Laserfiche WebLink
RCRA Permit - Fo d Landfill Is May 1991 <br /> EPA I.D. CAD 990 794 133 Modification 0 <br /> for all releases of hazardous waste or constituents <br /> from any Solid Waste Management Unit (S ) , regardless <br /> of when waste was placed in the unit, for all permits <br /> issued after November 8, 1984. <br /> 2. If the Director receives any information, receives a <br /> request for modification or revocation and reissuance <br /> under 40 CFR 124.5, or conducts a review of the permit <br /> file, the Director may determine whether one of the <br /> causes listed in 40 CFR 270.41(a) or (b) for permit <br /> modification or revocation and reissuance exists. If <br /> cause exists, the Director may modify or revoke and <br /> reissue the permit accordingly, subject the limitations <br /> of 40 CFR 270.41(c) , and may request an updated ap- <br /> plication if necessary. <br /> 3. As of the date of issuance of this permit, S 's in <br /> existence include: <br /> Resource Recovery Unit <br /> WMU-A <br /> WMU-B <br /> WMU-C <br /> WMU-D <br /> WMU-E <br /> WMU-F <br /> WMU-G <br /> WMU-H <br /> CLOSED SURFACE IMPOUNDMENTS LOCATED UNDER -D <br /> IX. RCRA FACILITY INVESTIGATION (RFI) <br /> 1. The Permittee submitted RCRA Facility Investigation <br /> Workplan, Forward Landfill ( leinfelder, March 2, <br /> - - 1990) . . This workplan is hereby approved. In addition, <br /> the Director has received the letter dated January 18, <br /> 1991 requesting changes to the March RFI Workplan. <br /> These changes are hereby approved limited by permit <br /> condition IX.1.a. <br /> a. The Permittee shall incorporate a discussion in <br /> the draft RFI Report being submitted pursuant to <br /> permit condition IX.2.a on any RFI workplan re- <br /> quirements not completed. <br /> 2. (a) Within 60 days after completion of the RFI, the <br /> Owner/Operator shall prepare a RCRA Facility In- <br /> vestigation Report. The RFI Report shall be <br /> developed in draft form for review by the Direc- <br /> tor. The RFI Report shall be developed in final <br /> form within thirty (30) days of receipt of EPA <br /> comments on the Draft RFI Report. <br /> 36 <br />