My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br />Section 00800 <br />15-1207 <br />contain the reasons for such intention to terminate, and Contractor shall immediately <br />cease any and all violations of the terms of this contract, ordinances, or laws and shall <br />correct to the Owner's satisfaction, or make satisfactory arrangements to correct to <br />Owner's satisfaction, within seven (7) days, from the date of said notice, any and all <br />deficient conditions. If Contractor, after proper notice, fails to cease and desist or fails to <br />cure deficiencies within the said seven (7) day period, Owner may terminate Contractor's <br />control over the project, terminate Contractor's right to complete the contract or <br />terminate this agreement by written notice to Contractor, said termination shall be <br />effective upon delivery of written notice to Contractor, his/her officers, agents or <br />employees, or notice by certified mail to Contractor's business address. <br />§14.2.2 DELETE this paragraph in its entirety and SUBSTITUTE the following: <br />When any of the above reasons exist, the Owner, upon certification by the initial <br />Decision Maker that sufficient cause exists to justify such actions, may without prejudice <br />to any other rights or remedies of the and after giving the Contractor and Contractor's <br />surety, seven (7) days written notice, terminate employment of the Contractor and may, <br />subject to any prior rights of the surety: <br />Exclude the Contractor from the site and in the interest of compensation for <br />project debt and damages, take possession of all materials, equipment, tools, <br />and machinery thereon owned by the Contractor until such time as outstanding <br />debts and damages are satisfied. <br />2 Accept assignment of subcontracts pursuant to Section 5.4 and finish the Work <br />by whatever reasonable method the owner may deem expedient. <br />.3 Upon written request of the Contractor, the Owner shall furnish to the Contractor <br />a detailed accounting of the costs incurred by the Owner in finishing the Work. <br />§14.2.3 DELETE this paragraph in its entirety and SUBSTITUTE the following: <br />§14.2.3 In the case of termination, Contractor shall not be entitled to receive further payment <br />until the project is complete. In the event of termination, Owner shall immediately serve <br />written notice thereof upon the Surety consistent with the terms and conditions set forth <br />in the performance bond incorporated within these contract documents. Surety shall not <br />be allowed to reappoint or contract with Contractor to complete this project without the <br />express written consent of the Owner. Upon termination, Contractor shall be ejected <br />from the project and Owner may without liability for so doing, take possession of and <br />utilize in completing the work, such materials, appliances, equipment, plant and other <br />property belonging to the Contractor as may be on the site of the work and necessary <br />therefore. <br />§14.2.4 DELETE this paragraph in its entirety and SUBSTITUTE the following: <br />§14.2.4 If the unpaid balance of the Contract sum exceeds costs of finishing the work, including <br />compensation for Architect's services and expenses made necessary thereby, and other <br />damages incurred by the Owner and not expressly waived, such excess shall be paid to <br />the Contractor. If such cost and damages exceed the unpaid balance, the Contractor <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.