Laserfiche WebLink
groundwater, and which will endure permanently under the conditions of <br />the proposed use. <br />B. Leach Field Pipe: SDR 26 Perforated Poly Vinyl Chloride (PVC) material; inside <br />nominal diameter as indicated on the Drawings. Surrounded by 3/" drain rock 4" <br />on each side. <br />C. Pressure (Force Main) Pipe: Schedule 40 Poly Vinyl Chloride (PVC) material; <br />inside nominal diameter as indicated on the Drawings. <br />Fittings: ASTM D2466, PVC. <br />Joints: ASTM D2855, solvent weld. <br />Flexible connectors: 1.5 -inch and larger — General Rubber Corporation <br />Maxi -Joint Style 1010 flanged single sphere connector with EPDM <br />elastomers. <br />2.2 SEPTIC TANKS <br />G. Septic Tanks: As indicated on the Drawings. (Refer to Sewer System Data Table <br />on Sheet C4.0.) Septic tanks: shall be a single-wall fiberglass reinforced plastic <br />(FRP) Underwriters Laboratories -labeled, IAPMO approved, H2O traffic rated, <br />underground storage tanks as shown on the drawings. The tank size, fittings and <br />accessories shall be as shown on the drawings. Interior appurtenances shall all <br />be provided and installed by the tank manufacturer (excluding pump, float <br />switch support and pump discharge piping). Effluent filters shall be provided by <br />the Contractor and installed in the factory by the tank manufacturer. No <br />connections to the tank shall be made in the field except for piping connections <br />to inlet and outlet piping and piping connections through risers. Risers shall be <br />provided by the tank manufacturer and installed in the field. <br />Access Opening: <br />All tanks shall require at least two access openings, see project <br />plans for access configuration. <br />b. All access openings shall be a minimum of 30", complete with <br />riser, lid, and necessary hardware. See project plans for access <br />configurations. <br />Inlet Piping: <br />All tanks shall be equipped with factory -installed, inlet and outlet <br />piping. See project plan details for discharge assemblies. <br />Discharge assemblies shall conform to the force main connecting <br />pipe. <br />SP 26 <br />