Laserfiche WebLink
3-16 <br />Active compost containing biosolids waste will be are operated at the minimum temperature <br />and process time requirements presented in Table .4~. <br />3.5.7 Compliance Monitoring Program <br />Describe the eofR{Jliance monitoring program established to achim'O com{Jl/ance with the <br />environmental health standa/vs .. <br />Forward w#l--follow§ a compliance monitoring program as required by 14 CCR, Section <br />17868.1 for biosolids composting facilities and mixed solid waste composting facilities. <br />Biosolids. Active compost containing biosolids arewill be monitored for metals, pathogen <br />density, and active compost temperature at the frequency listed in Table .5.M . <br />To meet the requirements of 14 CCR, Section 17868.1, at least one composite sample iswfU <br />be analyzed for every 5,000 cubic yards of compost produced. <br />A composite sample wfU-consist§ of twelve mixed samples of equal volume. <br />Four samples will be extracted from within the compost pile, each at a different cross - <br />section as follows: <br />• One-half the horizontal width of the pile <br />• One -fourth the horizontal width of the pile <br />• One -eighth the horizontal width of the pile <br />At least one temperature reading will be is taken daily per either 150 feet of Windrow, or <br />fraction thereof, or for every 200 cubic-yards of active compost, or fraction thereof. <br />Daily temperature measurements sha ll be ~measured for pathogen reduction as follows: <br />• Windrow composting processes is shall be monitored 12 to 24 inches below the pile <br />surface. <br />• Aerated static pile composting processes (if proposed in the future) shall be <br />monitored 12 to 18 inches from the point where the insulation cover meets the <br />active compost. <br />Mixed Solid Waste. The applicable environmental health standards for composting mixed <br />solid wastes are as follows: <br />(1) At least one composite sample shall be tested for every 5,000 cubic yards of mixed <br />solid waste compost produced. The samples shall meet the metals standards in <br />Tab le .a;h3 and pathogen density requirements. <br />(2) Measure moisture a nd oxygen content of active compost on a weekly basis at the <br />point of temperature measurement. <br />As previously mentioned, records of moisture and temperature monitoring are will be <br />maintained at the facility. <br />3.6 Compost Facility Controls <br />1,£ the CGm{JostiRg facility /s to be located on a closed landfill, leachate contrel, and <br />monitoring systems for the eofR{JostiRg facility shall be separate from those for the closed <br />/andf#/ (14 CCR, Seetion 18227itr:f)}. <br />Forward Composting Facility SWT Engineering <br />Report of Composting Site Information -May 2014 <br />z:\projects \aili ed waste \forward\resource recovery facility \5 yr perm it rvw 2013-14\rcsi 2014\text\sec 3 . revtr.doc