Laserfiche WebLink
Item No. 2 <br /> PC: 11-19-92 <br /> SU-92-9 <br /> Page 9 <br /> d. Grading in excess of 5,000 cubic yards shall comply with Section 7014 for 'Engineered <br /> Grading Requirements.' <br /> e. All recommendations of the soils engineer shall be incorporated in the grading plan. <br /> f. All compaction reports must be submitted prior to a foundation inspection. <br /> g. All grading permits are subject to approval by the other departments. <br /> h. All grading authorized by the permit shall be approved prior to the issuance of any <br /> building permits or the beginning of any construction. <br /> 5. CALT:-aNS: <br /> a. A 50-foot building setback is required along the western property line of Lots 1 and 7. <br /> 6. PACIFIC GAS & ELECTRIC: <br /> a. Ten-foot-wide public utility easements shall be dedicated along the perimeter of all streets <br /> of the subdivision. <br /> b. Any existing PG&E facilities affected by the project will be relocated or placed <br /> underground at the owner's or developer's expense. <br />