My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:53:16 PM
Creation date
5/12/2022 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pipe&Conduit <br /> Pipe Entries <br /> If Standard Dispenser Pans are ordered,it is necessary to install the Pipe Entry Boots prior to installing the dispenser pan. Included with each dispenser pan is <br /> the"Pipe Entry Guide"which contains the pipe entry location points for a variety of dispenser models. The bottom of each Standard Dispenser Pan has two cen- <br /> ter reference lines for accurate entry point measurements. Install the Pipe Entry Boots as follows: <br /> Step #1 Step #2 Step #3 Step #4 <br /> At the measured entry point drill out After the stud holes have been Insert the studded rubber boot into Pre-assemble the shear valve,flex- <br /> a 1/4" hole. Fasten the dispenser drilled, remove the Entry Boot the five stud holes from underneath ible connector, Shear Valve <br /> pans Entry Boot Templet 11 to the Templet 11 from the bottom of the and then from inside the pan install Bushing and Shear Valve Plate as <br /> bottom of the pan,as shown. Next dispenser pan. Using a 2-1/2"hole the corrugated rubber boot onto the shown on page 3. Insert the <br /> drill out the five holes for the Pipe saw,drill out the pipe entry opening studs. Next, install the compres- assembly down through the Pipe <br /> Entry Boot studs. using the center hole as a guide. sion ring and the nut fasteners. Entry Boot, as shown, and then <br /> tighten the band clamp. <br /> e� OOl <br /> t J- <br /> Conduit Entries <br /> Conduit Entry Boots must be field installed for both Standard and Custom Dispenser Pans. The Conduit Entry Boot is available in 3/4"size only. For conduit <br /> sizes other than 3/4"the Flexible Entry Boots should be installed. Make sure all Pipe Entry Boots are installed prior to installing the Conduit Entry Boots. <br /> Step#1 Step #2 Step#3 Step #4 <br /> Drill a 1/4"hole at the desired con- After drilling the four stud holes, Insert the Conduit Entry Boot After the Conduit Entry Boot has <br /> duit entry point. Install the dis- remove the Entry Boot Templet Il through the opening and stud holes been installed,insert the 3/4"metal <br /> penser pan Entry Boot Templet 11 to from the bottom of the dispenser from underneath the dispenser pan. conduit up through the bottom of <br /> the bottom of the dispenser pan,as pan. Using a 1-1/2"hole saw,drill From inside the dispenser, insert the boot and then tighten the band <br /> shown. Next,drill the holes for the out the conduit entry opening using the metal compression ring down clamp. Note: For conduit sizes <br /> Conduit Entry Boot studs. the center hole as a guide. over the studs and then install fas- other than 3/4", use the Flexible <br /> teners. Entry Boots. <br /> I� <br /> ;o <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.