Laserfiche WebLink
0, <br />1-1 /2"N.P.T. INLET (3) <br />CD <br />(.0 <br />I <br />7 <br />3 -76 <br />3'-7 )/4" INSIDE <br />1'-5" 1'-5" <br />K <br />fl <br />op 0 o <br />O cp O <br />PRODUCT #1 (REGULAR) 1012" <br />PRODUCT #2 (PREMIUM) <br />SIDE "A" <br />A—A DISPENSER MOUNTING DIAGRAM <br />SCALE: 1"=V-0" <br />DISPENSER SUMP FRAME <br />(ADJUSTABLE HEIGHT) <br />RUN CONDUITS THROUGH <br />OFFSET CAVITY IN <br />DISPENSER SUMP FRAME <br />C <br />POUR CONCRETE WITHIN THE <br />2 4.1 N <br />0 <br />ELECTRICAL OFFSET OPENING STEEL <br />FRAME BETWEEN DISPENSER SUMP, <br />SEAL WHERE CONCRETE OR CONDUIT <br />MEET STEEL. SEAL THE DOWNSIDE <br />OF THE SLOPE AND THE CONDUIT <br />AREA WITH "VULKEM 116" (SEE <br />DETAIL ON SHT. M.5.3.26) <br />B—B DISPENSER CONTAINMENT SUMP PLAN VIEW <br />DISPENSER <br />SKIN <br />1" N.P.T. VAPOR CABLE X 215 VAPOR PRESSUF <br />RECOVERY OUTLET JUNCTION BOX SENSOR <br />2 -WAY VAPOR FLOW <br />CALIBRATION 214 <br />> VALVE SENSOR <br />1" SHORT 82 VAPOR SHEAR <br />co NIPPLE VALVE <br />STABILIZER <br />ASSEMBLY <br />1/4" OD REDUCE THREADS <br />COPPER TUBING. FROM 1-1/2" TO <br />AVOID ANY 1/4" W/ DOUBLE <br />TRAPS! (BY TAP BUSHING(S) <br />CONTRACTOR) VAPOR RETURN <br />SLOTS FOR ANCHOR BACK TO TANKS <br />BOLTS, 6 SPACES CONTAINMENT <br />JUNCTION BOX SUMP <br />VST PHASE II W/ VEEDER—ROOT ISD <br />DISPENSERS SHALL BE MOUNTED SCALE: NTS BALANCE PHASE II SYSTEM <br />PER MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS. 6 BOLTS REQUIRED. HEALY PUMP 66 215 VAPOR PRESSURE <br />SENSOR <br />DISPENSER <br />SKIN <br />CABLE TO 5/8" COPPER TUBES & <br />JUNCTION BOX FITTINGS SUPPLIED WITH <br />W <br />2 -WAY HEALY VP1000 KIT <br />CALIBRATION <br />SCALE: 1" = 1'-0" <br />NOTE: CONDUITS SHALL NOT HEALY PHASE II W/ VEEDER—ROOT ISD <br />PENETRATE SUMP. ROUTE <br />THROUGH OFFSET FRAME SCALE: NTS VAC. ASSIST PHASE II SYSTEM <br />CAVITY. DO NOT CUT SIDE NOTE: <br />PANELS OF DISPENSER 1. ONLY (1) VAPOR PRESSURE CONCRETE SLAB <br />SENSING DEVICE REQUIRED CO <br />PER SITE. SENSOR SHALL BE <br />MOUNTED AT ONLY (1) <br />2 -IN -1 SENSOR 217 DISPENSER LOCATED CLOSEST a c° <br />BOX TO TANKS. d <br />SUMP SENSOR 189 PRODUCT SHEAR <br />J- BOX 81 VALVE (TYP.) 2• CONTRACTOR SHALL PITCH ALL <br />DISPENSER SKIN DISPENSER 1/4" TUBING AS REQUIRED TO J <br />J BOX PIPING UNIONS AVOID ANY LIQUID TRAPS a <br />ELBY CAPPED <br />w <br />VALVE <br />CIVIL SITE PLAN FOR ACTUAL <br />BY WAYNE <br />214 VAPOR FLOW <br />u u <br />ROUTING AND CONTINUATION I <br />0 <br />U <br />2 <br />SENSOR <br />HYDROSTATIC SENSOR <br />O <br />1" SHORT <br />U O <br />0 <br />INSIDE PRIMARY 212 <br />0 <br />z <br />• <br />C <br />NIPPLE <br />DISPENSER ISLAND <br />MANOMETER RESERVOIR <br />0 <br />82 VAPOR SHEAR <br />W <br />STRUCTURAL) \ <br />STABILIZER <br />SEE SHEET M.5.3.26 FOR <br />ATTACHED TO SUMP <br />VALVE <br />U <br />ASSEMBLY .;.• <br />J <br />O <br />0 <br />Z <br />IF STEEL FORM <br />SEAL OFF (TYP.) 191 <br />.•'e •' <br />° d e <br />^ <br />J <br />• <br />* XP. 6-30-22 <br />1/4" OD <br />2" OR 3" UNISTRUT PIPE <br />REDUCE THREADS <br />.d < ° <br />d, <br />MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. <br />COPPER TUBING. <br />CLAIMP AS REQUIRED <br />FROM 1-1/2" TO <br />UQm <br />AVOID ANY <br />z~00� <br />1/4" W/ DOUBLE <br />0 <br />mZ <br />rn <br />UOQ <br />�QU <br />TRAPS! (BY <br />W <br />TAP BUSHING(S) <br />CONDUIT <br />CONTRACTOR) <br />z U U o <br />VAPOR RETURN <br />1 " POWER/DATA <br />v <br />Llf Q Cfl <br />co <br />0 0 <br />06z�t <br />BACK TO TANKS <br />D <br />4 <br />CONTAINMENT <br />187 <br />CONDUIT <br />d'. a <br />d d • <br />SUMP <br />I <br />NOTE: CONDUITS SHALL NOT HEALY PHASE II W/ VEEDER—ROOT ISD <br />PENETRATE SUMP. ROUTE <br />THROUGH OFFSET FRAME SCALE: NTS VAC. ASSIST PHASE II SYSTEM <br />CAVITY. DO NOT CUT SIDE NOTE: <br />PANELS OF DISPENSER 1. ONLY (1) VAPOR PRESSURE CONCRETE SLAB <br />SENSING DEVICE REQUIRED CO <br />PER SITE. SENSOR SHALL BE <br />MOUNTED AT ONLY (1) <br />2 -IN -1 SENSOR 217 DISPENSER LOCATED CLOSEST a c° <br />BOX TO TANKS. d <br />SUMP SENSOR 189 PRODUCT SHEAR <br />J- BOX 81 VALVE (TYP.) 2• CONTRACTOR SHALL PITCH ALL <br />DISPENSER SKIN DISPENSER 1/4" TUBING AS REQUIRED TO J <br />J BOX PIPING UNIONS AVOID ANY LIQUID TRAPS a <br />ELBY CAPPED <br />w <br />i� <br />CIVIL SITE PLAN FOR ACTUAL <br />BY WAYNE <br />ELBOW (TYP.) <br />u u <br />ROUTING AND CONTINUATION I <br />0 <br />U <br />2 <br />82 VAPOR SHEAR VALVE <br />HYDROSTATIC SENSOR <br />O <br />U O <br />0 <br />INSIDE PRIMARY 212 <br />0 <br />z <br />0 <br />DISPENSER ISLAND <br />MANOMETER RESERVOIR <br />0 <br />W <br />STRUCTURAL) \ <br />I: °'. <br />SEE SHEET M.5.3.26 FOR <br />ATTACHED TO SUMP <br />a....:I <br />U <br />CONSTRUCTION DETAIL <br />J <br />O <br />0 <br />Z <br />IF STEEL FORM <br />SEAL OFF (TYP.) 191 <br />.•'e •' <br />° d e <br />^ <br />J <br />DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A <br />* XP. 6-30-22 <br />REQUIRED USE ITEM R <br />2" OR 3" UNISTRUT PIPE <br />d. <br />.d < ° <br />d, <br />MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. <br />FOR PRE -FAB FORM <br />CLAIMP AS REQUIRED <br />J <br />UQm <br />z <br />z~00� <br />1 " INTERCOM 7' <br />0 <br />mZ <br />rn <br />UOQ <br />�QU <br />W <br />Qw <br />I I w w <br />CONDUIT <br />z U U o <br />z z <br />Q LLl <br />1 " POWER/DATA <br />v <br />Llf Q Cfl <br />co <br />0 0 <br />06z�t <br />C5_ <br />d <br />4 <br />ATMOSPHERIC <br />187 <br />CONDUIT <br />d'. a <br />d d • <br />I <br />Q <br />DEVELOPMENT INFORMATION: <br />°'•' <br />° •. ° . . <br />a' <br />. <br />ADDRESS <br />o <br />Q <br />MANOMETER <br />1 " MONITORING 187 <br />DESIGNED BY: <br />CHECKED BY: <br />172 <br />1-1/2"x`18" FLEX <br />CONDUIT <br />e .. d <br />PROJECT NO: <br />° <br />bi <br />DRAWING TITLE: <br />DISPENSER DETAILS: <br />CONNECTOR <br />° <br />ON ISLANDS (D.W. VAPOR) <br />.. i <br />eLill <br />M,5,3,23 <br />° <br />I <br />OR <br />2" INSIDE 3" FRP 142 148 <br />171 <br />1-1/2"x12" FLEX <br />PRODUCT LINE <br />L�] <br />'� <br />L <br />CONNECTOR <br />3" D.W. FRP BONDED ENTRY 12612 <br />2" INSIDE 3" FRP <br />FITTING W/ 4"x3" CONCENTRIC <br />142 <br />148 VAPOR LINE <br />REDUCER W/ TEST PORT & <br />1/4" PLUG (TYP.) <br />85 <br />DOUBLE WALL UNDER <br />DISPENSER CONTAINMENT <br />SUMP SENSOR IN202 <br />SUMP FILLED WITH <br />HOLDER <br />PROPYLENE GLYCOL <br />C—C: FRONT VIEW SECTION DETAIL @ <br />DISPENSER SUMP <br />INTERSTITIAL FLUID, <br />SCALE: 1"=V-0" -0 <br />SUPPLIED BY BRAVO ONLY <br />NOTE: IF THERE IS NO ROOM TO INSTALL THE <br />VAPOR FLOW METER ABOVE THE SHEAR VALVE, <br />IT IS ACCEPTABLE TO INSTALL FLOW METER <br />BELOW SHEAR VALVE PER LATEST EDITION OF- <br />E.O. VR -202 ON HEALY SOLUTION & E.O. <br />VR -204 ON VST SOLUTION. SEE MOST RECENT <br />VEEDER ROOT INSTALLATION INSTRUCTIONS FOR <br />ISD FLOW METERS <br />WAYNE OVATION DISPENSER FRAME <br />2" OR 3" UNISTRUT PIPE----,,.,. <br />CLAIMP AS REQUIRED <br />6 WIDE DETECTABLE <br />UNDERGROUND MARKING <br />TAPE BURIED 6"-12" BELOW : <br />FINISHED GRA E: EMPIRE <br />MAGNATEC # 1-143 <br />p <br />d <br />a d <br />3" D.W. FRP BONDED <br />ENTRY FITTING W/ 4"x3" <br />CONCENTRIC REDUCER W/ <br />TEST PORT & 1/4" PLUG <br />(TYP.) 12612 <br />2 INSIDE 3 FRP 142 148 • <br />RECOVERY LINE <br />2" INSIDE 3" FRP 142 148 <br />PRODUCT LINE ° <br />"B" SIDE OF DISPENSER <br />215 VAPOR PRESSURE SENSOR <br />(ONLY 1 PER SITE) <br />214 VAPOR FLOW SENSOR <br />81 PRODUCT SHEAR VALVE <br />82 VAPOR SHEAR VALVE <br />DISPENSER ISLAND <br />C SEE SHEET M.5.3.26 FOR <br />CONSTRUCTION DETAIL <br />• a �� IF STEEL FORM <br />® REQUIRED USE ITEM90 <br />a v FOR PRE -FAB FORM <br />172 <br />1-1/2"x`18" FLEX <br />CONNECTOR <br />OR <br />171 <br />1-1/2"x`12" FLEX <br />CONNECTOR <br />2" FRP TEE FITTING W/ <br />REDUCER BUSHINGS AT 1 <br />DISPENSER ONLY, 2" FRP <br />a L ELBOW AT ALL OTHERS <br />PEA GRAVEL Jv JAI HOLDER <br />2" FRP ELBOW I �DCONTAINMENTH 164 144 DOUBLE WALL UNDER DISPENSER <br />2" FRP X 1-1 2' SUMP FILLED WITH <br />FNPT BUSHING PROPYLENE GLYCOL INTERSTITIAL <br />D—D — SIDE VIEW SECTION @ DISPENSER SUMP FLUID, SUPPLIED BY BRAVO ONLY <br />o- <br />P <br />U <br />D <br />w <br />w <br />X <br />a <br />28.7 26.9 <br />15.1 �, 15.1 v I 1 318 2� <br />FUEL WHIP HOSE & 1 <br />BREAK AWAY FOR <br />DISPENSER SIDE "B" <br />NOTE: I J <br />CAT 5 CABLE SHALL BE INSTALLED 0 <br />FOR BOTH ENHANCED OR STANDARD <br />ELECTRONICS 0 <br />w <br />�q z <br />12" X 12" STEEL II _j1 <br />CANOPY COLUMN <br />z <br />w <br />4" PVC CANOPY <br />DRAIN EACH COLUMN <br />(1) 1" CONDUIT TO1 <br />EACH COLUMN <br />m <br />00 <br />EXPANSION JOINT <br />(TYP.) SEE <br />CONCRETE DETAILS <br />SHEET M.5.3.26 <br />FOR DETAIL <br />a N <br />d <br />dd ° <br />.< <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR a <br />CONSTRUCTION DETAIL <br />LIF STEEL FORM ~ <br />U <br />REQUIRED USE ITEM gp � <br />FOR PRE -FAB FORM cn <br />w <br />w <br />cn <br />X <br />a <br />0 <br />I <br />I <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR <br />CONSTRUCTION DETAIL <br />IF STEEL FORM 1 <br />REQUIRED USE ITEM gp <br />FOR PRE -FAB FORM <br />6" THICK, 4000 PSI. - <br />FIBER REINFORCED <br />CONCRETE DRIVE SLAB SEE <br />SHEET G.0.2.2. FOR SPECS. <br />OPTIONAL STORM DRAIN----- <br />ROUTING, <br />RAIN-----ROUTING, SEE CIVIL SITE <br />PLAN FOR ACTUAL <br />ROUTING AND <br />CONTINUATION <br />w <br />i� <br />CIVIL SITE PLAN FOR ACTUAL <br />ARCO <br />a:Io <br />u u <br />ROUTING AND CONTINUATION I <br />0 <br />U <br />2 <br />z <br />W W <br />O <br />U O <br />0 <br />0 <br />FUEL WHIP HOSE & 1 <br />BREAK AWAY FOR <br />DISPENSER SIDE "B" <br />NOTE: I J <br />CAT 5 CABLE SHALL BE INSTALLED 0 <br />FOR BOTH ENHANCED OR STANDARD <br />ELECTRONICS 0 <br />w <br />�q z <br />12" X 12" STEEL II _j1 <br />CANOPY COLUMN <br />z <br />w <br />4" PVC CANOPY <br />DRAIN EACH COLUMN <br />(1) 1" CONDUIT TO1 <br />EACH COLUMN <br />m <br />00 <br />EXPANSION JOINT <br />(TYP.) SEE <br />CONCRETE DETAILS <br />SHEET M.5.3.26 <br />FOR DETAIL <br />a N <br />d <br />dd ° <br />.< <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR a <br />CONSTRUCTION DETAIL <br />LIF STEEL FORM ~ <br />U <br />REQUIRED USE ITEM gp � <br />FOR PRE -FAB FORM cn <br />w <br />w <br />cn <br />X <br />a <br />0 <br />I <br />I <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR <br />CONSTRUCTION DETAIL <br />IF STEEL FORM 1 <br />REQUIRED USE ITEM gp <br />FOR PRE -FAB FORM <br />6" THICK, 4000 PSI. - <br />FIBER REINFORCED <br />CONCRETE DRIVE SLAB SEE <br />SHEET G.0.2.2. FOR SPECS. <br />OPTIONAL STORM DRAIN----- <br />ROUTING, <br />RAIN-----ROUTING, SEE CIVIL SITE <br />PLAN FOR ACTUAL <br />ROUTING AND <br />CONTINUATION <br />w <br />I <br />CIVIL SITE PLAN FOR ACTUAL <br />ARCO <br />a:Io <br />u u <br />ROUTING AND CONTINUATION I <br />0 <br />U <br />FUEL WHIP HOSE & 1 <br />BREAK AWAY FOR <br />DISPENSER SIDE "B" <br />NOTE: I J <br />CAT 5 CABLE SHALL BE INSTALLED 0 <br />FOR BOTH ENHANCED OR STANDARD <br />ELECTRONICS 0 <br />w <br />�q z <br />12" X 12" STEEL II _j1 <br />CANOPY COLUMN <br />z <br />w <br />4" PVC CANOPY <br />DRAIN EACH COLUMN <br />(1) 1" CONDUIT TO1 <br />EACH COLUMN <br />m <br />00 <br />EXPANSION JOINT <br />(TYP.) SEE <br />CONCRETE DETAILS <br />SHEET M.5.3.26 <br />FOR DETAIL <br />a N <br />d <br />dd ° <br />.< <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR a <br />CONSTRUCTION DETAIL <br />LIF STEEL FORM ~ <br />U <br />REQUIRED USE ITEM gp � <br />FOR PRE -FAB FORM cn <br />w <br />w <br />cn <br />X <br />a <br />0 <br />I <br />I <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR <br />CONSTRUCTION DETAIL <br />IF STEEL FORM 1 <br />REQUIRED USE ITEM gp <br />FOR PRE -FAB FORM <br />6" THICK, 4000 PSI. - <br />FIBER REINFORCED <br />CONCRETE DRIVE SLAB SEE <br />SHEET G.0.2.2. FOR SPECS. <br />OPTIONAL STORM DRAIN----- <br />ROUTING, <br />RAIN-----ROUTING, SEE CIVIL SITE <br />PLAN FOR ACTUAL <br />ROUTING AND <br />CONTINUATION <br />° 14 <br />aI <br />V) <br />0 <br />L0Li - <br />0 <br />w <br />z <br />o- <br />w1 <br />z <br />wl <br />U <br />n <br />u <br />w <br />I <br />CIVIL SITE PLAN FOR ACTUAL <br />ARCO <br />a:Io <br />NO. <br />ROUTING AND CONTINUATION I <br />0 <br />U <br />2 <br />z <br />W W <br />O <br />U O <br />0 <br />0 <br />z <br />0 <br />BELOW. (SEE <br />0 <br />W <br />STRUCTURAL) \ <br />I: °'. <br />I <br />°`� °,.4 .;• °.< •.°. '.. d:°'.: *MINIMUM RECOMMENDED <br />InI .e;. <br />a....:I <br />U <br />J <br />O <br />0 <br />Z <br />d. <br />SEAL: <br />.•'e •' <br />° d e <br />^ <br />J <br />DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A <br />* XP. 6-30-22 <br />Q <br />°, <br />ARCHITECTURAL COLUMN WRAPPING IS REQUIRED THE 1'-4 1/4" <br />.d < ° <br />d, <br />MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. <br />_' <br />'.'A <br />° ° d <br />° <br />J <br />UQm <br />o <br />z <br />z~00� <br />0 <br />0 <br />mZ <br />rn <br />UOQ <br />�QU <br />W <br />Qw <br />I I w w <br />m < <br />O z o <br />z U U o <br />z z <br />Q LLl <br />p Z R <br />wz0-- <br />} <br />o <br />Llf Q Cfl <br />co <br />0 0 <br />06z�t <br />C5_ <br />Q <br />O <br />U <br />a' <br />. <br />d'. a <br />d d • <br />I <br />Q <br />DEVELOPMENT INFORMATION: <br />°'•' <br />° •. ° . . <br />a' <br />. <br />ADDRESS <br />o <br />Q <br />SAN JOAQUIN COUNTY, CA 95205 <br />° <br />DESIGNED BY: <br />CHECKED BY: <br />bi <br />° <br />ER <br />e .. d <br />PROJECT NO: <br />° <br />bi <br />DRAWING TITLE: <br />DISPENSER DETAILS: <br />WAYNE OVATION (3+0) BLEND <br />° <br />ON ISLANDS (D.W. VAPOR) <br />.. i <br />eLill <br />M,5,3,23 <br />° <br />I <br />° 14 <br />aI <br />V) <br />0 <br />L0Li - <br />0 <br />w <br />z <br />o- <br />w1 <br />z <br />wl <br />U <br />n <br />u <br />2 -IN -1 SENSOR BOX 21 <br />SUMP SENSOR J -BOX 18 <br />ELBY CAPPED ELBOW (TYP.) <br />SEAL -OFF (TYP.) <br />RUN CONDUITS THROUGH <br />OFFSET IN DISPENSER <br />SUMP FRAME (TYP.), <br />DISPENSER 187 <br />INTERCOM <br />CONDUIT <br />1 " DISPENSER <br />POWER & DATA 187 <br />CONDUIT <br />1" MONITORING18 <br />CONDUIT <br />SUMP MONITOR <br />LIQUID SENSOR <br />DISPENSER <br />BRINE RESERVOIR & <br />212 HYDROSTATIC SENSOR <br />ATTACHED TO SUMP <br />DISPENSER JUNCTION <br />BOX (TYP.) <br />DISPENSER CONTAINMENT SUMP CONDUIT ROUTING DETAIL <br />SCALE: NONE <br />*MINIMUM RECOMMENDED <br />DIMENSION. SEE NOTE BELOW <br />LINE OF CANOPY / <br />COLUMN <br />3'-8„ <br />1'- <br />/ <br />STORM DRAIN ROUTING, SEE <br />Z <br />I <br />CIVIL SITE PLAN FOR ACTUAL <br />ARCO <br />a:Io <br />NO. <br />ROUTING AND CONTINUATION I <br />0 <br />U <br />2 <br />z <br />W W <br />1 <br />U O <br />0 <br />0 <br />LINE OF FOUNDATION <br />0 <br />BELOW. (SEE <br />0 <br />STRUCTURAL) \ <br />I: °'. <br />I <br />°`� °,.4 .;• °.< •.°. '.. d:°'.: *MINIMUM RECOMMENDED <br />InI .e;. <br />a....:I <br />10 <br />J <br />a.. <br />0 <br />90 <br />(NP') <br />d. <br />SEAL: <br />.•'e •' <br />° d e <br />^ <br />J <br />DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A <br />* XP. 6-30-22 <br />a.•. <br />°, <br />ARCHITECTURAL COLUMN WRAPPING IS REQUIRED THE 1'-4 1/4" <br />.d < ° <br />d, <br />MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. <br />_' <br />'.'A <br />° ° d <br />° <br />DIMENSION. SEE NOTE BI <br />UQm <br />o <br />z <br />z~00� <br />0 <br />0 <br />mZ <br />rn <br />UOQ <br />�QU <br />Qw <br />I I w w <br />m < <br />O z o <br />z U U o <br />z z <br />Q LLl <br />p Z R <br />wz0-- <br />} <br />Llf Q Cfl <br />co <br />0 0 <br />06z�t <br />C5_ <br />Q <br />W R W <br />z <br />° •. a . . <br />a' <br />. <br />d'. a <br />d d • <br />° <br />U <br />DEVELOPMENT INFORMATION: <br />°'•' <br />° •. ° . . <br />a' <br />. <br />ADDRESS <br />d a <br />a d • <br />SAN JOAQUIN COUNTY, CA 95205 <br />° <br />DESIGNED BY: <br />CHECKED BY: <br />° <br />ER <br />e .. d <br />PROJECT NO: <br />° <br />DRAWING TITLE: <br />DISPENSER DETAILS: <br />WAYNE OVATION (3+0) BLEND <br />° <br />ON ISLANDS (D.W. VAPOR) <br />.. i <br />eLill <br />M,5,3,23 <br />° <br />I <br />L�] <br />'� <br />L <br />.d ° a ;e <br />'d ° a ;e <br />• (SEE STRUCTURAL) <br />• (SEE STRUCTURAL) <br />DISPENSER ON ISLAND INSTALLATION <br />DETAILS <br />SIDE ELEVATION <br />NOTE: CANOPY FOOTINGS <br />CAN BE VERY <br />FRONT ELEVATION <br />SCALE: 1" = 1'-0" <br />LARGE AND CAN VARY IN <br />SIZES. SEE <br />STRUCTURAL DRAWINGS. <br />2 -IN -1 SENSOR BOX 21 <br />SUMP SENSOR J -BOX 18 <br />ELBY CAPPED ELBOW (TYP.) <br />SEAL -OFF (TYP.) <br />RUN CONDUITS THROUGH <br />OFFSET IN DISPENSER <br />SUMP FRAME (TYP.), <br />DISPENSER 187 <br />INTERCOM <br />CONDUIT <br />1 " DISPENSER <br />POWER & DATA 187 <br />CONDUIT <br />1" MONITORING18 <br />CONDUIT <br />SUMP MONITOR <br />LIQUID SENSOR <br />DISPENSER <br />BRINE RESERVOIR & <br />212 HYDROSTATIC SENSOR <br />ATTACHED TO SUMP <br />DISPENSER JUNCTION <br />BOX (TYP.) <br />DISPENSER CONTAINMENT SUMP CONDUIT ROUTING DETAIL <br />SCALE: NONE <br />*MINIMUM RECOMMENDED <br />DIMENSION. SEE NOTE BELOW <br />LINE OF CANOPY / <br />COLUMN <br />3'-8„ <br />1'- <br />/ <br />STORM DRAIN ROUTING, SEE <br />Z <br />I <br />CIVIL SITE PLAN FOR ACTUAL <br />ARCO <br />a:Io <br />NO. <br />ROUTING AND CONTINUATION I <br />DESCRIPTION <br />U <br />2 <br />z <br />W W <br />1 <br />U O <br />0 <br />0 <br />LINE OF FOUNDATION <br />0 <br />BELOW. (SEE <br />0 <br />STRUCTURAL) \ <br />bi <br />10 <br />11 <br />DISPENSER ISLAND <br />0 <br />90 <br />(NP') <br />* NOTE: THESE DIMENSIONS REPRESENT MINIMUM RECOMMENDED <br />SEAL: <br />OFFSET DIMENSIONS TO PROVIDE DESIRED CLEARANCE OF THE <br />DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A <br />* XP. 6-30-22 <br />MAXIMUM 12"X12" NON-CLADDED COLUMN DESIGN. WHERE <br />- CAUF��� <br />ARCHITECTURAL COLUMN WRAPPING IS REQUIRED THE 1'-4 1/4" <br />z <br />MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. <br />Lu <br />2 <br />DISPENSER ON ISLAND PLAN VIEW <br />w � <br />Q rn <br />SCALE: 1"=V-0" <br />64)FUEL WHIP HOSE <br />��FUEL HOSE BREAKAWAY <br />WAYNE "OVATION" 3+0 <br />5- �l BLENDER <br />61 NOZZLE (TYP.) <br />62 SWIVEL (TYP.) <br />63 FUEL HOSE <br />SEE BOLLA 91 <br />DETAIL ON <br />SHEET G. .5 <br />0 <br />I <br />1 3'-p» <br />pd . <br />EAU <br />d .• <br />1 EXPANSION <br />JOINT (TYP.) o <br />SEE CONCRETE I d <br />DETAILS SHEET <br />M.5.3.26 FOR a <br />DETAIL <br />rx <br />a. <br />85 DOUBLE WALL UNDER DISPENSER <br />CONTAINMENT SUMP FILLED WITH <br />PROPYLENE GLYCOL INTERSTITIAL <br />FLUID, SUPPLIED BY BRAVO ONLY <br />COMPACTED OR NATIVE SOIL <br />1 (TYPICAL) <br />NOTE: <br />IF REQUIRED BY LOCAL <br />CODES, EXTEND CONCRETE <br />UNDER BOLLARD BELOW THE <br />FROST LINE. <br />}--PROJECTION OF ADA REQUIRED <br />ADA PLATFORM (NTS SEE BELOW) <br />SIDE "B" <br />IN <br />1 � <br />W � <br />O� <br />I z0 <br />�1 00 <br />I z z �' DISPENSER ISLAND <br />N SEE SHEET M.5.3.26 FOR <br />/ 0 CONSTRUCTION DETAIL <br />Fz� IF STEEL FORM <br />REQUIRED USE ITEM90 <br />FOR PRE -FAB FORM <br />SIDE "A" <br />3'-712" <br />3'-0" � <br />5'-p„ <br />EXACT LOCATION <br />SUBJECT TO AUTHORITY <br />ADA REQUIRES 48"x30" MAX AREA IN FRONT OF HAVING JURISDICTION. <br />BOTH SIDES OF MPD, SLOPE NOT TO EXCEED 2%.� SEE BOLLARD DETAIL <br />THERE SHALL BE A 10" MAX DISTANCE FROM THE ON SHEET G.0.5 <br />EDGE OF PLATFORM TO DISPENSER FACE FOR SID <br />REACH NOTE: INDICATES ITEMS FOUND ON <br />1/1///////1//////L/ SMATERIALS LIST SHEET M.5.3.01 & M.5.3.02 <br />91: <br />CLIENT: <br />bp <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. <br />DATE <br />DESCRIPTION <br />0 <br />2 <br />0 <br />0 <br />0 <br />0 <br />10 <br />11 <br />0 <br />SEAL: <br />FESS/' <br />Gf-�gpl <br />N0. 36475 <br />* XP. 6-30-22 <br />ATFOF <br />- CAUF��� <br />z <br />Lu <br />2 <br />• <br />w � <br />Q rn <br />UQm <br />o <br />z <br />z~00� <br />0 <br />0 <br />mZ <br />rn <br />UOQ <br />�QU <br />Qw <br />I I w w <br />m < <br />O z o <br />z U U o <br />z z <br />Q LLl <br />p Z R <br />wz0-- <br />} <br />Llf Q Cfl <br />co <br />0 0 <br />06z�t <br />C5_ <br />Q <br />W R W <br />z <br />0 <br />z 0 <br />z � <br />z <br />g <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT NO: <br />10/28/2019 <br />DRAWING TITLE: <br />DISPENSER DETAILS: <br />WAYNE OVATION (3+0) BLEND <br />DISPENSER INSTALLATION DETAILS <br />ON ISLANDS (D.W. VAPOR) <br />SHEET NO: <br />M,5,3,23 <br />