Laserfiche WebLink
3'-77/6„ <br />1 x_5.3'- 7 Y4" INSIDE' -5" <br />1-1 /2"N.P.T. INLET (3) <br />10 2" <br />00 <br />"1 "I <br />PRODUCT #1 (REGULAR) 101/2» <br />PRODUCT #2 (PREMIUM) <br />SIDE "A" <br />A—A DISPENSER MOUNTING DIAGRAM <br />SCALE: 1"=V-0" <br />DISPENSER SUMP FF <br />(ADJUSTABLE HEI <br />RUN CONDUITS THROUGF <br />OFFSET CAVITY IP <br />DISPENSER SUMP FRAME <br />POUR CONCRETE WITHIN <br />ELECTRICAL OFFSET OPEN <br />FRAME BETWEEN DISPENS <br />SEAL WHERE CONCRETE ( <br />MEET STEEL. SEAL THE D <br />OF THE SLOPE AND THE UUNUUll <br />AREA WITH "VULKEM 116" (SEE <br />DETAIL ON SHT. M.5.3.26) <br />B—B DISPENSER CONTAINMENT SUMP PLAN VIEW <br />SCALE: 1 " = V-0" <br />DISPENSER <br />NOTE: CONDUITS SHALL NOT HEALY PHASE II W/ VEEDER—ROOT ISD <br />PENETRATE SUMP. ROUTE <br />THROUGH OFFSET FRAME SCALE: NTS VAC. ASSIST PHASE II SYSTEM <br />CAVITY. DO NOT CUT SIDE NOTE: <br />PANELS OF DISPENSER 1. ONLY (1) VAPOR PRESSURE CONCRETE SLAB <br />SENSING DEVICE REQUIRED c° <br />PER SITE. SENSOR SHALL BE <br />MOUNTED AT ONLY (1) •� <br />2 -IN -1 SENSOR 217 DISPENSER LOCATED CLOSEST a <br />ro <br />BOXTO TANKS. d <br />SUMP SENSOR 189 81 PRODUCT SHEAR 2. CONTRACTOR SHALL PITCH ALL <br />J -BOX � VALVE (TYP.) <br />DISPENSER SKIN DISPENSER 1/4" TUBING AS REQUIRED TO J <br />J BOX PIPING UNIONS AVOID ANY LIQUID TRAPS a <br />ELBY CAPPED <br />bp <br />SKIN <br />BY WAYNE <br />0 <br />a.., v. <br />NO. <br />CABLE TO215 <br />DESCRIPTION <br />VAPOR PRESSUF <br />PRODUCT #3 (DIESEL) <br />JUNCTION BOX <br />HYDROSTATIC SENSORDISPENSER <br />SENSOR <br />°° a a . a <br />2 -WAY <br />INSIDE PRIMARY212 <br />0 <br />CALIBRATION <br />ISLAND <br />MANOMETER RESERVOIR <br />214 VAPOR FLOW <br />1" N.P.T. VAPOR <br />SEE SHEET M.5.3.26 FOR <br />VALVE <br />SENSOR <br />CONSTRUCTION DETAIL <br />SEAL OFF (TYP.) 191 <br />RECOVERY OUTLET <br />IF STEEL FORM <br />REQUIRED USE ITEMgp <br />2" OR 3" UNISTRUT PIP <br />a <br />d. <br />SEAL: <br />FESS /p <br />Gf-�gp�l <br />1" SHORT <br />* XP. 6-30-22 <br />82 VAPOR SHEAR <br />CLAIMP AS REQUIRE <br />�`a 'a a' <br />.. 'a <br />z <br />NIPPLE <br />• <br />VALVE <br />1 INTERCOM <br />j <br />Z <br />z~�� <br />STABILIZER <br />~' <br />mZ <br />UOQ <br />DQU <br />CONDUIT <br />ASSEMBLY <br />cn Z} U - <br />Ir <br />z O z 0 <br />3 <br />1 " POWER/DATA187 <br />1/4" OD <br />REDUCE THREADS <br />0 <br />Llf Q>-Zfl <br />Z5 Lo <br />06 <br />d <br />COPPER TUBING. <br />FROM 1-1/2" TO <br />CONDUIT <br />0 <br />Z <br />Z 0- <br />z z <br />AVOID ANY <br />1/4" W/ DOUBLE <br />MANOMETER <br />1 MONITORING 187 <br />TRAPS! (BY <br />TAP BUSHING(S) <br />V8" x 2" SLOTS FOR ANCHOR <br />172 <br />CONTRACTOR) <br />VAPOR RETURN <br />BOLTS, 6 SPACESBACK <br />CHECKED BY: <br />TO TANKS <br />DRAWN BY: <br />ER <br />CONTAINMENT <br />PROJECT NO: <br />JUNCTION BOX <br />SUMP <br />DISPENSER DETAILS: <br />WAYNE OVATION (3+1) BLEND <br />DISPENSER INSTALLATION DETAILS <br />VST PHASE <br />11 W/ VEEDER—ROOT ISD <br />Mm5,3,25 <br />DISPENSERS SHALL BE MOUNTED <br />OR <br />2" INSIDE 3" FRP142 148 <br />PER MANUFACTURER'S INSTALLATION <br />SCALE: NTS <br />BALANCE PHASE II SYSTEM <br />INSTRUCTIONS. 6 BOLTS REQUIRED. <br />171 <br />" <br />1-1/22"x12" FLEX <br />PRODUCT LINE <br />HEALY PUMP 66 <br />215 VAPOR PRESSURE <br />CONNECTOR <br />3" D.W. FRP BONDED ENTRY 12612 <br />SENSOR <br />DISPENSER <br />2" INSIDE 3" FRP <br />FITTING W/ 4"x3" CONCENTRIC <br />SKIN <br />142 <br />148 VAPOR LINE <br />REDUCER W/ TEST PORT & <br />CABLE TO <br />5/8" COPPER TUBES & <br />1/4" PLUG (TYP.)-8D5DISPENSER <br />JUNCTION BOX <br />w 8 <br />FITTINGS SUPPLIED WITH <br />DOUBLE WALL UNDER <br />2 -WAY <br />HEALY VP1000 KIT <br />SUMP SENSOR IN 202 <br />SUMP FILLED WITH <br />HOLDER <br />CALIBRATION <br />PROPYLENE GLYCOL <br />C—C: FRONT VIEW SECTION DETAIL @ <br />DISPENSER SUMP <br />INTERSTITIAL FLUID, <br />SCALE: 1"=V-0" -0 <br />SUPPLIED BY BRAVO ONLY <br />VALVE <br />214 VAPOR FLOW <br />SENSOR <br />1" SHORT <br />° C <br />NIPPLE <br />82 VAPOR SHEAR <br />STABILIZER <br />VALVE <br />ASSEMBLY4r <br />1/4 OD��TREDUCE <br />THREADS <br />COPPER TUBING.ROM <br />1-1/2" TO <br />AVOID ANY/4" <br />W/ DOUBLE <br />TRAPS! (BYAP <br />BUSHING(S) <br />CONTRACTOR)APOR <br />RETURN <br />ACK TO TANKS <br />D <br />CONTAINMENT <br />SUMP <br />NOTE: CONDUITS SHALL NOT HEALY PHASE II W/ VEEDER—ROOT ISD <br />PENETRATE SUMP. ROUTE <br />THROUGH OFFSET FRAME SCALE: NTS VAC. ASSIST PHASE II SYSTEM <br />CAVITY. DO NOT CUT SIDE NOTE: <br />PANELS OF DISPENSER 1. ONLY (1) VAPOR PRESSURE CONCRETE SLAB <br />SENSING DEVICE REQUIRED c° <br />PER SITE. SENSOR SHALL BE <br />MOUNTED AT ONLY (1) •� <br />2 -IN -1 SENSOR 217 DISPENSER LOCATED CLOSEST a <br />ro <br />BOXTO TANKS. d <br />SUMP SENSOR 189 81 PRODUCT SHEAR 2. CONTRACTOR SHALL PITCH ALL <br />J -BOX � VALVE (TYP.) <br />DISPENSER SKIN DISPENSER 1/4" TUBING AS REQUIRED TO J <br />J BOX PIPING UNIONS AVOID ANY LIQUID TRAPS a <br />ELBY CAPPED <br />bp <br />a <br />BY WAYNE <br />ELBOW (TYP.) <br />a.., v. <br />NO. <br />Id• <br />DESCRIPTION <br />y . <br />a <br />82 VAPOR SHEAR VALVE <br />HYDROSTATIC SENSORDISPENSER <br />°° a a . a <br />� <br />INSIDE PRIMARY212 <br />0 <br />ISLAND <br />MANOMETER RESERVOIR <br />0 <br />0 <br />SEE SHEET M.5.3.26 FOR <br />ATTACHED TO SUMP <br />io <br />CONSTRUCTION DETAIL <br />SEAL OFF (TYP.) 191 <br />IF STEEL FORM <br />REQUIRED USE ITEMgp <br />2" OR 3" UNISTRUT PIP <br />a <br />d. <br />SEAL: <br />FESS /p <br />Gf-�gp�l <br />NO. 36475 <br />* XP. 6-30-22 <br />FOR PRE -FAB FORM <br />CLAIMP AS REQUIRE <br />�`a 'a a' <br />.. 'a <br />z <br />— 14 <br />• <br />w co <br />Q m <br />1 INTERCOM <br />a. <br />d <br />Z <br />z~�� <br />mZ <br />UOQ <br />DQU <br />CONDUIT <br />Q w <br />I I W w <br />cn Z} U - <br />Ir <br />z O z 0 <br />co <br />1 " POWER/DATA187 <br />zz <br />Q LU <br />p Z N <br />wz0-- <br />0 <br />Llf Q>-Zfl <br />Z5 Lo <br />06 <br />d <br />Q <br />ATMOSPHERIC <br />CONDUIT <br />0 <br />Z <br />Z 0- <br />z z <br />g <br />MANOMETER <br />1 MONITORING 187 <br />SITE ADDRESS: <br />ADDRESS <br />172 <br />1-1/2"x18" FLEX <br />CONDUIT <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT NO: <br />CONNECTOR <br />DRAWING TITLE: <br />DISPENSER DETAILS: <br />WAYNE OVATION (3+1) BLEND <br />DISPENSER INSTALLATION DETAILS <br />ON ISLAND (D.W. VAPOR) <br />SHEET NO: <br />Mm5,3,25 <br />OR <br />2" INSIDE 3" FRP142 148 <br />171 <br />" <br />1-1/22"x12" FLEX <br />PRODUCT LINE <br />CONNECTOR <br />3" D.W. FRP BONDED ENTRY 12612 <br />2" INSIDE 3" FRP <br />FITTING W/ 4"x3" CONCENTRIC <br />142 <br />148 VAPOR LINE <br />REDUCER W/ TEST PORT & <br />1/4" PLUG (TYP.)-8D5DISPENSER <br />DOUBLE WALL UNDER <br />CONTAINMENT <br />SUMP SENSOR IN 202 <br />SUMP FILLED WITH <br />HOLDER <br />PROPYLENE GLYCOL <br />C—C: FRONT VIEW SECTION DETAIL @ <br />DISPENSER SUMP <br />INTERSTITIAL FLUID, <br />SCALE: 1"=V-0" -0 <br />SUPPLIED BY BRAVO ONLY <br />NOTE: IF THERE IS NO ROOM TO INSTALL THE <br />VAPOR FLOW METER ABOVE THE SHEAR VALVE, <br />IT IS ACCEPTABLE TO INSTALL FLOW METER <br />BELOW SHEAR VALVE PER LATEST EDITION OF- <br />E.O. VR -202 ON HEALY SOLUTION & E.O. <br />VR -204 ON VST SOLUTION. SEE MOST RECENT <br />VEEDER ROOT INSTALLATION INSTRUCTIONS FOR <br />ISD FLOW METERS <br />WAYNE OVATION DISPENSER FRAME <br />2" OR 3" UNISTRUT PIPE----,,,_. <br />CLAIMP AS REQUIRED <br />6" WIDE DETECTABLE <br />UNDERGROUND MARKING <br />TAPE BURIED C-12" BELOW <br />FINISHED GRA E: EMPIRE <br />MAGNATEC # 1-143 <br />a <br />d ' <br />3" D.W. FRP BONDED <br />ENTRY FITTING W/ 4"x3" • <br />CONCENTRIC REDUCER W/ <br />TEST PORT & 1/4" PLUG <br />(TYP.) 12612 • <br />2" INSIDE 3" FRP 142 148 • <br />RECOVERY LINE <br />2" INSIDE 3" FRP 142 148o� <br />PRODUCT LINE � ,�,_ <br />"B" SIDE OF DISPENSER <br />215 VAPOR PRESSURE SENSOR <br />(ONLY 1 PER SITE) <br />214 VAPOR FLOW SENSOR <br />81 PRODUCT SHEAR VALVE <br />82 VAPOR SHEAR VALVE <br />DISPENSER ISLAND <br />C SEE SHEET M.5.3.26 FOR <br />CONSTRUCTION DETAIL <br />IF STEEL FORM <br />® REQUIRED USE ITEM <br />d v FOR PRE -FAB FORMgp <br />Q' d d <br />172 1-1/2"x`18" FLEX <br />CONNECTOR <br />OR <br />171 <br />1-1/2"x`12" FLEX <br />CONNECTOR <br />2" FRP TEE FITTING W/ <br />REDUCER BUSHINGS AT 1 <br />DISPENSER ONLY, 2" FRP <br />L ELBOW AT ALL OTHERS <br />,)umr JtIVJUK IIV 202 1 <br />PEA GRAVEL -/HOLDER <br />2" FRP ELBOW I �DCONTAINMENTH 164 144 DOUBLE WALL UNDER DISPENSER <br />2" FRP X 1-1 2" SUMP FILLED WITH <br />FNPT BUSHING PROPYLENE GLYCOL INTERSTITIAL <br />D—D — SIDE VIEW SECTION @ DISPENSER SUMP FLUID, SUPPLIED BY BRAVO ONLY <br />SCALE: 1"=V-0" <br />cw <br />1 <br />A <br />J <br />Q <br />U <br />a <br />LE <br />ADA COMPLIANCE NOTE: <br />WHEN DISPENSERS ARE INSTALLED AS <br />SHOWN ON THIS DRAWING, THE <br />REQUIREMENTS REGARDING HANDICAPPED <br />VERTICAL AND HORIZONTAL ACCESSIBILITY <br />ARE FULLY MET. <br />DIESEL WHIP HOSE 73 <br />DIESEL BREAKAWAY Z4] <br />DIESEL HOSE Z2] <br />NOTE: <br />CAT 5 CABLE SHALL BE INSTALLED <br />FOR BOTH ENHANCED OR STANDARD <br />ELECTRONICS <br />12" X 12" STEEL --------- <br />CANOPY COLUMN <br />4 PVC CANOPY <br />DRAIN EACH COLUMN <br />(1) 1 " CONDUIT TO <br />EACH COLUMN <br />SAFETY NOTE: <br />WHEN DISPENSERS ARE INSTALLED <br />AS SHOWN ON THIS DRAWING, THE <br />REQUIREMENTS OF NFPA 30A 6.3.9 <br />AND 6.3.9.1 REGARDING SHEAR <br />SECTIONS ARE FULLY MET. <br />DIESEL NOZZLE (TYP.) 70 <br />DIESEL SWIVEL (TYP.) 71 <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26FOR <br />CONSTRUCTION DETAIL <br />IF STEEL FORM <br />REQUIRED USE ITEM gp <br />FOR PRE -FAB FORM <br />EXPANSION JOINT <br />L"(TYP.) SEE <br />CONCRETE DETAILS 6" THICK, 4000 PSI. <br />,SHEET M.5.3.26 FIBER REINFORCED <br />FOR DETAIL CONCRETE DRIVE SLAB SEE <br />SHEET G.0.2.2. FOR SPECS. <br />a <br />4 d <br />v <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR Q <br />CONSTRUCTION DETAIL <br />D <br />IF STEEL FORM v OPTIONAL STORM DRAIN ---- <br />D <br />REQUIRED USE ITEM gp ROUTING, SEE CIVIL SITE <br />FOR PRE -FAB FORM N PLAN FOR ACTUAL <br />w ROUTING AND <br />CONTINUATION <br />X <br />a <br />I <br />� X <br />• <br />ILII a <br />bp <br />a <br />lir <br />a. d <br />a <br />a.., v. <br />NO. <br />Id• <br />DESCRIPTION <br />y . <br />a <br />r <br />G, . . <br />a d• <br />°° a a . a <br />� <br />a <br />LE <br />ADA COMPLIANCE NOTE: <br />WHEN DISPENSERS ARE INSTALLED AS <br />SHOWN ON THIS DRAWING, THE <br />REQUIREMENTS REGARDING HANDICAPPED <br />VERTICAL AND HORIZONTAL ACCESSIBILITY <br />ARE FULLY MET. <br />DIESEL WHIP HOSE 73 <br />DIESEL BREAKAWAY Z4] <br />DIESEL HOSE Z2] <br />NOTE: <br />CAT 5 CABLE SHALL BE INSTALLED <br />FOR BOTH ENHANCED OR STANDARD <br />ELECTRONICS <br />12" X 12" STEEL --------- <br />CANOPY COLUMN <br />4 PVC CANOPY <br />DRAIN EACH COLUMN <br />(1) 1 " CONDUIT TO <br />EACH COLUMN <br />SAFETY NOTE: <br />WHEN DISPENSERS ARE INSTALLED <br />AS SHOWN ON THIS DRAWING, THE <br />REQUIREMENTS OF NFPA 30A 6.3.9 <br />AND 6.3.9.1 REGARDING SHEAR <br />SECTIONS ARE FULLY MET. <br />DIESEL NOZZLE (TYP.) 70 <br />DIESEL SWIVEL (TYP.) 71 <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26FOR <br />CONSTRUCTION DETAIL <br />IF STEEL FORM <br />REQUIRED USE ITEM gp <br />FOR PRE -FAB FORM <br />EXPANSION JOINT <br />L"(TYP.) SEE <br />CONCRETE DETAILS 6" THICK, 4000 PSI. <br />,SHEET M.5.3.26 FIBER REINFORCED <br />FOR DETAIL CONCRETE DRIVE SLAB SEE <br />SHEET G.0.2.2. FOR SPECS. <br />a <br />4 d <br />v <br />DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR Q <br />CONSTRUCTION DETAIL <br />D <br />IF STEEL FORM v OPTIONAL STORM DRAIN ---- <br />D <br />REQUIRED USE ITEM gp ROUTING, SEE CIVIL SITE <br />FOR PRE -FAB FORM N PLAN FOR ACTUAL <br />w ROUTING AND <br />CONTINUATION <br />X <br />a <br />I <br />� X <br />• <br />ILII a <br />bp <br />a <br />lir <br />a. d <br />a <br />a.., v. <br />NO. <br />Id• <br />DESCRIPTION <br />y . <br />a <br />e , .• <br />° a <br />a a <• <br />G, . . <br />a d• <br />°° a a . a <br />.. a •a. d as 'a a <br />a a <br />d .d �4 <br />4.u. A . . . . . ..4 A <br />Iwo A, <br />' .a • v a b. <br />•(SEE STRUCTURAL) <br />DISPENSER ON ISLAND INSTALLATION DETAILS SIDE ELEVATION <br />SCALE: 1 " = V-0" <br />2 -IN -1 SENSOR BOX 21 <br />SUMP SENSOR J -BOX 18 <br />ELBY CAPPED ELBOW (TYP.) <br />SEAL -OFF (TYP.) <br />RUN CONDUITS THROUGH-\ <br />OFFSET IN DISPENSER <br />SUMP FRAME (TYP.)_,- <br />DISPENSER 187 <br />INTERCOM <br />CONDUIT <br />1 " DISPENSER <br />POWER & DATA 187 <br />CONDUIT <br />1" MONITORING 187 <br />CONDUIT <br />SUMP MONITOR <br />LIQUID SENSOR <br />DISPENSER <br />BRINE RESERVOIR & <br />212 HYDROSTATIC SENSOR <br />ATTACHED TO SUMP <br />DISPENSER JUNCTION <br />BOX (TYP.) <br />DISPENSER CONTAINMENT SUMP CONDUIT ROUTING DETAIL <br />SCALE: NONE <br />28.7 1, 26.9 <br />Elf o <br />c <br />wn <br />Lk <br />64 FUEL WHIP HOSE <br />z <br />�I <br />� 65 FUEL HOSE BREAKAWAY <br />0 <br />LL. <br />0 <br />O <br />U O z O <br />LL. <br />Oof <br />w �I <br />zl w <br />� U <br />Li <br />D52w WAYNE "OVATION" 3+1 <br />BLENDER <br />° <br />°°°O°° <br />rn <br />+ 61 NOZZLE (TYP.) <br />62 SWIVEL (TYP.) <br />Mi I <br />63 FUEL HOSE <br />I]ElElo <br />z o 0 0 <br />U O <br />Q <br />J SEE BOLLA D <br />o I I DETAIL 91 N <br />SHEET G.0 5 <br />� Q I <br />w o <br />c I <br />� I a I 3'-0" <br />I <br />� <br />V-1 J <br />as • <br />as <br />a I a <br />I a' <br />a .. <br />L I I EXPANSION <br />JOINT (TYP.) o <br />SEE CONCRETE 1 d <br />DETAILS SHEET <br />M.5.3.26 FOR a <br />D ETAI L <br />I I a <br />3'�8" <br />' ILII a: e � I ImI a <br />a .° 4 .. a• .a. :III., aI <br />NOTE: CANOPY FOOTINGS CAN BE VERY <br />• LARGE AND CAN VARY IN SIZES. SEE <br />STRUCTURAL DRAWINGS. <br />*MINIMUM RECOMMENDED <br />DIMENSION. SEE NOTE BELOW <br />LINE OF CANOPY / <br />COLUMN <br />/ I <br />STORM DRAIN ROUTING, SEE Z <br />CIVIL SITE PLAN FOR ACTUAL wlo <br />ROUTING AND CONTINUATION I U <br />ww <br />1 00 <br />LINE OF FOUNDATION <br />BELOW. (SEE <br />STRUCTURAL) I bi I\ <br />DISPENSER ISLAND 90 <br />* NOTE: THESE DIMENSIONS REPRESENT MINIMUM RECOMMENDED (TYP') <br />OFFSET DIMENSIONS TO PROVIDE DESIRED CLEARANCE OF THE <br />DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A <br />MAXIMUM 12"X12" NON-CLADDED COLUMN DESIGN. WHERE <br />ARCHITECTURAL COLUMN WRAPPING IS REQUIRED THE V-4 1/4" <br />MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. <br />DISPENSER ON ISLAND PLAN VIEW <br />SCALE: 1"=V-0" <br />*MINIMUM RECOMMENDED <br />DIMENSION. SEE NOTE BELOW <br />FRONT ELEVATION <br />85 DOUBLE WALL UNDER DISPENSER <br />CONTAINMENT SUMP FILLED WITH <br />PROPYLENE GLYCOL INTERSTITIAL <br />FLUID, SUPPLIED BY BRAVO ONLY <br />COMPACTED OR NATIVE SOIL <br />(TYPICAL) <br />NOTE: <br />IF REQUIRED BY LOCAL <br />CODES, EXTEND CONCRETE <br />UNDER BOLLARD BELOW THE <br />FROST LINE. <br />PROJECTION OF ADA REQUIRED <br />Ems <br />ADA PLATFORM (NTS SEE BELOW) <br />2'-6" 2'-6' / 1 <br />SIDE "B" <br />1 <br />w <br />w� <br />Oz <br />I Ld <br />z O <br />_jI w 00 I <br />I z z DISPENSER ISLAND <br />SEE SHEET M.5.3.26 FOR <br />/ o CONSTRUCTION DETAIL <br />IF STEEL FORM <br />REQUIRED USE ITEMgp 91 <br />FOR PRE -FAB FORM <br />SIDE "A" <br />3'-7y2" <br />3'-0" � <br />EXACT LOCATION <br />SUBJECT TO AUTHORITY <br />ADA REQUIRES 48"x30" MAX AREA IN FRONT OF XHAVING JURISDICTION. <br />BOTH SIDES OF MPD, SLOPE NOT TO EXCEED 2%.� SEE BOLLARD DETAIL <br />THERE SHALL BE A 10" MAX DISTANCE FROM THE ON SHEET G.0.5 <br />EDGE OF PLATFORM TO DISPENSER FACE FOR SID <br />REACHXX NOTE: INDICATES ITEMS FOUND ON <br />/1///////1//////L/ MATERIALS LIST SHEET M.5.3.01 & M.5.3.02 <br />CLIENT: <br />bp <br />4& <br />lir <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. <br />DATE <br />DESCRIPTION <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />io <br />SEAL: <br />FESS /p <br />Gf-�gp�l <br />NO. 36475 <br />* XP. 6-30-22 <br />ATF <br />OFF- CAUF��� <br />z <br />w <br />• <br />w co <br />Q m <br />UQm <br />o <br />Z <br />z~�� <br />mZ <br />UOQ <br />DQU <br />Q w <br />I I W w <br />cn Z} U - <br />Ir <br />z O z 0 <br />co <br />UUo <br />z <br />zz <br />Q LU <br />p Z N <br />wz0-- <br />0 <br />Llf Q>-Zfl <br />Z5 Lo <br />06 <br />z �t <br />Q <br />w00 w <br />z <br />0 <br />Z <br />Z 0- <br />z z <br />g <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT NO: <br />10/28/2019 <br />DRAWING TITLE: <br />DISPENSER DETAILS: <br />WAYNE OVATION (3+1) BLEND <br />DISPENSER INSTALLATION DETAILS <br />ON ISLAND (D.W. VAPOR) <br />SHEET NO: <br />Mm5,3,25 <br />