Laserfiche WebLink
4. Projects that include the use of an existing structure or building that was approved with a different occupancy classification than the proposed use, will constitute a change of occupancy. A change of occupancy will require a code analysis report and necessary plans prepared by a Registered Design Professional (architect or engineer) in accordance with the California Building Code and Existing Building Code in effect on the application date for the building permit(s). The report and plans shall identify existing conditions, propose alterations necessary to bring each building into compliance with the code. 5. The applicable accessibility requirements as outlined in Chapter 11 B of the California Building code shall be included with the building permit plan set for each new or altered structure or building including the project site plan. 6. Adequate sanitary facilities shall be provided for the facility, per the requirements of Chapter 4 of the California Plumbing Code. 7. If the project includes landscaping, it will be required to comply with the Model Water Efficient Landscape Ordinance requirements of the California Code of Regulations, Title 22, Division 2, Chapter 2.7. 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209] 468-3000, see response dated February 20, 2020) 3. ENVIRONMENTAL HEAL TH DEPARTMENT (Contact: [209] 468-3420, see response dated January 9, 2020) 4. STOCKTON FIRE DEPARTMENT (Contact: [209] 937-8271, see response dated December 30, 2021) FOR NOTES AND INFORMATION ONLY: See the San Joaquin Council of Governments response dated March 28, 2022. See the City of Stockton response dated January 4, 2022. See the United Auburn Indian Community response dated April 21, 2022. PA-2100195 -Conditions of Approval 3