Laserfiche WebLink
- <br /> 77 Jr <br /> ruary 7,. 1 <br /> Project <br /> 2 <br /> Recommendations <br /> 1 Require the site. operator to construct the impervious soil <br /> liner up the sides of the trench to seal off the permeable sand <br /> Tens exposed near the north end of the trench and any similar <br /> sands exposed elsewhere in the sides of the trench. <br /> 2. Since the in6place materials permeability is significantly higher <br /> than the 10 cm/sec. level required for a' Class: il-J site, require <br /> either placement of the impervious soil liner or a gravel drain, <br /> against the remaining sides of the trer►ch. <br /> . Assumiril that, a second trench will be excavated west of and parallel <br /> to the first, require monitoring wells to be located (a) at the <br /> north end of the existing trench* (b) at the northwest corner of the <br /> future trench, and (c) the west side of the midpoint of the future <br /> trench. The wells: should be drilled to a depth .of 60 feet and <br /> be` Constructed to intercept percolation from the bottom of the hole <br /> up to".within 20 feet or the surface. <br /> Upon receipt of these recommendations, Beta Aisociates drilled3-test honings <br /> at the locations shown on the attached Plate 1 , Site Sketch. Each well <br /> boring was logged to its total depth and a grounwater sample was collected <br /> ,and submitted for baseline chemical analysis as required by :monitor.t-ng and <br /> reporting program No. 73-183, attached to the Discharge Requirements. Legs <br /> of the well boriiog-and results of baseline chemical analysis are attacher. <br /> in the appendices to this letter. Each boring was completed as a rnoniioring <br /> well .in accordance with the specifications shown on Plate 2, Monitoring, Well l: <br /> Deta if, <br /> Plate 3, Trench Detail, dhows the FMC disposal trench in both plan view <br /> and cross section. 'rhe upper 2--feet of .the trench floor has been co,cipacted <br /> toachieve permeabilities less than 10-b miser_. CYavei drains with a depth <br /> of 2-feet have been installed along each trench wal:1 terminating in the <br /> sump at the low end of the trench. Compacted.>soil• liners have been placed <br /> adjacent to granular lenses which crop out on-the. north side of each trench <br /> wall . These soil liners consist of silty clay and have been compacted to <br /> 85% of their relgtive maximum density. This results in permeabiiities in <br /> the range of 10� cm/sec. (see soil test data in Appendix B of thls letter) . <br /> PROPOSED DISPOSAL OPERATION <br /> Portions of the waste stream to be handled at the Forward Site Consists <br /> of dry, solid wastes which are currently stored at .grcund surface at the <br /> FMC Plant. The remainder are suspected of t+,v�, g a variablt. moist,:re <br /> content and are currently contained in pond enclosures on the plant <br /> property. <br /> GBetac_ lssociates `x <br />