Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN 11 <br />Rol mhursement Agreement between the MHCSD and roma€ rremnwFt;mes <br />kLCthe Master D,2veIoper, and Section 3.6,12 of the Master Plan <br />Development Agreement betweon San Joaquin County and Trimaek <br />Cor,xmunitier, LL-�Ckhe Master Developer. The timing omit extent of all project <br />specific phased improvements of community roadways shall be determined <br />as part of MHCSD Traffic Studio-. fpr all lmp[ementing projects. <br />MHCSD Roadway Fundinsr Requirements. All Implementing projects shall <br />comply with the requirements of the MHCSD Mountain House Tran apArtatior+ <br />Improvement Fee Ordinance and Tec hnlcal Report Dated March 19, 2000, the <br />applicable provisions of the Mastar Acquisition and Reimbursement <br />Agreement between the MHCSD and Trimarkc Gonvniun[tic t tho Master <br />Developer, and Section 3.6.52 of the Master Plan Development Agreement <br />between San Joaquin County and Trimar*-Garsj£IiunWes-LLCthe Master <br />Devel_oper. <br />County Roadway FurWing Re auirements. All implementing projects shall <br />comply with tho requirements of the San Joaquin County Traffic Impact <br />Mitigation Fee Ordinance. <br />MHCSD Roadway Desilgn "luirements. All implementing projects shall <br />comply with the appiIca ble provislons of the MHCSO Development <br />Standards (see Sect! an 1: General Cosign Requirements and section 2: <br />Street Design Standards). <br />9.3 FREEWAY IMPROVEMENTS <br />Maste-r Plan 5urnmary <br />To provide for safe and effrolent access to Mountain House via the freeway system, the <br />Master flan requires that the community paitclpate in the implementation of regional <br />freevmy improvements on a "fair share" basis. Freeway improvements include mainline, <br />interchanges, HOV lanes, ramp metering, truck lanes, study repoYts, end plans. Major <br />Improvements to State routes wlfl be eompfeted in phases, ennsistientvMh the travel <br />demand estimated by State project study reports of Gounly improVement plans for <br />regional transportation facilities. Commun y access to 1-205 and 1-580 will be directed to <br />existing interchanges. <br />Plan Description <br />The uftimate improvements to the Mountain House ParkwayA-205 interchange required to <br />serve the entire Mountan House community are expecled to be under construction or <br />completed prior to the development of properties within SP II, As provided for In the <br />Master Plan, the community will pay its "falr share" of other freeway improvements <br />including mainline widening, HOV lanes, ramp metering, truck lanes and required studies- <br />SPII Implementation Measures <br />MHCSD Community Funding and Participation RequVuManU. All <br />imglementing projects shall cc mpily with the requirements of the MHCSD <br />CMAPTER r'IINF T8ANSPORTATION AND CIRCULATION PAGE 9.2 <br />Resolution Template 01/2017 <br />