My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-1900240
>
SU0014989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:06:37 AM
Creation date
6/8/2022 4:29:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014989
PE
2633
FACILITY_NAME
PA-1900240
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908007, -29, -30
ENTERED_DATE
6/8/2022 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
6/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> northern buffer that require protection(based <br /> on final planting and drainage plans).The <br /> contractor shall ensure ESA fencing is <br /> maintained throughout the duration of the <br /> construction period. If the fencing is removed, <br /> damaged,or otherwise compromised during <br /> the construction period,construction activities <br /> shall cease until the fencing is repaired or <br /> replaced.The project's special provisions <br /> package shall provide clear language <br /> regarding acceptable fencing material and <br /> prohibited construction-related activities, <br /> vehicle operation,material and equipment <br /> storage,and other surface-disturbing activities <br /> within ESAs.All temporary fencing shall be <br /> removed upon completion of construction. <br /> 4.6-1 c: Sanford's Arrowhead. Action: Project Biologist San Joaquin County USFWS, <br /> Prior to ground disturbance within the northern Sanford's CDFW,CNPS <br /> boundary proposed 100-foot buffer,the arrowhead surveys. <br /> following actions shall be implemented to <br /> avoid potential impacts to Sanford's Timing: <br /> arrowhead. If no ground disturbance occurs Prior to ground <br /> within the buffer area,no mitigation is required. disturbance within Initials Initials <br /> Perform focused plant surveys the Northern buffer <br /> according to USFWS,CDFW,and CNPS area. <br /> protocols.Surveys should be timed according Date Date <br /> to the blooming period for target species(May <br /> through October)and known reference <br /> populations, if available. <br /> • The USFWS generally considers <br /> plant survey results valid for approximately <br /> three years.Therefore,follow-up surveys may <br /> be necessary if Project implementation occurs <br /> after this three-year window. <br /> Section 1.0 Introduction 7 August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.