My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014570
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Q
>
QUASHNICK
>
5653
>
2600 - Land Use Program
>
SU-89-1
>
SU0014570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 4:02:57 PM
Creation date
12/27/2021 2:16:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014570
PE
2600
FACILITY_NAME
SU-89-1
STREET_NUMBER
5653
Direction
E
STREET_NAME
QUASHNICK
STREET_TYPE
RD
City
STOCKTON
APN
08607014
ENTERED_DATE
12/8/2021 12:00:00 AM
SITE_LOCATION
5653 E QUASHNICK RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 7 <br /> PC : 10-20-88 <br /> Tract # 2246 <br /> Page 9 <br /> f . The drainage and water systems shall conform to the North <br /> Morada Area Water and Storm Drainage Plan. Dedication of <br /> the needed area for pond expansion and provision of ter- <br /> minal drainage is required. Verification of water supply <br /> adequacy per County standards and Title 22 is required <br /> prior to acceptance of improvement plans for the sub- <br /> division. This will require water production facilities <br /> in this subdivision. <br /> g. The developer/owner shall participate in the Area of <br /> Benefit for the design and construction of the water and <br /> storm drainage systems. <br /> h. The area shall annex to North Morada County Service Area <br /> No . 46 prior to acceptance of the Final Map to provide for <br /> operation and maintenance of the storm drainage and <br /> domestic water systems . <br /> i . The subdivider shall agree to and shall pay service fees <br /> for the County-provided utility services in an amount <br /> equal to the estimated fees for the period from the accep- <br /> tance of the improvements until the effective date of <br /> assessment on the tax roll . Deposit of fees shall be sub- <br /> mitted at the time of acceptance of the facilities by the <br /> County. <br /> j . A Preliminary Soil Report shall be required. <br /> 4 . Air Pollution Control District : <br /> a. The following dust control measures shall be used during <br /> site preparation as well as construction period: <br /> ( 1 ) Grading shall be done during the spring while the <br /> ground is still damp from rain. <br /> ( 2 ) Water trucks and/or sprinklers shall be used as often <br /> as necessary to control dust . <br /> ( 3) Trees shall be planted on the site prior to construc- <br /> tion. These would act as wind breaks. <br /> ( 4) Water from an existing well shall be available for <br /> irrigation and dust control . <br /> (5 ) Instead of disking for weed control in the spring, the <br /> applicant shall mow, thereby leaving the ground <br /> undisturbed and with a mulch covering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.