My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014621
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LEVER
>
0
>
2600 - Land Use Program
>
EIR-3-85
>
SU0014621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 3:59:10 PM
Creation date
2/8/2022 11:44:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014621
PE
2600
FACILITY_NAME
EIR-3-85
STREET_NUMBER
0
STREET_NAME
LEVER
STREET_TYPE
BLVD
City
STOCKTON
APN
16307041
ENTERED_DATE
12/10/2021 12:00:00 AM
SITE_LOCATION
LEVER BLVD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Charter Wav 6 Stockton Street - Add one through lane on all <br /> four approaches. On the westbound Charter a <br /> roach, this <br /> can be accomplished by converting the existing exclusive <br /> right-turn lane to a combined through or right-turn lane. <br /> signalization was recommended above to mitigate <br /> existing-plus-project traffic impacts. (Project ' <br /> 14 percent. ) s share is <br /> Eighth Street 6 Fresno Avenue - Add one lane <br /> southbound Fresno approach. to the <br /> Add one lane each to the <br /> eastbound Eighth approach and the westbound. Eighth <br /> approach. The need for signalization at buildout levels is <br /> marginal , therefore retain 4-way STOP sign controls <br /> recommended for . existing- plus-project case. (Project 's <br /> share is 50 percent. ) <br /> K�hth Street 6 Argonaut Street - Add one lane each to the <br /> eastbound and westbound Eighth approaches. The need for <br /> signalization at buildout levels is marginal , therefore <br /> install 3-way STOP sign controls. (Project 's share is 12 <br /> percent. ) <br /> Eighth Street 6 Stockton Street - Add one lane each to the <br /> eastbound and westbound Eighth approaches. The need for <br /> signalization at buildout levels is 'marginal , therefore <br /> install 3-way STOP sign controls. (Project:.s share is 9 <br /> percent. ) <br /> Eighth Street 6 Lever Boulevard - Add one lane each to the <br /> eastbound and westbound Eighth approaches . The need for <br /> signalization at buildout levels is marginal , therefore <br /> install 3-way STOP sign controls . See the discussion below <br /> of alternative improvement measures for this and the Lever <br /> intersection. (Project 's share is 6 percent. ) <br /> Eighth Street b Manthev Road - Add a through lane to the <br /> eastbound Eighth approach and, for continuity, also add a <br /> through lane to the westbound Eighth approach. Add a lane <br /> to the northbound Manthey approach, to provide separate <br /> left-turn and right-turn lanes . The proximity of this <br /> intersection to the I-5 Ramps intersections makes it <br /> desirable to coordinate the signal control at this <br /> intersection with the traffic signals recommended below for <br /> the I-5 Ramps intersections . See the discussion below of <br /> alternative improvement measures for this and the Lever <br /> intersection. (Project 's share is 5 percent. ) <br /> Eiahth Street & I-5 SB Ramps - Install a 3-phase traffic <br /> signal . (Project "s share is 6 percent. ) <br /> T// Joseph R Holland 8 <br /> �TJ� P Consulting Traffic Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.