Laserfiche WebLink
3 -1 <br />3.0 COMPOSTING FACILITY OPERATIONS <br />If the compos#ng facility is to be located on a closed landfill, any impacts to the closed <br />landfill callsed by the facility operation shall be described. These lmpacls may include <br />increased settlement of waste, impacts to OAvkonmental contFO! facilities, and traffic <br />imf]acts. <br />Forward does not plan to locate the Compost Facility on a closed landfill. Forward operates <br />a landfill on land north of the South Fork of South Littlejohn's Creek . <br />3.1 Introduction <br />Inc/lide a dCSCfipti~le statement of the operations condllcted at the faoility. Inc/f:Jde f]/anned <br />hOllrs ofoperat/on and how tacllity design wi/I accommodate planned hot:H's. <br />The Compost Facility w+lt--use ~ various the methods of composting as discussed in Section <br />1.3.1. A detailed operating description is listed in Section 3.4the Materia ls ~andling <br />Activ ities and Proeessing Operations sections of th ise RCSI. The RRF and Compost Facility <br />are permitted to operate between the hours of 6:00 a.m. to 6:00 p.m. Monday through <br />Saturday. However . the RRF is open to receive materials from private customers Monday <br />through Friday from 7:00 a.m. to 4:30 p.m. In addition, ancillary operations are also <br />conducted on Saturday from 6:00 a.m. to 2:30 p.m. No equipment maintenance or <br />operation is performed outside of the permitted hours of operation. Forward Inc. will provide <br />30 days prior notice to the LEA for any proposed change within the limitations of the current <br />SWFP (i.e.! not an extension of hours). A proposed change (i.e .. extension ) to these hours of <br />operation would require a SWFP revision. The site is closed on Sundays . as well as on--8ftEJ <br />four holidays per year Christmas Day and f New Year's Day , Easter, Ju ly 4th, and Christmas). <br />In addition, the business hours for the company office (in Stockton) are from 8:00 a.m. to <br />5:00 p.m. Monday through Friday. <br />3.2 Facility Personnel <br />3.2.1 Availability <br />All employees are placed on a 6 -month review period ("probation") at hire. The onsite <br />personnel (including employees currently under review) consists of the following staff: <br />1 Operations manager <br />1 Wood grinder lead person <br />2 General laborers and egquipment operators (duties also include general labor) <br />2 Laborers <br />1 Water truck driver <br />1 Secretary/office trailer attendant (part time) <br />Tempora ryies laborers. as needed <br />The revised operations and waste stream will have no immediate effect on the number of <br />onsite personne l. Additional personnel will be added on an as-needed basis when, and if, a <br />demand arises. Exact numbers of additional personnel are not known at this time. <br />3.2.2 Training <br />Forward Composting Facility SWT Engineering <br />Report of Composting Site Information -May 2014 <br />z:\projects\all ied waste \forward \resource recovery facility \5 yr perm it rvw 2013-14\rcsi 2014\text \sec 3 -revtr.do c