Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> the need to avoid effects on sensitive <br /> biological resources adjacent to construction <br /> areas and the penalties for not complying with <br /> applicable state and federal laws and permit <br /> requirements.The biologist will inform all <br /> construction personnel about the life history <br /> and habitat requirements of special-status <br /> species with potential for occurrence onsite, <br /> the importance of maintaining habitat,and the <br /> terms and conditions of required permit <br /> conditions.The environmental training will also <br /> cover general restrictions and guidelines that <br /> must be followed by all construction personnel <br /> to reduce or avoid effects on sensitive <br /> biological resources during project <br /> construction. <br /> 4.6-1 b: Install Fencing and/or Flagging to Action: Project Biologist/ San Joaquin County <br /> Protect Sensitive Biological Resources. Install fencing Construction Contractor <br /> Prior to construction,the construction and/or flagging. <br /> contractor shall install high-visibility orange Timing: <br /> construction fencing and/or flagging,as <br /> appropriate,along the perimeter of the work Prior to Initials Initials <br /> area when adjacent to Environmentally construction. <br /> Sensitive Areas(ESAs)(e.g.,special-status <br /> species habitat,and active bird nests,native Date Date <br /> oaks,and surface water features).The County <br /> will ensure that the final construction plans <br /> show known locations where fencing will be <br /> installed(such as along the Woodbridge <br /> Irrigation Canal southern bank).The plans <br /> shall also define how to locate appropriate <br /> ESA fencing which shall include all locations <br /> identified on the plans and additional locations <br /> identified by a qualified biologist as part of an <br /> initial field walk with the lead contractor.This <br /> may result in identification of ESAs within the <br /> Section 1.0 Introduction 6 August 2022 <br />