Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TRACY SHELL as of May05 , 2023 . <br /> Open violations from January 30 , 2023 inspection <br /> Violation #208 - Failure to comply with the designated operator inspection requirements . <br /> 1 ) OBSERVATION Designated operator reports were not signed within the required time frame . <br /> -The designated operator reports were not signed by the owner/operator. <br /> REGULATORY GUIDANCE Within 48 hours of the completion of the designated UST operator visual inspection , <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report , the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report , acknowledging the identified compliance <br /> issues . <br /> CORRECTIVE ACTION : Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future . <br /> ----------------------------------------------------------------------------- <br /> 2 ) OBSERVATION The designated operator failed to document all the alarms from the attached alarm history on <br /> the designated operator inspection reports and failed to check that they were responded to appropriately. The <br /> missing alarms include : <br /> -Q1 ( 87 product) PLLD shutdown alarms on 4/ 15/22 and 7/29/22 <br /> -Q2 ( 89 product) PLLD shutdown alarms on 7/29/2022 <br /> -Q4 (diesel product) PLLD shutdown alarms on 5/28/2022 <br /> REGULATION GUIDANCE: During the inspection , the designated operator shall review the alarm history since the <br /> previous inspection , check that each alarm was documented and responded to appropriately , and attach a copy of <br /> the alarm history with documentation taken in response to any alarms to the inspection report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports . <br /> ----------------------------------------------------------------------------- <br /> 3 ) OBSERVATION The designated operator failed to check and note all required items on the visual inspection <br /> reports . <br /> -The designated operator reports were missing the owner/operator description of corrective actions regarding <br /> scheduling overfill prevention inspection . <br /> REGULATION GUIDANCE: During the visual inspection , the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION : Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 3 of 6 <br />