Laserfiche WebLink
HCM 6th TWSC Cumulative Conditions <br /> 3: Roth Rd & 1-5 SB Off Ram Timing Plan:PM Peak <br /> Intersection <br /> Int Delay,slveh 18.9 <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations I. ) tt 4� <br /> Traffic Vol,vehlh 0 112 50 199 135 0 0 0 0 350 4 53 <br /> Future Vol,vehlh 0 112 50 199 135 0 0 0 0 350 4 53 <br /> Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free t=ree Free Stop Stop Stop Stop Stop Stop <br /> RT Channelized _ _ None - None - - None - - None <br /> Storage Length - 0 - - 0 - 520 <br /> Veh in Median Storage,# - 0 - - 0 - 16974 - - 0 - <br /> Grade,% - 0 - 0 0 - - 0 - <br /> Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 <br /> Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Mvmt Flow 0 122 54 216 147 0 0 0 0 380 4 58 <br /> Major/Minor Majorl Major2 Minor2 <br /> Conflicting Flow All 0 0 176 0 0 728 755 74 <br /> Stage 1 - - - - - 579 579 - <br /> Stage 2 - 149 176 - <br /> Critical Hdwy 4.13 - - 6.63 6.53 6,93 <br /> Critical Hdwy Stg 1 - 5.83 5,53 - <br /> Critical Hdwy Stg 2 - 5.43 5.53 - <br /> Follow-up Hdwy 2,219 3.519 4.019 3.319 <br /> Pot Cap-1 Maneuver 0 1399 0 -374 337 973 <br /> Stage 1 0 - - - 0 525 500 - <br /> Stage 2 0 - - - 0 878 753 - <br /> Platoon blocked,% - - - <br /> Mov Cap-1 Maneuver - - - 1399 - - -316 0 973 <br /> Mov Cap-2 Maneuver - -316 0 - <br /> Stage 1 525 0 - <br /> Stage 2 743 0 - <br /> Approach EB WB SS <br /> HCM Control Delay,s 0 4.8 38 <br /> HCM LOS E <br /> Minor Lane/Major Mvmt EBT EBR WBL WBT SBLn1 SBLn2 <br /> Capacity(vehlh) 1399 - 316 400 <br /> HCM Lane VIC Ratio - 0.155 - 0.803 0.472 <br /> HCM Control Delay(s) - 8 - 50 21.8 <br /> HCM Lane LOS A - F C <br /> HCM 95th°/stile Q(veh) 0.5 - 6.6 2.5 <br /> Notes <br /> --:Volume exceeds capacity $:Delay exceeds 300s +: Computation Not Defined `:All major volume in platoon <br /> Frewert Parking TIS Synchro 10 Report <br /> TJKM Page 3 <br />