Laserfiche WebLink
Special Provisions - CIPP (Con't) <br /> If soft and spongy soils are encountered, soil shall be stablized or replac- <br /> ed in conformance with Section 19 of the Standard Specifications. Should <br /> conditions be encountered under portions of the pipeline which make the <br /> use of cast-in-place pipe unsatisfactory, in the judgement of the Engineer, <br /> he may require the use of precast pipe in such locations. The additional <br /> special inspection cost provided for later in this section shall not be appli- <br /> cable to precast pipe so substituted. <br /> At the time of concrete placement, all soils in contact with cast-in-place <br /> pipe shall be moist, stable and the trench shall be completely free of water, <br /> mud and debris. <br /> Concrete shall be mixed and placed in conformance with the applicable <br /> portions of the Standard Specifications, except as directed by these <br /> Special Provisions. <br /> Fresh concrete shall not be permitted to fall from a height greater than <br /> six (6) feet without the use of adjustable length pipes or elephant trunks. <br /> Minimum wall thickness for the various sizes of pipe shall conform to the <br /> fol lowing: <br /> Internal Diameter Minimum Wall Thickness <br /> 30" 3111 <br /> 48" 5" <br /> 60" 6" <br /> 72" 7" <br /> The actual internal diameter of the pipe at any point shall not be less <br /> than 98% of the nominal internal diameter. Offsets at form laps and <br /> horizontal edges shall not exceed the thickness of the forms plus seven <br /> (7) percent of the minimum wall thickness. <br /> The temperature of the concrete, when being placed shall not be more <br /> than 90 F. in moderate weather. In weather during which the mean <br /> daily temperature drops below 40 F. , concrete when placed, shall not <br /> be less than 50 F. , and if the daily mean temperature remains below <br /> 40 F. for more t ferfhglT`d;�y'srlf e7 ctineret"hall�#�maj�.p ed at <br /> a temperature ofd qN agr.'ealer fpr, a period bf seventy `�Yo 2) hours <br /> after_-placing. C me`iib' b_!gt6d LAgatNlst f ee �r ? n add- <br /> itional three (3) days. <br /> s`teuP„a � a'Ld d ti ey I�em � d <br /> When artificial heat is required, caution shall be exercised to prevent <br /> the concreterL HP'u iY.*intpncy --- -------- -------•------------_--- ------- ------.................... <br /> LIC " r <br /> ......... ....... ..................... <br /> Concrete shale€rrr}irec� b1C__RRg.Rf.the- two-following--methods: <br /> ................. .......................................................- ................... ,I <br /> O ;h'r ---- _]G..... ............... <br />