Laserfiche WebLink
Item No.'_ <br />Pc: 2-5-81 <br />S-81-3/7-81-14 <br />Page 3 <br />The cost of providing interim housing for this total number of <br />projected students will be over $1,500,000.00, for grades K-6. <br />Woodbridge School and Lodi High will also be effected by the <br />additional students. <br />At the present time the District does not have a means of financing <br />permanent school facilities. Therefore, we are aksing that this type <br />of project be temporarily put on hold until the developers assume <br />responsibility for providing housing for students from their projects. <br />Below is a copy of the "District's Statement Relative to New <br />Housing Developments": <br />District's Statement Relative to New Housing Developments <br />- Lodi Unified School District is experiencing an acute shortage of <br />adequate school housing. The Declaration of Impaction prepared in <br />July of 1979 continues to justify the need for local governmental <br />agencies to levy the Development Fee. This fee has been withheld from <br />the District by court action. <br />That Impaction Statement identifies some five thousand pupils coming <br />to the District that cannot be guaranteed housing. Additional <br />developments, currently advanced for approval, will cause even <br />greater problems. <br />There is no way that Lodi Unified School District or its constituents, <br />by their own actions, can generate construction funds. The State has <br />loaned the Lodi Unified School District 32 portable classrooms which <br />will arrive for the school year 1980-81. The District will continue <br />to pursue other funds if available from the State. However, the <br />promise of such assistance is small to non-existent compared to the <br />cost of meeting existing and projected housing inadequacies. <br />The District strongly requests that governmental agencies place a <br />temporary hold on approving additional growth inducing projects <br />until the firm enactment of a procedure where land developers assume <br />responsibility for the housing of the additional students their <br />developments bring to the District.. <br />- Woodbridge Fire District - The tentative subdivision map of Woodbridge <br />Village has been received and reviewed by this department. The <br />following comments and recommendations should be reviewed by the <br />committee: <br />1. Water Supply: The required fire flow shall be 1500 gallons per <br />minute for a duration of 2 hours minimum residual water pressure <br />of 20 PSI is required during flow. <br />2. Water Mains: Minimum size of mains shall be 8". The system shall <br />be installed to that a single break in any feature of the supply <br />works will not prevent delivery of maximum daily consumption plus <br />standard fire flows. Sufficient valves shall be provided so that <br />no single accident breakage or repair will necessitate shutting <br />down a length of pipe greater than 800 feet. <br />