Laserfiche WebLink
  <br />  <br />SP 32  <br />  <br />panelboards and controls for 208/120 Volts and forty‐eight (48”) inches for 480 Volts.   <br />Attention shall be paid to the California Electrical Code Articles 110‐16 and 384‐4.  <br />  <br />G. No roof penetrations allowed.  Flash and counter‐flash wall penetrations.  Conduits  <br />passing through finished walls shall be fitted with steel escutcheon plates, chrome or  <br />paint finish as needed to match existing area or as directed.  Conduits which  <br />penetrate floor slabs and concrete or masonry walls shall be grouted and sealed  <br />watertight at penetration.  <br />  <br />H. Provide fire‐stop systems consisting of a material, or combination of materials  <br />installed to retain the integrity of fire resistant rated construction by maintaining an  <br />effective barrier against the spread of flame, smoke and hot gases through  <br />penetrations, fire resistive joints, and perimeter openings in accordance with the  <br />requirements of the CBC, Fire Codes, Fire Marshal, and the Authority Having  <br />Jurisdiction (AHJ).  <br />  <br />I. Electrical safety codes are intended to be performed and supervised by ‘trained’  <br />personnel only.  It is expected that during the execution of this work that the same  <br />professional practices will be used and that only qualified technicians skilled and  <br />trained in their area of expertise will perform the work.  <br />  <br />J. Work shall be performed on de‐energized equipment only.  Personal Protective  <br />Equipment (PPE) shall be provided by the Electrical Contractor (EC) as appropriate for  <br />the work being performed.  PPE equipment shall comply with the requirements of  <br />DOSH, OSHA, and NFPA 70E and a complete job risk assessment and strategy  <br />reviewed with the employee before work begins.   <br />   <br />K. All equipment shall be installed in a neat, workmanlike manner in accordance with  <br />national, state, and local regulations and adopted standards with the approval of the  <br />AHJ.  <br />   <br />L. Electrical system tests shall be performed by a factory trained technician using the  <br />manufacturer’s approved test equipment and methods.  Tests shall be conducted,  <br />and electrical equipment replaced until 100%.  Demonstrate to the owner, engineer,  <br />and the AHJ that the entire installation is complete and in proper operating condition  <br />in compliance with the job intention and specifications.  <br />  <br />M. Maintain a safe working environment including traffic controls and prompt removal  <br />from the site all demolished, unused, and hazardous materials.  All materials shall be