My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIBRELITE. MULTI -PORT DUAL POINT FILL 28 <br />SPILL CONTAINMENT ASSEMBLY W/ (2) 5 <br />GALLON SPILL BUCKETS CARB STAGE I EVR I�10 <br />COMPLIANT PER VR -102, <br />4" FILL ADAPTER AND CAP IN SPILL 37 38 <br />CONTAINMENT FILL BOX (TYP.) <br />WATERTIGHT SUMP SHIELD 34 18" <br />BOOT AND CLAMPS <br />MINI HYDROSTATIC 212 <br />SENSOR IN BRINE , <br />FACTORY SUPPLIED �. <br />RESERVOIR ° <br />PEA GRAVEL BACKFILL (TYP.) 6 Q <br />° <br />2 -IN -1 SENSOR BOX 217 <br />JUNCTION BOX 188 <br />SEE STATIC GROUNDING DETAILS <br />ON SHEET G.0.7.2 (TYP.) <br />#4 STRANDED BARE CU <br />GROUND WIRE TO OTHER <br />TANKS (TYP.) <br />#4 STRANDED BARE CU <br />GROUND WIRE TO <br />GROUND ROD (TYP.) <br />1 " FRP BONDED ENTRY FITTING8 124 <br />(TYP.) <br />1 " MONITORING CONDUIT (TYP.) 5 187 <br />(ROBROY THROUGH SUMP ONLY) <br />42" DOUBLE WALL POLYGON SUMP <br />BODY (8) FLAT PANELS <br />4" MIN. TO <br />TOP OF SPILL <br />BUCKET <br />3'-88" / <br />5 GALLON SPILL CONTAINER. <br />NO DRAIN VALVE (TYP.)4: 'Ad &lir <br />(TAPE z <br />° DEPTH 6" m <br />a . MIN. 12" cn <br />MAX.) <br />e06" <br />WIDE DETECTABLE UNDERGROUND <br />MARKING TAPE <br />EMPIRE MAGNATEC #32-143 <br />4" GALV. STEEL RISERS STAGE <br />22 I VAPOR RISER IS IN SAME <br />g PLANE AS TANK LEVEL GAUGE <br />IN THIS VIEW <br />CONTRACTOR TO INSTALL CLEVIS <br />AND COTTER PIN <br />OTANK G <br />&CAP AUGE ADAPTER <br />207 <br />E�&PROBEVEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />TANK LEVEL PROBE W/ TLS CAP <br />& RING. OVERFILL ALARM SET 90% <br />r <br />3" OVER 2" FIBERGLASS <br />CROSSOVER CONTAINS VACUUM <br />TUBING ONLY TO VAC SENSOR <br />ASSEMBLY <br />SUMP MONITOR LIQUID SENSOR H 12 126 3" FRP BONDED ENTRY FITTING & <br />MOUNTED IN HOLDER 202 M.5.3.15 4"x3" CONCENTRIC REDUCER W/ <br />_= 20 EXTRACTOR FITTING TEST PORT & PLUG <br />4%4%2" <br />1/4" DRAIN/TEST BUSHING. <br />OVERFILL PROTECTION DROP FACTORY INSTALLED TO <br />TUBE SET AT 95% (TYP.) 41 16 TEST CONTINUITY <br />A: SECTION VIEW - FILL SIDE SUMP (DIESEL TANK) <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />SCALE: 3/4" = 1'-0" <br />SUMP MONITOR LIQUID SENSOR , <br />MOUNTED IN HOLDER <br />MANWAY JACK SCREW (TYP.) <br />8" <br />3" D.W. FRP BONDED ENTRY FITTING & 12612 <br />4"x3" CONCENTRIC REDUCER W/ TEST <br />PORT & VACUUM TUBING ROUTED TO J <br />VAC SENSOR L 14 148 3" OVER 2" FIBERGLASS CROSSOVER <br />2" INSIDE 3" DW F.G. VACUUM <br />MONITORED VENT LINE <br />11 14 148 <br />2" BELL X MALE ADAPTER (TYP.) 14 ° <br />0 <br />0 <br />0 <br />0 o <br />0 <br />° o o ° / <br />0 <br />9 W-11 12 B: PLAN VIEW - FILL SIDE SUMP (DIESEL TANK) <br />0 <br />8" ACCESS PORT <br />CONTAINS VACUUM TUBING ONLY TO <br />VAC SENSOR ASSEMBLY <br />12 126 3" D.W. FRP BONDED ENTRY FITTING <br />& 4x3 CONCENTRIC REDUCER W/ <br />TEST PORT &PLUG <br />16 2" CAP. DRILL HOLES IN END AND <br />INSTALL GROMMETS FOR TUBING <br />PASS THROUGH <br />4" VAPOR RECOVERY ADAPTER &CAP IN SPILL <br />39 40 CONTAINMENT FILL BOX. PER CARB EVR VR -102, <br />NO DRAIN VALVE TO BE INSTALLED ON VAPOR <br />RECOVERY SPILL BUCKET <br />ALL MANHOLE ACCESS COVERS TO BELOW GRADE <br />SHALL BE LIQUID TIGHT AND LOCKABLE <br />FIBRELITE. MULTI -PORT DUAL POINT FILL SPILL <br />28 CONTAINMENT ASSEMBLY W/ (2) 5 GALLON SPILL <br />BUCKETS CARB STAGE I EVR COMPLIANT PER <br />VR -102, <br />42" DIA. BRINE MONITORED DOUBLE WALL <br />CONTAINMENT SUMP (TYP.) <br />0 <br />2"X18" FLEX CONNECTOR 15 174 � o <br />0 <br />i, 33" O.D. (SINGLE FILL) icnuj NJ vJ_ <br />L — J <br />0 <br />I <br />w z <br />CD zo <br />SLIP ON RISER 42" I.D. z J w <br />CO cn <br />FIELD SEALED JOINT. a g <br />(ADHESIVE SUPPLIED DW POLYGON BODY Q <br />W/ KIT) <br />3/8 X 1/4 SS <br />BUSHING <br />INSTALLED AT <br />FACTORY 1 1 6, o <br />N <br />FACTORY <br />� LAY-UP DW COLLAR <br />BONDED TO <br />TANK � <br />JOINT DETAILS ---- 2 <br />OCONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT CONNECTION FOLLOWING CURING OF 42" DIA. POLYGON SUMP BODY <br />ADHESIVE. SPECIFIC ATTENTION MUST BE GIVEN TO SURFACE PREP AS TESTING REQUIREMENTS (8) 17 3/8" FLAT PANELS <br />WILL DETECT THE SMALLEST OF FLAWS. ALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, <br />GASOLINE WITH 15% MTBE (METHYL TERTIARY -BUTYL ETHER), OR GASOLINE WITH 10% ETOH 1/4" DRAIN/TEST BUSHING. <br />(ETHANOL). FIBERGLASS AND RESIN MUST EXTEND 1/2" <br />BEYOND COVERAGE OF ADHESIVE. FACTORY INSTALLED <br />NOTE: <br />OTHE STRAP CHANNEL IF PRESENT ON THE FILL SIDE SUMP DOES NOT "COMMUNICATE" WITH CONTRACTOR SHALL BE HELD RESPONSIBLE <br />THE INSIDE OF THE SUMP. CONTRACTOR TO BE SURE TO LEAVE UNOBSTRUCTED PATH FOR FOR PROPER INSTALLATION &PREPARATION <br />STRAP TO PENETRATE INTO THE CHANNEL SO THAT TANKS MAY BE PROPERLY ANCHORED. PER MANUFACTURERS INSTRUCTIONS AND <br />SHALL REINSTALL SUMPS IF HYDROSTATIC <br />C: DOUBLE WALL FILL SUMP RISER TESTING SHOWS LEAKING IN THIS AREA OF <br />SCALE: 3/4" = 1'-0" THE SUMP. <br />O SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN 10 INSTALL TANK ID MARKERS IN THE SPILL CONTAINMENT MANHOLES. COVERS <br />SHALL BE PRIMED AND PAINTED ACCORDING TO SPECIFICATIONS. <br />O2 FIBER REINFORCEMENT TO BE USED. PRE -MIX UNIFORMLY THROUGHOUT 11 SECONDARY CONTAINMENT IS REQUIRED FOR ALL VENT AND STAGE II <br />CONCRETE. VAPOR RECOVERY PIPING. <br />O3 REINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 12 NOT USED <br />4" FROM SURFACE. <br />OREINFORCE CONCRETE SLAB AROUND MANHOLE WITH 4-#3 REBAR 60" I 13 LAYOUT TANKS &STAGE II VAPOR RECOVERY PIPING SUCH THAT THE STAGE <br />4 LENGTH. PLACE REBAR 6" FROM SIDES OF BOX. II PIPING DRAINS &ENTERS INTO REGULAR UNLEADED TANK FIRST W/ 3" <br />CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. <br />ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK. CONCRETE SHALL BE THICKENED AT THE THE FILL SUMPS DOWN TO <br />FOR STANDARD MONITORING DEVICES, LOOP CONTAINMENT SUMP 14 BELOW THE TOP OF CONTAINMENT OF THE DOUBLE WALL SUMP AS <br />OSENSORS, PLLD, VAC SENSORS &TANK GAUGE TO TANK INTERSTITIAL REQUIRED. DIMENSION OF SLAB THICKNESS VARIES WITH SITE CONDITIONS. <br />SENSOR LOCATION AND HOMERUN TO BLDG. PROVIDE SEAL -OFFS IN <br />BUILDING &PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO <br />INTRINSICALLY SAFE TROUGH IN BUILDING. CONDUITS SHALL CONTAIN <br />ONLY LOW VOLTAGE WIRING FOR SENSORS. ALL CONDUIT PENETRATIONS CROSSING FLEX CONNECTORS MUST MAINTAIN A MINIMUM OF 2 INCH <br />MUST BE MADE WITH ROBROY PVC COATED CONDUIT ONLY. 15 CLEARANCE OR THE USE OF AN ANTI CHAFING DEVICE MUST BE INSTALLED. <br />OPEA GRAVEL BACKFILL. ALL SUBSTITUTES MUST BE APPROVED BY OVERFLOW PROTECTION: UST OVERFLOW COMPLIANCE IS ACHIEVED BY <br />6 MANUFACTURER AND OWNER'S FIELD REPRESENTATIVE. USE OF OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT <br />95% AND IS IN ACCORDANCE WITH FEDERAL AND STATE GUIDELINES <br />PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" 16 FOR UST OVERFILL REQUIREMENTS. <br />O7 COMPACTED PEA GRAVEL BEDDING. PIPING SHALL NOT BE <br />SUPPORTED BY BLOCKS, PLANKS, OR OTHER DEBRIS. AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER <br />ROOT AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM <br />8 ALL ENTRIES TO BE PERPENDICULAR TO CONTAINMENT SUMP. OFFLINE PROVIDES AN AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) <br />18" MANHOLE 0 <br />0 PLASTIC CAP <br />REGULAR UNLEADED <br />SUPPLIED BY BP <br />J -BOX (TYP.) 189 <br />1 2 O3 4 <br />ULTRA LOW SULFUR DIESEL <br />-YELLOW <br />G <br />°a <br />!w <br />PEA GRAVEL <br />7 <br />166 9 <br />BACKFILL <br />4" FRP ANNULAR <br />SEAL OFF 16 <br />RISER <br />191 <br />18 6 <br />6 18 <br />TO TURBINE <br />SUMP <br />HOME RUN <br />171 66 <br />BRINE RESERVOIR <br />TO FILL SUMP <br />HYDROSTATIC 0 <br />SENSOR <br />F: ELEVATION - INTERSTITIAL SPACE MONITOR <br />SCALE: 3/4" = 1'-0" <br />® - NOTES <br />DOUBLE WALL SUMP <br />2" FIBERGLASS :�\\ <br />WALL <br />NIPPLE D.W. RIGID SUMP <br />2" FIBERGLASS PENETRATION FITTING <br />END CAP 12 126 <br />1/4" VACUUM <br />TUBING L 2" INSIDE 3" DOUBLE <br />DRILL AND TAP CAP WALL FIBERGLASS <br />1/2" WATER -TIGHT FOR 1/2" CORD GRIP. CROSSOVER PIPE FOR <br />ELECTRICAL CORD (APPLY PIPE SEALANT VACUUM TUBING <br />GRIPS (RATED FOR AS NEEDED) 14 148 <br />FUEL COMPATIBILITY) <br />G: VACUUM TUBE AT SUMP ENTRY DETAIL <br />SCALE: 3/4" = 1'-0" <br />PRODUCT SYMBOLOGY <br />OPTION: <br />PAINT API PRODUCT <br />SLAB ACCESS BOX--------' CODE COLOR ON LID <br />SHOWN WITHOUT LID I,, — — -t', <br />-RED <br />REGULAR UNLEADED <br />-WHITE <br />UNLEADED PLUS <br />-BLUE <br />ULTRA LOW SULFUR DIESEL <br />-YELLOW <br />ARE <br />INSTALLATION NOT PERMITTED. <br />FILLED TO THE 90% LEVEL. <br />O9 <br />REAM ALL RISERS FOR FULL PIPE BORE IF REQUIRED. <br />NOTE: CONTRACTOR TO USE ADDITIONAL <br />GALVANIZED FITTINGS AS REQUIRED TO06 <br />z <br />MINIMIZE BENDS IN FLEXIBLE CONNECTORS <br />XX NOTE: INDICATES ITEMS FOUND ON MATERIALS LIST SHEETS M.5.3.01 <br />SITE ADDRESS: <br />& M.5.3.02In <br />COLLAR <br />i <br />API COLOR -SYMBOL SYSTEM FOR PRODUCT IDENTIFICATION <br />WHITE CROSS <br />ON RED <br />CIRCLE <br />WHITE CROSS'0, <br />ON BLUE <br />CIRCLE <br />BLACK CROSS <br />ON WHITE <br />CIRCLE <br />YELLOW <br />HEXAGON <br />BLACK <br />LETTERS ON <br />BRONZE <br />BACKGROUND <br />BLACK <br />TRIANGLE ON <br />WHITE FIELD <br />UNLEADED ETHANOL <br />HIGH GRADE <br />MIDDLE GRADE <br />. PO <br />LOW GRADE <br />U <br />tow SULFUR uuluFaLYSULFUR Ri6wsuLEUR <br />DIESEL DIESEL 01ESEL <br />E85 <br />FLEX FUEL <br />OBSERVATION WILL VAPOR RECOVERY <br />REF: API 1637 -PRODUCT SYMBOLS <br />NOTE: THE ABOVE SYMBOLS REPRESENT INDUSTRY GUIDELINES <br />FOR PRODUCT IDENTIFICATION. CONSULT LOCAL DISTRIBUTION <br />MANAGER FOR LOCAL METHOD OF PRODUCT IDENTIFICATION TO <br />S���IDARD API COLOR AND <br />WHITE CROSS ON <br />RED CIRCLE, WITH <br />WHITE RING <br />WHITE CROSS ON <br />BLUE CIRCLE, WITH <br />WHITE RING <br />BLACK CROSS ON <br />WHITE CIRCLE, WITH <br />WHITE RING <br />YELLOW <br />HEXAGON/BLACK <br />LETTER (U) <br />BLUE STRIPE ON <br />YELLOW HEXAGON <br />ORANGE CIRCLE <br />PURPLE SQUARE <br />IDENTIFICATION SYMBOLS SCALE: NONE <br />STAGE I VAPOR DC/Y\\/CDV <br />FILL POR' <br />THIS AREA TO REMAIN <br />GREY OR WHITE <br />8" ACCESS PORT TO BE <br />ORIENTATED TO THE SAME <br />SIDE AS TANK LEVEL <br />GAUGE <br />API STANDARD COLORS <br />UNLEADED PREMIUM <br />-RED <br />REGULAR UNLEADED <br />-WHITE <br />UNLEADED PLUS <br />-BLUE <br />ULTRA LOW SULFUR DIESEL <br />-YELLOW <br />ACCESS COVER IDENTIFICATIONM,5,3,18 <br />STANDARD TWO POINT FILL SCALE: NONE <br />CLIENT: <br />bp <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. DATE DESCRIPTION <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />io <br />SEAL: <br />FESS /p <br />G�gp�l <br />N0. 36475 <br />* XP. 6-30-22 � <br />ATF � CAUF��� <br />z <br />LU <br />w � <br />•Q � <br />UQm o <br />Z z~�� <br />����� <br />mZ �o�� <br />0 � Q U � <br />QW cnz}'� <br />m <br />I I w w � O z o <br />Z z z U U o <br />Q Z N <br />Q w z 0 <br />m W w Q � � <br />z <br />Q -- <br />C.7oU <br />z� <br />LU � w <br />Q U O <br />z = <br />z 0- <br />z <br />z <br />g <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT N0: <br />10/28/2019 <br />DRAWING TITLE: <br />DIESEL FILL SUMP <br />INSTALLATION DETAILS <br />OPW <br />(DOUBLE WALL VENT) <br />SHEET N0: <br />
The URL can be used to link to this page
Your browser does not support the video tag.