My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br />Section 00800 <br />15-1207 <br />methods, as selected by the Owner, and shall state, identify and include state and city <br />sales tax; Federal Excise tax shall not be included (the Owner will issue exemption upon <br />request): <br />Mutual acceptance of a lump sum properly itemized as prescribed by the <br />Architect and supported by sufficient substantiating data to permit evaluation; <br />2 By unit prices stated in the Contract Documents or subsequently agreed upon; <br />3 By actual cost and a mutually acceptable fixed or percentage fee; <br />4 If none of the preceding methods is agreed upon then the total cost of such work <br />shall be based on the Contractor's expenditure or savings and a percentage for <br />overhead and profit. <br />Extra Credit <br />.a Material (attach itemized <br />quantity and unit cost plus sales <br />tax) and equipment <br />b Labor (attach Project Inspector <br />verified, itemized hours <br />and rates) <br />c Subtotal <br />A Subcontractor's overhead and profit, <br />(not to exceed 10% of line c) <br />for increases in Contract Amount <br />and to be a minimum of 5% <br />of line c for decreases in <br />Contract Amount. <br />e Subtotal <br />General Contractor's <br />overhead profit and bond <br />premium, insurance, and <br />supervision (5% on Subcontractor <br />work, 5% on material -only <br />charge, 15% on General <br />Contractor work for increase <br />to Contract Amount and to be <br />minimum of 5% of line a for <br />decreases to Contract Amount). <br />.g Total <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.