END OF SECTION 4. Decrease from line size with long radius reducing elbows or reducers.
<br /> Support piping adjacent to pump such that no weight is carried on pump _
<br /> SECTION 221006 — PLUMBING PIPING SPECIALTIES casings. Provide supports under elbows on pump suction and discharge line
<br /> sizes 4 inches and over.
<br /> PART 1 GENERAL 5. Ensure pumps operate at specified system fluid temperatures without vapor
<br /> binding and cavitation, are non—overloading in parallel or individual
<br /> 1.01 SECTION INCLUDES operation, and operate within 25 percent of midpoint of published maximum 14W
<br /> A. Drains; Cleanouts; Backwater valves; Backflow preventers; Water hammer arrestors; efficiency curve.
<br /> Interceptors; Thermostatic mixing valves. 6. Align and verify alignment of base mounted pumps prior to start—up.
<br /> 7. Verify that proper power supply is available prior to ordering equipment.
<br /> PART 2 PRODUCTS Verify proper voltage, phase and current rating of power supply and inform
<br /> Engineer of any deviations prior to order, connection of equipment or
<br /> 2.01 BACK WATER VALVES start—up. Responsibility for verification of proper power supply voltage and
<br /> A. Manufacturers: Jay R. Smith Manufacturing Company, Savko Plastic Pipe & Fittings, any product returns or damage resulting from incorrect connections shall rest
<br /> Inc; Zurn Industries. with this Contractor.
<br /> B. Cast Iron Back Water Valves: ANSI A112.21.2M; lacquered cast iron body and cover, 8. Refer to vibration isolation requirements specified in Vibration Isolation
<br /> brass valve, extension sleeve, and access cover. section of this Specification.
<br /> C. Plastic Back Water Valves: ABS or PVC body and valve, extension sleeve, and access ©2017 STARBUCKS COFFEE COMPANY
<br /> cover. END OF SECTION
<br /> 2.02 BACKFLOW PREVENTERS
<br /> A. Manufacturers: Conbraco Industries; Watts Regulator Company, Zurn Industries, Inc. SECTION 224000 — PLUMBING FIXTURES STARBUCKS COFFEE
<br /> 2.03 WATER HAMMER ARRESTORS
<br /> A. Manufacturers: Jay R. Smith Manufacturing Company, Watts Regulator Company, Zurn PART 1 GENERAL COMPANY
<br /> Industries, Inc.
<br /> B. Water Hammer Arrestors: Stainless steel or copper construction, bellows type sized 1.01 SECTION INCLUDES 2401 UTAH AVENUE SOUTH
<br /> in accordance with PDI—WH 201, precharged suitable for operation in temperature A. All plumbing fixtures as scheduled on the Drawings. SEATTLE WASHINGTON 98134
<br /> range 34 to 250 degrees F and maximum 150 psi working pressure.
<br /> PART 3 EXECUTION (206)318-1575
<br /> PART 3 EXECUTION
<br /> 3.01 EXAMINATION THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> 3.01 INSTALLATION A. Verify that walls and floor finishes are prepared and ready for installation of
<br /> A. Install in accordance with manufacturer's instructions. fixtures. CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> B. Extend cleanouts to finished floor or wall surface. Lubricate threaded cleanout B. Verify that electric power is available and of the correct characteristics. PROPERTY OF STARBUCKS CORPORATION,
<br /> plugs with mixture of graphite and linseed oil. Ensure clearance at cleanout for 3.02 PREPARATION WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> rodding of drainage system. A. Rough—in fixture piping connections in accordance with minimum sizes indicated in THIS WORK. THEY SHALL NOT BE
<br /> C. Encase exterior cleanouts in concrete flush with grade. fixture rough—in schedule for particular fixtures. REPRODUCEDIN WHOLE OR IN PART SHARED
<br /> D. Install floor cleanouts at elevation to accommodate finished floor for a completely 3.03 INSTALLATION REPRODUCED(IN
<br /> flush installation. A. Install each fixture with trap, easily removable for servicing and cleaning. WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> E. Install approved potable water protection devices on plumbing lines where B. Install each fixture using brass angle ball stop valves for hot and cold water ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> contamination of domestic water may occur; on boiler feed water lines, janitor connections as applicable. Non—metallic valves or non—ball valve type stops will PROJECT WITHOUT THE PRIOR WRITTEN
<br /> rooms, fire sprinkler systems, premise isolation, irrigation systems, flush valves, not be accepted. CONSENT OF STARBUCKS CORPORATION.
<br /> drink mixing stations, interior and exterior hose bibbs and all other locations C. Provide chrome plated rigid or flexible supplies to fixtures with specified stops, THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> required by Codes. reducers, and escutcheons.
<br /> F. Pipe relief from backflow preventer to nearest drain. D. Install components level and plumb. INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> G. Install water hammer arrestors complete with accessible isolation valve on hot and E. Install and secure fixtures in place with wall carriers, wall supports and bolts. PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br /> cold water supply piping to all fixtures and equipment. F. Seal fixtures to wall and floor surfaces with sealant, color to match fixture. SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> G. Solidly attach floor mounted water closets to floor with lag screws. Lead NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> END OF SECTION flashing is not intended hold fixture in place. NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> H. Install fixtures and fittings in accordance with the manufacturer's instructions
<br /> SECTION 223000 — PLUMBING EQUIPMENT and in accordance with the ICC (IPC) or UPC. NOR LIABILITY TO THE OTHER(EXCEPT STATED
<br /> I. When fixtures require both hot water and cold water supplies, provide the hot water ABOVE)UNTIL A WRITTEN AGREEMENT IS
<br /> PART 1 GENERAL supply to the left of the cold water supply. FULLY EXECUTED BY BOTH PARTIES.
<br /> J. Install off—the—floor supports to conform to ASME A112.6.1 M.
<br /> 1.01 SECTION INCLUDES 3.04 INTERFACE WITH WORK OF OTHER SECTIONS
<br /> A. Water Heaters; Commercial gas fired water heaters when specified on plans; A. Review millwork shop drawings. Confirm location and size of fixtures and openings ARCHITECT OF RECORD
<br /> Commercial electric water heaters when specified on plans; Water softeners; Pumps; before rough—in and installation.
<br /> Circulators. 3.05 CLEANING mcg architecture
<br /> A. Clean PART 2 PRODUCTS 3.06 PROTECTION fixtures and equipment. y > c
<br /> A. Protect installed products from damage due to subsequent construction operations. .� L z
<br /> 2.01 WATER HEATER MANUFACTURERS B. Repair or replace damaged products before date of Substantial Completion. L o
<br /> A. A.O. Smith Water Products Co.; Bock Water Heaters, Inc.; Rheem Manufacturing 3.07 FIELD INSPECTION U
<br /> Company.; PVI. A. Continue inspection during installation and testing. CZn
<br /> 2.02 COMMERCIAL GAS FIRED WATER HEATERS B. Correct or replace all rejected equipment prior to installation.
<br /> A. Type: Automatic, natural gas—fired, vertical storage
<br /> B. Performance: Maximum working pressure: 150 psig; Equipment performance and END OF SECTION 111 Pacifica,Suite 280,Irvine,CA 92618
<br /> accessories shall be as scheduled on the Drawings and specified herein. Inclusion P:949.553.1117 F:949.474.7056
<br /> in both locations is not a prerequisite to inclusion in the Contract. Equipment
<br /> and accessories specified in either location shall be included in the Contract.
<br /> Provide all necessary accessories and connections as required for a complete, ENGINEERSTAMP OFESS/
<br /> functional system. PR OH
<br /> C. Tank: Glass or copper lined welded steel ASME labeled when required by code; �o y ROY SCy�I
<br /> multiple flue passages, 4 inch diameter inspection port, thermally insulated with
<br /> minimum 2 inches polyurethane, encased in corrosion—resistant steel jacket;
<br /> baked—on enamel finish; floor shield and legs. %
<br /> D. Accessories: Brass water connections and dip tube, drain valve, magnesium anode, No. M3329 m
<br /> and ASME rated temperature and pressure relief valve and heat trap fittings for hot
<br /> and cold water connections; Water Connections: Brass; Dip tube: Crosslinked
<br /> polyethylene (PEX) or brass; Drain Valve; Anode: Magnesium; Temperature and
<br /> Pressure Relief Valve: ASME labeled. FCHAN ICP �P
<br /> E. Certification: As automatic storage water heater and for operation at 180 degrees CIT
<br /> F (82 degrees C) for operation on combustible floors. F OF CA��F�
<br /> F. Controls: Automatic water thermostat with temperature range adjustable from 110 to
<br /> 180 degrees F (43 to 82 degrees C), automatic reset high temperature limiting
<br /> thermostat factory set at 195 degrees F, gas pressure regulator, multi—ribbon or Date. 03/24/2020
<br /> tubular burner, 100 percent safety shut—off pilot and thermocouple, flue baffle and
<br /> draft hood.
<br /> 2.02 COMMERCIAL ELECTRIC WATER HEATERS
<br /> A. Type: Factory—assembled and wired, electric, vertical or horizontal storage as
<br /> specified.
<br /> B. Performance: Maximum working pressure: 150 psig; Equipment performance and
<br /> accessories shall be as scheduled on the Drawings and specified herein. Inclusion
<br /> in both locations is not a prerequisite to inclusion in the Contract. Equipment
<br /> and accessories specified in either location shall be included in the Contract.
<br /> Provide all necessary accessories and connections as required for a complete,
<br /> functional system.
<br /> C. Electrical Characteristics: As indicated on the Drawings; Verify that proper power
<br /> supply is available prior to ordering equipment. Verify proper voltage, phase and
<br /> current rating of power supply and inform Engineer of any deviations prior to O
<br /> order, connection of equipment or start—up. Responsibility for verification of W N
<br /> proper power supply voltage and any product returns or damage resulting from J
<br /> incorrect connections shall rest with this Contractor. LO
<br /> ^ w LO
<br /> D. Tank: Glass lined or copper lined welded steel; ASME labeled pressure vessel when L.L W
<br /> required by code, 4 inch diameter inspection port, thermally insulated with minimum
<br /> 2 inches polyurethane encased in corrosion—resistant steel jacket; baked—on enamel Q Q
<br /> finish.
<br /> E. Controls: Automatic immersion water thermostat; externally adjustable temperature U)
<br /> range from 60 to 180 degrees F, flanged or screw—in nichrome elements, high W — z
<br /> temperature limit thermostat. Ed 06� 0 LL O
<br /> F. Accessories: Brass water connections and dip tube, drain valve, magnesium anode, —
<br /> and ASME rated temperature and pressure relief valve and heat trap fittings for hot Q U QU
<br /> and cold water connections; Water connections: Brass; Dip tube: Crosslinked Z Q
<br /> polyethylene (PEX) or brass; Drain Valve; Anode: Magnesium; Temperature and I__ LL
<br /> Pressure Relief Valve: ASME labeled. L) L)
<br /> G. Controls: Ventilated control cabinet, factory—wired with solid state progressive W 1 W
<br /> sequencing step controller, fuses, magnetic contactors, control transformer, pilot v O 0
<br /> lights indicating main power and heating steps, control circuit toggle switch, 0Q 0 V
<br /> electronic low—water (probe—type) cut—off, high temperature limit thermostat,
<br /> flush—mounted temperature and pressure gages. L.L r U)
<br /> H. Heating Elements: Flange—mounted immersion elements; individual elements sheathed
<br /> with Incoloy corrosion—resistant metal alloy, rated less than 75 Watts per square
<br /> 2.06 WATER SOFTENERS STORE #: 5470
<br /> A. Manufacturers: Verify Starbuck's requirements prior to ordering. Culligan
<br /> International Company; Sterling Water Systems, LLC. PROJECT#: 03030-052
<br /> B. Performance: Equipment performance and accessories shall be as scheduled on the
<br /> Drawings and specified herein. Inclusion in both locations is not a prerequisite CASEWORK CONCEPT: CORE
<br /> to inclusion in the Contract. Equipment and accessories specified in either ISSUE DATE: CHECKSET 2-10-20
<br /> location shall be included in the Contract. Provide all necessary accessories and
<br /> connections as required for a complete, functional system; Electrical PROGRAM MANAGER: M. DBREBIKA
<br /> Characteristics: As indicated on the Drawings. STORE DESIGNER: M. DBREBIKA
<br /> C. Control: Brass control valve cycled to regenerate from one to twelve day period.
<br /> 2.07 IN—LINE CIRCULATOR PUMPS LEED®AP: N/A
<br /> A. Manufacturers: Armstrong Pumps Inc; ITT Bell & Gossett; Sterling Fluid Systems; CHECKED BY: A. FELDMAN
<br /> Taco, Inc..
<br /> B. Casing: Bronze, rated for 125 psig working pressure; Impeller: Bronze; Shaft: MCG PROJECT#: 18531
<br /> Alloy steel with integral thrust collar and two oil lubricated bronze sleeve
<br /> bearings; Seal: Carbon rotating against a stationary ceramic seat; Drive: MCG PROJ. MANAGER: C. LEE
<br /> Flexible coupling. MCG PROJ. SPECIALIST: S.PARK
<br /> C. Performance: Equipment performance and accessories shall be as scheduled on the
<br /> Drawings and specified herein. Inclusion in both locations is not a prerequisite
<br /> to inclusion in the Contract. Equipment and accessories specified in either
<br /> location shall be included in the Contract. Provide all necessary accessories and Revision Schedule
<br /> connections as required for a complete, functional system; Electrical
<br /> Characteristics: As indicated on the Drawings; Verify that proper power supply is Rev Date By Description
<br /> available prior to ordering equipment. Verify proper voltage, phase and current
<br /> rating of power supply and inform Engineer of any deviations prior to order,
<br /> connection of equipment or start—up. Responsibility for verification of proper
<br /> power supply voltage and any product returns or damage resulting from incorrect
<br /> connections shall rest with this Contractor.
<br /> PART 3 EXECUTION
<br /> 3.01 INSTALLATION SHEET TITLE:
<br /> A. Install plumbing equipment in accordance with manufacturer's instructions, as PLUMBING
<br /> required by code, and complying with conditions of certification, if any.
<br /> B. Provide concrete equipment bases for all floor mounted plumbing equipment.
<br /> C. Coordinate with plumbing piping and related fuel piping, gas venting, and SPECIFICATIONS
<br /> electrical work as applicable to achieve operating system.
<br /> D. Pumps: Schnackel SCALE:AS SHOWN
<br /> 1. Ensure shaft length allows sump pumps to be located minimum 24 inches below
<br /> lowest invert into sump pit and minimum 6 inches clearance from bottom ofIneers
<br /> sump pit. NewYwk a Omaha a LwAngdo a 5 Honolulu SHEET SHEET NUMBER:
<br /> 2. Provide air cock and drain connection on horizontal pump casings. 80x581-0963 wwwachnackeLoom
<br /> 3. Provide line sized isolating valve and strainer on suction and line sized P-0003
<br /> soft seated check valve and balancing valve on discharge. 80 South Lake Avenue, suite s4o Pasadena, CA 91101
<br /> SE JOBQ: 181103
<br />
|