My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 11:24:29 AM
Creation date
5/23/2022 11:15:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br />been addressed for AM PM HAMMER/15 FOOD #83113 as of August 11, 2022. <br />Open violations from May 25, 2022 inspection <br />Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br />the report. <br />OBSERVATION: An inspection was last done on 5/26/2021 and an inspection report was issued identifying <br />information to be submitted to bring this site into compliance. This information was required to be submitted by <br />6/25/2022. This information has not been received resulting in a non-compliant status for this facility. <br />REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br />corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br />all of the recommendations made in the report. The operator shall submit a written response that includes a <br />statement documenting corrective actions taken or proposing corrective actions which will be taken. <br />CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br />submitted and all corrections implemented within 30 days of receiving an inspection report. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #205 - Failure to have current UST Monitoring Plan readily accessible at the facility. <br />OBSERVATION: An approved copy of the monitoring plans were not available for inspection. <br />REGULATION GUIDANCE: A copy of these plans shall be accessible on site at all times. <br />CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.