Laserfiche WebLink
HCM 6th TWSC Existing Conditions <br /> 3: Roth Rd & 1-5 SB Off Ramp Timing Plan:AM Peak <br /> Intersection <br /> Int Delay,slveh 10.1 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations T. ) tt +T+ <br /> Traffic Vol,vehlh 0 83 16 157 60 0 0 0 0 246 5 40 <br /> Future Vol,vehlh 0 83 16 157 60 0 0 0 0 246 5 40 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized None - None None - - None <br /> Storage Length 0 0 - 520 <br /> Veh in Median Storage,# 0 - 0 16974 - 0 - <br /> Grade,% 0 - 0 0 - 0 - <br /> Peak Hour Factor 73 73 73 88 88 88 92 92 92 89 89 89 <br /> Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 0 114 22 178 68 0 0 0 0 276 6 45 <br /> Major/Minor Majorl Major2 Minor2 <br /> Conflicting Flow All 0 0 136 0 0 549 560 34 <br /> Stage 1 - - - - - - 424 424 - <br /> Stage 2 - - - 125 136 - <br /> Critical Hdwy 4.13 - 6.63 6.53 6.93 <br /> Critical Hdwy Stg 1 - _ - - 5.83 5.53 - <br /> Critical Hdwy Stg 2 - - - - - 5.43 5.53 - <br /> Follow-up Hdwy - 2.219 - 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 0 1447 - 0 481 436 1032 <br /> Stage 1 0 - - 0 629 586 - <br /> Stage 2 0 - - 0 900 783 - <br /> Platoon blocked, % - <br /> Mov Cap-1 Maneuver - - 1447 422 0 1032 <br /> Mov Cap-2 Maneuver - - 422 0 - <br /> Stage 1 - - - - 629 0 <br /> Stage 2 - 789 0 <br /> Approach EB WB SB <br /> HCM Control Delay,s 0 5.7 17.6 <br /> HCM LOS C <br /> Minor Lane/Major Mvmt EBT EBR WBL WBT SBW SBLn2 <br /> Capacity(vehlh) - 1447 422 523 <br /> HCM Lane VIC Ratio 0.123 0.437 0.273 <br /> HCM Control Delay(s) - 7.8 20 14.4 <br /> HCM Lane LOS - A - C B <br /> HCM 95th%tile Q(veh) - 0.4 - 2.2 1.1 <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 3 <br />