Laserfiche WebLink
2-20 <br />locked when the site is not in operation. Access through the landfill and RRF/Compost <br />Facility entrances is controlled by the office trailer attendants. The eastern side of the site <br />(Austin Road) is landscaped with trees and the RRF/Compost Facility has a 5 -foot high <br />earthen berm on a portion of the southern and eastern sides to limit the site visibility from <br />the road. The equipment maintenance area and storage yard at the landfill is fenced and is <br />locked when the site is closed. In addition, the site has night security when the site is <br />closed. <br />2.3.4 Roads <br />Descnbe constflietion and pmeedures for ensuring that mads and dFivewaj's are <br />construeted of reasonably smooth surfaees designed to minimice the generation of dust and <br />the traek/ng of mateFia/ onto adjacent paved public roads. Also deseFilJe how roads and <br />driveways will IJe eonstrueted to withstand regular and thorough Gleaning and IJe able to <br />provide reasonable all weather aceess to the faeility. <br />The entrance to the RRF/Compost Facility is all-weather surfaces. Onsite roads are <br />constructed /improved as needed to allow all weather access . These onsite roads will be <br />constructed with onsite soils, crushed asphalt or aggregate, or both. The roads are <br />maintained by site personnel. As previously mentioned . the first 120 feet of the entrance <br />road are paved . This area is swept. as needed. Debris is picked up . the roads are graded <br />occasionall y. and watered dail y for dust control. Since the roads and entrance facility area <br />are not paved, there is no thorough cleaning. In addition, litter is raked and picked up~ <br />hand . In the event that dirt is inadvertentl y tracked onto Austin Road by vehicles leaving the <br />site . the street sweeper will be deployed. Dirt tracl{ed onto Austin Road by vehic les entering <br />and leaving the site is eleaned up by Forward personnel. The site is graded to provide all - <br />weather access._ <br />2.3.5 Visual Screening <br />Descr/be how the (aeility will be maintained to prm'/de an aesthetically acceptable <br />appearanee as apprm«Jd bj' the LEA and the loea/land use AuthoFity. <br />A portion of theH1e southern and eastern (Austin Road) sides of the site have a 5 -foot high <br />earthen berm to limit the site visibility from the road. In addition, the eastern side of the site <br />(Austin Road). southern side of the site. and the Compost Facility /RRF landfili entrance area <br />have been landscaped with trees and brush. <br />Forward Composting Facility SWT Engineering <br />Report of Composting Site Information -May 2014 <br />z-\projects\alli ed waste\forward\resource recovery fa cillty\5 yr permit rvw 2013-14\rcsl 2014\te!l,1,\sec 2 -revt r.docz:\wejeGts\a ll lea <br />· .... as te\feFWafel \ress!jF oe rees\'e f)' fa oi llty \~ yr Ileffflit r¥w 2913 14\£ssi 2914 \(911('(59 6 2 9Ff.aes