE. <br />PROVIDE CONNEc rORS AND ADAPTERS AS REQIJIRED, <br />21 PROVIDE INDIRECT WASTE LINES OF SAME SIZE AS CONNECTION TO EQUIPMEN IF WITH <br />3/4" BEING MINIMUM SIZE, ROUTE FROM EQUIPMENT CONNECTION POINTS INDICATEDTO <br />FLOOR DRAIN OR FLOOR SINK, PROVIDE AIR GAP OF TWO PIPE DIAMETERS MINIMUM PER <br />CODE� <br />24. PROVIDE FRAP PRIMERS WFIERE REQUIRED BY LOCAL AUTHORITIES <br />25. VALVES SHALL BE LINE SIZE LJNLESS OTHERWISE NOTED. <br />26. PROVIDE VERTICAL LIFT SPRING LOADED CHECK VALVES IN HOTAND COLD WATER <br />SUPPLIES FOR 3-COMPAR-TMENT SINKS, PRE -RINSE UNITS, ANDJANrrOR SINKS <br />DOWNSTREAM OF SHuFOFF VALVES, <br />2T WATER HAMMER ARRESTORS SHALL BE SIZE "B" UNLESS NO FED OTHERWISE, <br />28, ASSUMED MINIMUM 55 PSI SERVICE PRESS FOR DOMESTIC WATER SIZING. <br />29, SEE WASTE AND VENT ISOMETRIC ON SHEET P4 FOR' VENT ROUTING AND SIZING, <br />30. CARBONATED LIQUID WAS1 E PIPING SHALL BE OF CORROSIVE RESISTIVE MATERIAL. DO NOT <br />USE COPPER OR CAST IRON LINTIL. PROPER NEUTRALIZATION OR DILUTION HAS OCCURRED, <br />(CPC SECT10,N 811), <br />ABBREVIATIONS <br />ABB� <br />ics <br />3CS <br />AFF <br />BC <br />BFP <br />CID <br />EX <br />FCO <br />FID <br />FS <br />F -W <br />G <br />GW <br />KEC <br />LAV <br />MAX <br />DEFINITION <br />ONE COMPAR FMENT SINK <br />THREE COMPARTMENTSINK <br />ABOVE FINISHED FLOOR <br />BEVERAGE CONDUIT <br />BACKIFLOW PREVENTOR <br />CONDENSATE DRAIN <br />EXISTING <br />FLOOR CLEANOUT <br />FLOOR DRAIN <br />FLOOR SINK <br />FILTERED WATER <br />GAS <br />GREASE WASTE <br />KITCHEN EQUIPMENT CONTRACTOR <br />LAVATORY <br />MAXIMUM <br />ABB, <br />MBH <br />MIN <br />Ms <br />NTS <br />PC <br />TMV <br />Tp <br />Typ <br />UR <br />V <br />W <br />W/ <br />W/O <br />WC <br />WCO <br />WI -I <br />DEFINIFION <br />1000 B_FH PER HOUR <br />MINIMUM <br />MOP SINK <br />NOTTO SCALE <br />PLUMBING CONTRACTOR <br />THERMOSTATIC MIXING VALVE <br />TRAP PRIMER <br />TYPICAL <br />URINAL <br />VENT <br />WASTE <br />WITH <br />WITHOU T' <br />WATER CLOSET <br />WALL CLEANOUT <br />WATER HEATER <br />PLUMBING SYMBOL LEGEND <br />COLD WATER <br />UNDERSLAB GOLD WATER <br />Po <br />CONNECTIONS <br />11 o, i-IoT wA TER <br />1011 <br />MARK <br />DESCRIPTION <br />MANUFACFURER <br />MODEL <br />FIL rERED WATER <br />W <br />SANITARY WASTE <br />-GW--- <br />REMARKS <br />VENT' <br />--G---- <br />NAT URAL GAS PIPING <br />WASTE <br />VENT <br />CW <br />HW <br />Gs-- <br />AG -A <br />CO-- <br />ELBOW UP <br />P1 1 <br />SEE <br />TEE Ul"' <br />P3,2 <br />BALI VALVE <br />­­­ <br />AIR GAP FIT FING <br />ZURN <br />AG -5 <br />PLANS/ <br />MIXING VALVE <br />F`5� 1 <br />BALANCING VALVE <br />AIR GAP ADAPTER <br />AG -B <br />PRESSURE GAUGE -- <br />P5�2 <br />DETAILS <br />STRAINER <br />P6,1 <br />BACKFLOW PREVENTOR <br />BFP-1 <br />RECIRCULATION PUMP <br />375L. <br />03------- <br />FLOOR DRAIN <br />2-1/2" <br />FLOOR SINK <br />LEAD-FREE REDUCED PRESSURE PRINCIPLE ASSEMBLY, <br />FRENCH DRAIN <br />P7 <br />WASHING MACHINE BOX <br />CO -1 0----- <br />FLOOR CLEANOUT <br />CO -2 <br />WALL CLEANOUT <br />LESS SHUT-OFF'VALVES, SEE DETAIL VP61 <br />BFP­2 <br />ROOF DRAIN <br />375 -ST <br />GAS ELBOW <br />GAS TEE <br />LEAD-FREE STAINLESS STEEL REDUCED PRESSURE <br />PRESSURE REGULATOR <br />BACKIFLOW <br />SOLENOID VALVE <br />GASTEST FEE <br />cx--) <br />BAC KFLOW PREVEN TOR, SEE DE I AlL 1/ P6.2 <br />- ------- <br />EQUIPMENT JAG (RESTAURANT-) <br />ZUR.N <br />KEYED NOTE <br />Q5 <br />CONNECT -FO EXISTING <br />. . I . ­­­-­'­-­_ <br />BFP-3 <br />PREVENTOR <br />375 -XL. <br />LINE <br />LEAD-FIREE REDUCED PRESSURE BACKFLOW <br />SIZED <br />PREVENTOR, SEE DE FAIL- 6/P61 <br />BFP4 <br />740 <br />3/8" <br />CARBONATED BEVERAGE BACKFLOW PREVENTOR WITH <br />VENT, <br />CO -1. <br />FLOOR CLEANOUT <br />ZURN <br />ZB­1400-T-VP <br />LINE <br />ADJUSTABLE LEVELING, CAST-IRON BODY, HEAVY­DUT`Y <br />SIZED <br />SQUARE TOP, VANDAL-J-DROOF SCREWS, <br />CO -2 <br />WALL, CLEANOUT <br />ZURN <br />.. . <br />ZAB-1468-VP <br />. .. . . . ................ . . . <br />LINE <br />. <br />BRONZE PLUG WITH ROUND POLISHEL.) BRONZE COVER, <br />SIZED <br />VANDAL -PROOF SCREWS, <br />C.0-3 <br />EXTERIOR CLEANOUT <br />ZURN <br />Z­1400-vp <br />LINE <br />ADJUSTABLE LEVELING, CAST-IRON BODY, <br />SIZED <br />VANDAL-FIROOF SCREWS. <br />ETA <br />EXPANSION -TANK <br />AMTROL <br />ST- 12 <br />3/4" <br />4A GALLONS. SEE DETAIL 2/P6.1, NOWASME. <br />. . .. . ...... . <br />COMBINATION EYE -WASH / FAUCET/ DRENCH HOSE, <br />EW -1 <br />EYE -WASH <br />SPEAKMAN <br />SEF -9000 <br />.1 /2" <br />1/2" <br />PROVIDE SPEAKMAN SEF -TW MIXING VALVE, MAX FEMP <br />SETTING� 80'F. <br />CAST-IRON BODY W/ POLISHED NICKEL BRONZE SQUARE <br />FD --1 <br />ZB-415-5S-3NI- <br />LFGHT-DUTY ADJUSTABLE LEVELING STRAINER, <br />VANDAL PROOF SCREWS, PROVIDE W/ PROSET SYSTEMS <br />TRAP GUARD, <br />FLOOR DRAIN <br />ZURN <br />3" <br />1- 1/2" <br />ADJUSTABLE LEVELING CAST-IRON BODY W/ POLISHED <br />FD -2 <br />ZN-415­7E-3NI_, <br />NICKEL, BRONZE ROUND STRAINER W/ 4"0 FUNNEL, <br />VANDAL -PROOF SCREWS, PROVIDE W/ PROSE -F SYSTEMS <br />TRAP GUARD. <br />FD ­3 <br />f-D-2340-PV3-Y <br />ADJUSTABLE, PVC BODY, CAS FIRON GRATE. PROVIDE W/ <br />PROSET SYSTEMS -TRAP GUARD. <br />14"x`14"x5" PVC' BODY, PROVIDE W/ HALF -GRATE, PROVIDE <br />FS -1 <br />FD-2370-PV3 <br />31, <br />1-1/2" <br />TRAP PRIMER (TP, -1) AND CONNECTION IF: REQUIRED BY <br />LOCAL C'ODE, PLUG TRAP PRIMER CONNECTION IF NO F <br />FLOOR SINK <br />ZURN <br />U S ED. <br />14"x14"xV PVC BODY, NO GRATE, PROVIDE TRAP PRIMER <br />FS ­2 <br />FD-23'70-PV3 <br />3" <br />1-1/2" <br />(TIP -1) AND CONNECTION IF REQUIRED BY LOCAL CODE, <br />PLUG TRAP PRIMER CONNECTION IF NOTUSED, <br />SHALL BE EQUAL -TO BARGER AND SONS PRE -CAST. <br />GI­1� <br />GREASE INTERCEPTOR <br />6ll <br />3'' <br />INTERCEPTOR SHALL BE 1,500 GALLONS, SEE DETAIL <br />12/P6.1 <br />HB -1 <br />HOSE BIBB <br />ZURN <br />Z-1 321 <br />3/4" <br />L.00SE.-KEY NON -FREEZE FOR 4" WALL THICKNESS, <br />PROVIDED WITH APPROVED VACUUM BREAKER. <br />BOWL' PROVIDED BY COUNTERTOP SUPPLIER AS PART <br />OF COUNTER fOF1, <br />FAUCET, MOEN #8884, SINGLE HANDLE ADA METERING <br />L-1 <br />LAVATORY <br />MOEN <br />8414BN <br />1-1/2" <br />1-1/2" <br />1/2" <br />V2" <br />FAUCET (SETFOR 0,20 gpc (0,76 LICYCLE) @ 24 <br />SECONDS), CHROME FINISH, OPEN GRID STRAINER W1 <br />TAILPIECE, WHEEL HANDLE STOPS, 12"BRAIDED <br />STAINLESS STEEL. SUPPLY RISERS, CAST BRASS P -TRAP <br />WITH C/O PLUG, ADA COMBINATION -TRAP & SUPPLY <br />WRAP KIT, PROVIDE W/ MOEN #99550 4" DECK PLATE <br />MS -1 <br />MOP SINK <br />FIAT <br />MSB -3624 <br />3" <br />-1 /2" <br />1/2" <br />1/2'' <br />36"x24"x10" W/ SHELF, APPROVED VACUUM BREAI�E�, <br />LOOSE -KEY STOPS, PAIL HOOK, RUBBER HOSE. <br />LEAD-FREE THERMOSTATIC MIXING VALVE, DIAL <br />MV -1 <br />S59 -2080 -T -B -P <br />1-1/4" <br />THERMOMETER, WALL MOUNTING BRACKET, PIPED <br />MIXING VALVE <br />BRADLEY <br />ASSEMBLY WITH INLET AND OUTLET SHU FOFF <br />MV <br />S59 -4000-A- <br />'314" <br />LEAD-FREE THERMOSTATIC MIXING VALVE W/ 3/8" <br />-2 <br />S45-2456 <br />3/4" <br />COMPRESSION FITTINGS, 0.5 GPM MIN. FLOW. <br />460V, 30,6OHz, 3HP. DISCARD TANK, PROVIDED WITH <br />P-1 <br />BOOSTER PUMP <br />HYFAB <br />eMVPjr-3H43 <br />2l' <br />PUMP AND INSTALL GOULDS HYDROPRO V250 <br />DIAPHRAGM TANK <br />P-2 <br />CONDENSATE--- PUMP <br />LITTLE GIANT <br />VCC-20UL-S <br />3/8" <br />115 VOLTS. ROUTE CONDENSATE DISCHARGETO AIR GAP <br />(#554200) <br />FFFTING IN CASHIER DESK FIANDSINK VENT LINE. <br />P RV -1 <br />P R ESS U R R E D U C I N G <br />ZURN <br />500XLYSBR <br />2- /2" <br />PRESSURE REDUCING VALVE W/ INTEGRAL. BY-PASS <br />VALVE <br />CHECK VALVE AND STRAINER <br />R1.1-1 <br />ROOF DRAIN <br />ZURN <br />7A -100 -EA ­DP <br />4" <br />15"0 CAST IRON BODY W/ ALUMINUM DOME, DECK PLATE <br />RP -1 <br />RECIRCULATION PUMP <br />GRUNDFOS <br />ALP HA -1 5­55SF <br />3/4" <br />120V,,10, 601-1z, 1/25 HP, 4GPM, 14FT'OF HEAD, OPERATING <br />LC <br />IN AU_FO-ADAPTMODE, <br />CAST-IRON BODY W/ POLISHED BRONZE SQUARE <br />SD_i <br />SHOWER DRAIN <br />ZURN INDUSTRIES <br />ZB-415--5S-2NL <br />2'' <br />1-1/2" <br />LIGHT-DUTY ADJUSTABLE LEVELING STRAINER, <br />VANDAL -PROOF SCREWS, PROVIDE W/ PROSET SYSTEMS <br />TRAP GUARD, <br />. . ...... . .. <br />HYDRAPIPE AND ARM, DIVERTER VALVE AND HAND-HEL.D <br />SHOWER FOR ADA ACCESS - <br />SH -1 <br />SHOWER ASSEMBLY <br />SYMMONS <br />1-801SA58-FSB <br />2" <br />1-1/2" <br />1/2'' <br />SHOWER HEAD: SPEAKMAN S. -3010 -BN -E2 (2.OGPM), 5-JEA <br />HEAD W1 SWIVEL BALL CONNECTOR, QUICK DISCONNECT <br />TO BE MOUNTED AT HOSE TO BASE CONNECTION POINT. <br />ST -1 <br />HAMMER ARRESTOR <br />SIOUX CHIEF <br />653 -BS <br />:3/4" <br />3/4" MIP THREADED CONNECTION, <br />SV -_1 <br />AIR ADMITTANCE <br />STUDOR <br />20301 <br />2" <br />2" PVC AIR ADMITTANCE VALVE, LOCATE 4" MIN. ABOVE <br />VALVE <br />THE WEIR OF TRAP BEING SERVED, <br />TD -1 <br />FRENCH DRAIN <br />ZURN <br />Z8605 -RPG <br />4" <br />2" <br />'TRENCH DRAIN W/ 4" NO -HUB END OUTLET, REINFORCED <br />GALVANIZED PERFORATED GRATE CLASS B <br />AUTOMATICTRAP PRIMER VALVE, INSTALL AT A MINIMUM <br />TRAP PRIMER <br />SIOUX CHIEF <br />695-01 <br />OF 6" ABOVE THE GRID / FLOOD RIM OF THE FIXTURE(S) <br />BEING SERVED. <br />UR -1 <br />WALL MOUNT ED URINAL WITH TOTOTEU1 LN 12#CP FLUSH <br />VALVE (SET FOR 0,125 GPF) AND VACUUM BREAKER. <br />URINAL <br />ZURN <br />Z5755. -U <br />2ll <br />1-1/2" <br />3/4" <br />WALL MOUNTED URINAL WITH TOTO TEU1 LN1 2#CP FLUSH <br />UR -2 <br />VALVE (SET FOR 0.125 GF`F) AND VACUUM BREAKER <br />MOUNTED AT ADA HEIGHT, <br />WB_ -i <br />WASHER BOX <br />GUY -GRAY <br />WB -200 <br />2" <br />1-1/2" <br />1/2" <br />1/2" <br />1/4 TURN VALVES WITH 1/2" MIP / SWEAT CONNECTION, 2'l <br />THREADED DRAIN. <br />BOWL: ELONGATED, FLOOR MOUNTED, VITREOUS <br />CHINA, PROVIDE WITH APPROVED BACKFLOW <br />PREVENTION DEVICE OR METHOD. PROVIDE JONES <br />G13-002, CO2 ­993 CLOSET BOLF/WAX RING KIT <br />VALVE: IN REST ROOMS SHIAL L BETOTO TETI L.N32#C P <br />WC__1 <br />CT705EN <br />BATT ERY POWERED1.28 GPF ADA COMPLIANT, IN <br />SHOWERS SHALL BE_FOFO'T"MT1L,N-32#CP MANUAL 1.28 <br />GPF ADA COMPLIANT <br />SEAT, CHURCH 3155SSC OPEN FRONT SEAT W/ SELF <br />SUSTAINING CHECK HINGES, STA-TITE FASTENING <br />SYSTEM <br />WATER CLOSET <br />TOTO <br />4ll <br />2'' <br />BOWL - ADA HEIGHT, ELONGATED, FLOOR MOUNTED, <br />VITREOUS CHINA, PROVIDE WITH APPROVED BACKFLOW <br />PREVENTION DEVICE OR METHOD. PROVIDEJONES <br />G1 3-002, CO2 -993 CLOSET BOLT/WAX RI NG KI T. <br />VALVE: IN RES FIROOMS SHALL BE TOTO FETI LN32#CP <br />WC -2 <br />CT705ELN <br />BAFTERY POWERED 1.28 GPF ADA COMPLIANT, IN <br />SHOWERS SHALL BE To'TO TM rl LN 324CP MANUAL 1.28 <br />GPF ADA COMPLIAN F <br />SEAT� CHURCH 3155SSC OPEN FRONT SEATW/ SELF <br />SUSTAINING CHECK HINGES,sTA-TITE FASTENING <br />SYSTEM <br />METER FOR COLD WATER APPLICATION, INS FALL PER <br />WM-1 <br />WATER METER <br />BADGER METER <br />380CS <br />2" <br />MANUFACTURER'S SPECIFICATIONS AND CLEARANCES, <br />SEE DETAIL 5/P6 2 <br />GENERAL PLUMBING NO FES <br />1 DRAWINGS AIRE DIAGRAMMATIC ONLY AND REPRIESENTTHE GENERAL SCOPE OFTHE <br />WORK, PRIOR -TO SUBMITTING BID, VISIT THE JOB SITE TO OBSERVETHE EXISTING <br />CONDITIONS OFTHE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS <br />FOR ADDITIONAL REQUIREMENTS THAT MAYNOT BE SPECIFICALLY CALLED OUT INTHIS <br />PORTION OF TH E CONS TRUCTION DOC UM ENTS. NOTIFY ARCHITECT OF ANY CONFLICTS OR <br />DISCREPANCIES PRIOR TO, SUBMISSION OF BID. <br />2, INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE <br />REQUIREMENTS OF AUTHORITIES HAVING JURISDIC FION AND ALSO MEE1' ALL <br />REQUIREMENTSOFTHE LANDLORD, OBTAIN A COPY OFTHE LANDLORD'S REQUIREMENTS <br />AND REVIEW PRIOR"TO SUBMITTING BID, <br />3� PROVIDE A CONSTRUCTION RECORD SETOF "AS -BUILT" DOCUMENTS TO THE ARCHITECT' <br />REFLEC TING ANY VARIANCES OF INSTALLED PIPING LOCA-1-10NS OR EQUIPMEN ['CONTRARY <br />TO THE CONSTRUC TION DOCUMENTS, REFERTO SPECIFICATIONS. <br />4, PROVIDE TO THE ARCHITECT A COPY OF INSPECTION REPORT'S AND APPROVAL <br />CERTIFICATES FROM LOCAL AND STATE INSPECTIONS, REFER 1-0 SPECIFICATIONS, <br />5, PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS, <br />6. COMPLY WITH HEALTH DEPARTMENT REGULATIONS, PROVIDE CLEARANCE FOR CLEANING <br />BEHIND AND UNDER EXPOSED PIPING AS REQUIRED BY HEALTH DEPARTMENT, CONFORM <br />TO HEALTH DEPARTMENT REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS, <br />7, PROVIDE ITEMS AND WORK AS REQUIRE[) FOR A COMPLETE AND WORKING PLUMBING <br />INS FALLATION FOR EACH PIECE OF KITCHEN EQUIPMENT, PROVIDE ROUGH -INS AND <br />CONNECT' TO THE KITCHEN EQUIPMENT WITH TRAPS, SUPPLIES, SHUTOFF VALVES, PIPES -TO <br />THE WALL, ESCUTCI­­IEONS, ETC AS SHOWN, SPECIFIED AND REQUIRED, <br />8 VERIFY LOCATION AND DEPTH OF UTILITIES AT POINTS OF CONNECTION BEFORE START OF <br />PIPING INSTALLATION, <br />9, DO NOT SCALE FLOOR F'LANS FOR EXACTHORIZONTAL LOCA"rION OF PIPE ROUTING. <br />10� REFER TO ARCHITECTURAL PLANS FOR EXACTLOCATION AND MOUNTING HEIGH fS OF <br />PLUMBING FIXTURES, <br />11, COORDINATE ALL WASTE, VENF, WATER, GAS, CONDENSATE,AND STORM PIPING -TO AVOID <br />CONFLICT WITH OTHER­FRADES AND CONTRACTORS. DO NOT INSTAL,[., PIPING OVER <br />ELECTRICAL PANELS. COORDINATE PIPING INSTALLATION WITH STRUCTURAL GRADE BEAMS, <br />FOOTINGS, COLUMN PIERS, ETC, SLEEVE F1 IPI NGTH ROL)GH GRADE BEAMS, FOOTING, ETC, <br />WHERE REQUIRED AND AS NOTED ON PLANS. COORDINATE SLEEVE INSTALLATIONS WITH <br />THE ARCHITECT, STRUCTURAL ENGINEER, STRUCTURAL CONTRACTOR AND GENERAL <br />CONTRACTOR BEFORE CONCREFE IS INSTALLED. <br />12. COORDINATE ALL ROOF PENETRATIONS WITH OTHER TRADES, MAINTAIN 10'MINIMUM <br />CLEARANCE FROM ALL AIR INTAKES, MAINTAIN 2'-0" OF CLEARANCE FROM ALL OTHER <br />EQUIPMENT. <br />13. COORDINAT-E FLOOR DRAIN LOCATIONS WITH THE ARCHITECTURAL PLANS, INSTALL RIM OF <br />FLOOR DRAINS AND FLOOR SINKS BELOW FINISHED FLOOR LEVEL, <br />14� INS FALL CONCEALED PIPING -FIGHT TO THE STRUCTURE AND AS HIGH AS POSSIBLE, INSTALL <br />EXPOSED PIPINGTIGH-r To THE STRUCTURE, WALL OR CEILING AND AS HIGH AS POSSIBLE, <br />COORDINATE WITH OTHER TRADES DD AVOID CONFLICTS, <br />15� PAINT ALL EXPOSED GAS AND WATER PIPING USING RUST INHIBITOR PAINT, PAINTAND <br />COLOR SHALL BE COORDINATED WITH THE ARCHITECT AND / OR OWNER, <br />16, INSULATE ALL DOMESTIC WATER AND STORM DRAIN PIPING PER SECTION 15250 OF <br />SPEC I FICATIONS. <br />1T SEAL ALL PEN ETRATIONSTH ROUGH FLOORS, WALLS, CEILINGS AND ROOFS. REPAIR <br />SURFACES TO MATCH ADJACEN FAREAS. <br />1& INSTALL NO PLUMBING ROOF PENETRATIONS JHROUGH GREASE FILTER PANS ON THE <br />ROOF, REFER TO MECHANICAL DRAWINGS PRIOR TO STAR­FOF INS TALLATION. <br />19 PROVIDE WALL- BACKING OR SPECIFIED CARRIERS FORTHE PROPER SUPPORT OF <br />INSTALLED WAL.L. HUNG FIXTURES AND EQUIPMENT, <br />20, CLEAN INSTALLED PLUMBING FIXTURES AND EQUIPMENT, <br />21, SEAL AROUND INSTALLED FIXTURES AND KITCHEN EQUIPMENTWFT'H CAULK, <br />22, WHERE "FLEX" TUBING IS CALLED FOR, PROVIDE A FOUR FOOT COILED LENGTH OF TYPE <br />"K" SOFT COPPER -TUBING FROM WATER SHUT -OF -F VALVE TOTHE EQUIPMENT CONNECTION <br />OF SAME SIZE AS CONNEc rFON TO KITCI,-IEN EQUIPMEN f WITH 114" BEING MINIMUM SIZE. <br />PROVIDE CONNEc rORS AND ADAPTERS AS REQIJIRED, <br />21 PROVIDE INDIRECT WASTE LINES OF SAME SIZE AS CONNECTION TO EQUIPMEN IF WITH <br />3/4" BEING MINIMUM SIZE, ROUTE FROM EQUIPMENT CONNECTION POINTS INDICATEDTO <br />FLOOR DRAIN OR FLOOR SINK, PROVIDE AIR GAP OF TWO PIPE DIAMETERS MINIMUM PER <br />CODE� <br />24. PROVIDE FRAP PRIMERS WFIERE REQUIRED BY LOCAL AUTHORITIES <br />25. VALVES SHALL BE LINE SIZE LJNLESS OTHERWISE NOTED. <br />26. PROVIDE VERTICAL LIFT SPRING LOADED CHECK VALVES IN HOTAND COLD WATER <br />SUPPLIES FOR 3-COMPAR-TMENT SINKS, PRE -RINSE UNITS, ANDJANrrOR SINKS <br />DOWNSTREAM OF SHuFOFF VALVES, <br />2T WATER HAMMER ARRESTORS SHALL BE SIZE "B" UNLESS NO FED OTHERWISE, <br />28, ASSUMED MINIMUM 55 PSI SERVICE PRESS FOR DOMESTIC WATER SIZING. <br />29, SEE WASTE AND VENT ISOMETRIC ON SHEET P4 FOR' VENT ROUTING AND SIZING, <br />30. CARBONATED LIQUID WAS1 E PIPING SHALL BE OF CORROSIVE RESISTIVE MATERIAL. DO NOT <br />USE COPPER OR CAST IRON LINTIL. PROPER NEUTRALIZATION OR DILUTION HAS OCCURRED, <br />(CPC SECT10,N 811), <br />ABBREVIATIONS <br />ABB� <br />ics <br />3CS <br />AFF <br />BC <br />BFP <br />CID <br />EX <br />FCO <br />FID <br />FS <br />F -W <br />G <br />GW <br />KEC <br />LAV <br />MAX <br />DEFINITION <br />ONE COMPAR FMENT SINK <br />THREE COMPARTMENTSINK <br />ABOVE FINISHED FLOOR <br />BEVERAGE CONDUIT <br />BACKIFLOW PREVENTOR <br />CONDENSATE DRAIN <br />EXISTING <br />FLOOR CLEANOUT <br />FLOOR DRAIN <br />FLOOR SINK <br />FILTERED WATER <br />GAS <br />GREASE WASTE <br />KITCHEN EQUIPMENT CONTRACTOR <br />LAVATORY <br />MAXIMUM <br />ABB, <br />MBH <br />MIN <br />Ms <br />NTS <br />PC <br />TMV <br />Tp <br />Typ <br />UR <br />V <br />W <br />W/ <br />W/O <br />WC <br />WCO <br />WI -I <br />DEFINIFION <br />1000 B_FH PER HOUR <br />MINIMUM <br />MOP SINK <br />NOTTO SCALE <br />PLUMBING CONTRACTOR <br />THERMOSTATIC MIXING VALVE <br />TRAP PRIMER <br />TYPICAL <br />URINAL <br />VENT <br />WASTE <br />WITH <br />WITHOU T' <br />WATER CLOSET <br />WALL CLEANOUT <br />WATER HEATER <br />PLUMBING SYMBOL LEGEND <br />SHEETINDEX <br />SHEETS <br />COLD WATER <br />UNDERSLAB GOLD WATER <br />Po <br />140" HOT WATER <br />11 o, i-IoT wA TER <br />1011 <br />UNDERSLAB I I O�' HOT' WATER <br />HOT WA -1 ER RECI RC 0LATION <br />1W <br />FIL rERED WATER <br />W <br />SANITARY WASTE <br />-GW--- <br />GREASE WASTE <br />VENT' <br />--G---- <br />NAT URAL GAS PIPING <br />CONDENSATE PIPING <br />.--S-- <br />STORM LEADER <br />Gs-- <br />ELBOW DOWN <br />CO-- <br />ELBOW UP <br />P1 1 <br />TEE DOWN <br />TEE Ul"' <br />P3,2 <br />BALI VALVE <br />GATE VALVE <br />P4 <br />CHECKVALVE <br />MIXING VALVE <br />F`5� 1 <br />BALANCING VALVE <br />HOSE BIBB <br />PRESSURE GAUGE -- <br />P5�2 <br />UNION <br />STRAINER <br />P6,1 <br />BACKFLOW PREVENTOR <br />RECIRCULATION PUMP <br />P -TRAP <br />03------- <br />FLOOR DRAIN <br />FLOOR SINK <br />FRENCH DRAIN <br />P7 <br />WASHING MACHINE BOX <br />CO -1 0----- <br />FLOOR CLEANOUT <br />CO -2 <br />WALL CLEANOUT <br />AIR GAP FITTING <br />10 <br />ROOF DRAIN <br />GAS ELBOW <br />GAS TEE <br />PRESSURE REGULATOR <br />S <br />SOLENOID VALVE <br />GASTEST FEE <br />cx--) <br />EQUIPMENT TAG (PILOT) <br />CED <br />EQUIPMENT JAG (RESTAURANT-) <br />0 <br />KEYED NOTE <br />Q5 <br />CONNECT -FO EXISTING <br />SHEETINDEX <br />SHEETS <br />DESCRIPTIONS <br />PLUMBING PLAN <br />Po <br />LEGENDS arid SCHEDULES <br />7 75 �71 N G' 77 N----' <br />1011 <br />- <br />WAS FIE and VEN T`PI PING <br />1W <br />PLUMBING PLAN <br />P1,2 <br />WAS TE arid VE NT P I PI NO <br />PLUMBING PLAN <br />P2.1 <br />SERVICES PIPING <br />PLUMBING PLAN <br />P2�2 <br />SERVICES PIPING <br />PLUMBING PLAN <br />P1 1 <br />CONDENSATE, GAS, and STORM PIPING <br />PLUMBING PLAN <br />P3,2 <br />CONDENSATE, GAS, and STORM PIPING <br />PLUMBING PLAN <br />P4 <br />WASTE and VENT ISOMETRIC <br />PLUMBING PLAN <br />F`5� 1 <br />EQUIPMENT SCHEDULE <br />PLUMBING PLAN <br />P5�2 <br />SCHEDULES & CALCULATIONS <br />PLUMBING PLAN <br />P6,1 <br />DETAILS <br />PLUMBING PLAN <br />P6.2 <br />DE FAILS <br />PLUMBING PLAN <br />P7 <br />FIRE s ropPING DETAILS <br />10126/16 <br />ptw Flym i <br />cow"NTA <br />Tws DRA*"G fs 00"relENTM <br />NO M (A QM,0SLW OF TIMS MAWW <br />M K.RWT= EXU" AS UMMY <br />AuT"mzm ey Pix n,ym i <br />1W <br />ptw Flym i <br />cow"NTA <br />Tws DRA*"G fs 00"relENTM <br />NO M (A QM,0SLW OF TIMS MAWW <br />M K.RWT= EXU" AS UMMY <br />AuT"mzm ey Pix n,ym i <br />