My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:54:23 PM
Creation date
12/16/2021 11:31:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
[REV] MAY & JULY 2014 RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-2 <br />Water. There are three agriculture water wells at the Forward LandfilllRRF/Composting <br />Facility site. One well. located near the main entrance to the landfill was drilled to a depth of <br />approximately 135 feet and groundwater occurs at a depth of approximately 70 feet. This <br />well was likely installed before the opening of the landfill. having been previously used for <br />agricultural purposes. It is pumped at a rate of approximately 1500 gallons per minute <br />(gpm ) at a maximum frequency of approximately 27 times during a typical work day. <br />Another well is located south of the South Fork of South Littlejohn's Creek. in the southeast <br />corner of the RRF/Compost Facility area . and has a capacity of 500 gpm. The third well is <br />located along the northern boundary of the landfill. This well was installed in 1972 and has <br />a production of approximately 60 gpm. The fact that groundwater flow near the Forward <br />Landfill is not modified by pumping from this well suggests that it is screened in a confined <br />unit below the uppermost groundwater units that are monitored at the site. One domestic <br />well. is located along the eastern boundary of the site. just south of the entrance to the <br />RRF/Compost Facility. The locations of the wells located in the RRF/Compost Facility area is <br />shown on Figure 2. A 2,000 gpm well at t he landfill entrance facility, a 1,000 gpm well for <br />fire and dust cont rol at the rear of the RRf, and a 20 gpm for domestic use loeated in the <br />front of the facility. There will be an approximate 8,000 gallon water tanl~ located in the <br />South l\rea near the Compost faci lity operations area. <br />On -site water uses include site construction and waste disposal operations, th e RRF and <br />compost operations, mainly utilize water for dust control, compaction. irrigation. equipment <br />maintenance operations, sanitary facilities, fire fighting, and emergency situations. Bottled <br />water is provided for drinking. <br />Sanitary Facilities. There are no on-site sewage disposal system or leach lines. Portable <br />toilets are provided at the site to provide sanitary facilities. which are serviced daily or as <br />needed. Two portable toilets are located adjacent to the landfill office. two are located at <br />the RRF . two are in the maintenance yard . and two are located near the working face. Hand <br />washing facilities are located in each portable toilet and an additional facility is located near <br />the office trailer.. The sanitary fac ilities cons ist of a total of eight toilets at the site. Two <br />portab le toi lets are located adjacent to the landfill office trailer, two are located within the <br />office trailer, two are located at the RRf, one is in the ma i ntenance yard at the landfi ll, and <br />one is located on the bin storage pad at t he landfi ll. The two portab le toilets adjacent to the <br />landfill office and the two toilets inside the office trailer are handicap accessible. The <br />locations/quantities of portable toilets will change with daily operations as the site-1§ <br />developedmeffi. <br />Electricity. PG&E provides primary electric service to the site. Electric power is provided to <br />the office trailers (except the employee trai ler at the RRf) and onsite pumping facilities. <br />There is night/security lighting at the landfill and RRF/Composting Facility entrances. <br />Communications. AT&TThe telecommunications provider delivers provides telephone <br />service to the site. The siteCompany offices and key site personnel have some vehicles <br />used for s ite operations are equipped with phones . The site has five telephone lines for <br />business and emergency use. In addition . each employee is assigned a cell phone with <br />H wo -way radio s capability for emergency and work communications.and cell phones are <br />a lso provided to personnel. <br />Forward Compostlng Facility SWT Engineering <br />Report of Composting Site Information -May 2014 <br />z:\projects\allied waste \forward\resource recovery facil ity\5 yr perm it rvw 2013·14\rcsi 2014\text\sec 2 -revtr .doc
The URL can be used to link to this page
Your browser does not support the video tag.